At a glance

Fluidstack, a New York-based company that builds and runs AI data centers, makes modular data center equipment at a factory in two leased Luke Field buildings with Glendale, Arizona addresses. Fluidstack said on November 24, 2026 that the Glendale plant was up and running and will support 1,250 jobs. Maricopa County issued permits in September 2026 for production lines and fabrication lines in the two buildings Fluidstack leases. Fluidstack says its Arizona plant will supply Blackbird modules, Compute Modules and Electrical Skids for AI data centers.

Key facts

Arizona locations (2)
Headquarters
New York, New York
Ownership
Private company
Website
fluidstack.io

Sources: Google Maps: Map of Maricopa County Assessor parcel 501-52-005S, Google Maps: Map of Maricopa County Assessor parcel 501-52-005Q, Fluidstack (PR Newswire), U.S. Securities and Exchange Commission · Addresses open Google Maps in a new tab

How does Fluidstack fit into AI?

Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where Fluidstack sits on it. Stages not marked below are shown for context and are not claims about Fluidstack.

  1. Chip design: Companies like Nvidia, Apple and AMD design the chips. Chip designers decide what a chip does and hand the blueprint to a factory. Designers such as Nvidia, Apple and AMD do that work elsewhere, then send the designs to fabs. None of them owns a fab of its own.
  2. Wafer fabrication: Fabs print billions of transistors onto silicon wafers. A fab prints a design onto a polished disc of silicon called a wafer, layer by layer, until billions of transistors exist where there was blank material. It is the hardest and most expensive step in the chain, and the reason a single factory can cost tens of billions of dollars.
  3. Advanced packaging: Wafers are cut and assembled into finished chips. Packaging cuts a finished wafer into individual chips and assembles them, often stacking several pieces of silicon and memory into one component. For AI chips this step is nearly as demanding as fabrication, and a wafer is not a usable product until it is done.
  4. Servers and devices (here today): Chips are built into AI servers, phones and PCs. Builds data center modules in Arizona. Finished chips are assembled into the things people actually buy and deploy: data-center servers, phones, laptops. This is where a chip stops being a component and starts being a product.
  5. AI in use: Data centers and devices run AI models on that silicon. The end of the chain: models answering questions, generating images and driving software, running on the silicon every earlier step produced. Every AI service anyone uses is running on physical hardware somewhere, and that hardware started as a wafer.

Fluidstack: Servers and devices (here today)

  • Glendale plant supplies all three new products (company-reported): Fluidstack says its Glendale plant will supply Blackbird modules, Compute Modules and Electrical Skids for AI data centers. Source: Fluidstack (PR Newswire)
  • Six-month build is a company target (company-reported): Blackbird is a modular 400 MW data center design Fluidstack says can be built in six months; deployments have yet to show it. Source: Interesting Engineering

About Fluidstack

What Fluidstack does

Fluidstack says it builds AI data centers in the United States, "from the factory floor to the finished campus." Gary Wu and Jamie Cox, who met at Oxford, started Fluidstack in 2017, according to Forbes; César Maklary, the third co-founder, joined in 2020. Gary Wu is chief executive.

Headquarters and ownership: Fluidstack moved its global headquarters to Midtown Manhattan in New York City in December 2025. Fluidstack Ltd, a private company registered in England (Companies House no. 10985545), reports its private share sales to the SEC on Form D; the June 30, 2026 notice reported $729,999,546 sold of a $1.5 billion offering.

Funding: In July 2026 Fluidstack announced an $830 million Series A at a $7.5 billion valuation, led by Situational Awareness.

Anthropic: In November 2025 Anthropic announced a $50 billion investment "building data centers with Fluidstack in Texas and New York." Neither company's announcement names Arizona, and Fluidstack's November 2026 release about its Arizona plant does not mention Anthropic.

In Arizona

The factory: Fluidstack says its first manufacturing facility is "now up and running in Glendale, Arizona," in two Luke Field buildings totaling more than 1.1 million square feet, and that it converted the site "from an empty shell to an operating plant in six months." Fluidstack says the plant will support 1,250 permanent manufacturing and skilled trades jobs. Current openings are in the jobs section of this page.

The buildings: Luke Field's landlord, Lincoln Property Company, announced on June 24, 2026 that a company in the AI sector would lease Building A (695,750 sq ft) and Building B (454,761 sq ft), without naming it. KTAR and the Phoenix Business Journal identified the tenant as Fluidstack from a financing statement recorded with Maricopa County on June 5, 2026 (no. 20260339836), which names Fluidstack Int LLC and the property owner, Northern Parkway Owner LLC.

The two buildings are at:

County permits: The site has Glendale addresses but is in unincorporated Maricopa County, so its building permits are issued by the county, not the City of Glendale. The county issued the Building A permit for production lines on September 23, 2026, describing "a new tenant build-out for a new manufacturing facility," and the Building B permit for fabrication lines and distribution storage on September 14, 2026, for a plant that will make "fully integrated, transportable technology mezzanine modules."

A partial-occupancy permit issued September 16, 2026 covers a secured area for "initial employee operational training." On November 27, 2026 the production and fabrication permits showed as issued, not finaled, and the office build-outs for both buildings were still in review.

As of November 27, 2026, no Arizona Commerce Authority, City of Glendale or Maricopa County announcement or incentive for the plant has been published, and Fluidstack has not announced an Arizona data center. The plant makes data center equipment; it is not a data center.

Role in AI and chips

On November 24, 2026 Fluidstack launched Blackbird, a modular 400 MW data center design it says can be built in six months, along with a Compute Module and an Electrical Skid. DCD reports all three are made at the Glendale plant.

A company target: Interesting Engineering noted that the six-month timeline "remains a company target" that actual deployments have yet to prove.

Other projects: DCD reports that Fluidstack began building a data center project in Wythe County, Virginia, in November 2026 and is developing or operating data centers in Indiana, Texas and New York.

Fluidstack in Arizona: By the Numbers

Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.

  • Arizona factory floor area: More than 1.1 million sq ft (company-reported)
  • Jobs the plant will support (company figure): 1,250 permanent jobs planned (projected)
  • Open Arizona jobs, updated daily: None listed right now
  • Made in Arizona: Blackbird modular data center modules, Compute Modules and Electrical Skids (company-reported)
  • Leased Luke Field buildings: 2 buildings (A and B) (company-reported)
  • County production permits issued: September 2026, for production lines (Building A) and fabrication lines (Building B)

The Arizona build-out, 2017 to 2026

  • 2017: Founded
  • 2025: Global headquarters moved to New York City
  • 2026: Luke Field leases announced
  • 2026: Fluidstack says the plant is running

Fluidstack Factory, Luke Field Building A, Glendale, Arizona

MeasureValueAs ofBasisSource
Address7911 N Litchfield Rd, Glendale, AZ 853072026-11-27verifiedGoogle Maps
Building size695,750 sq ft2026-06-24company-reported From the company's own published information.Lincoln Property Company
Production line build-outPermit issued September 23, 2026 for production lines; described as "a new tenant build-out for a new manufacturing facility"2026-11-27verifiedMaricopa County Planning and Development

Fluidstack Factory, Luke Field Building B, Glendale, Arizona

MeasureValueAs ofBasisSource
Address13543 W Northern Ave, Glendale, AZ 853072026-11-27verifiedGoogle Maps
Building size454,761 sq ft2026-06-24company-reported From the company's own published information.Lincoln Property Company
Fabrication line build-outPermit issued September 14, 2026 for fabrication lines and distribution storage, to make "fully integrated, transportable technology mezzanine modules"2026-11-27verifiedMaricopa County Planning and Development
Partial occupancy for trainingPermit issued September 16, 2026 for a secured area for "initial employee operational training"2026-11-27verifiedMaricopa County Planning and Development

Facilities

MeasureValueAs ofBasisSource
Permitting authorityMaricopa County (the site is in unincorporated Maricopa County; its addresses say Glendale)2026-11-27verifiedMaricopa County Assessor
Shell to operating plant (company figure)Six months2026-11-24company-reported From the company's own published information.Fluidstack
Luke Field leases announcedJune 20262026-06-24company-reported From the company's own published information.Lincoln Property Company
Fluidstack says the plant is runningNovember 20262026-11-24company-reported From the company's own published information.Fluidstack

Investment

MeasureValueAs ofBasisSource
Series A funding (company announcement)$830 million at a $7.5 billion valuation2026-07-20company-reported From the company's own published information.Fluidstack
Private share sale reported to the SEC (June 2026)$729,999,546 sold of a $1.5 billion offering2026-06-30verifiedU.S. Securities and Exchange Commission

Production

MeasureValueAs ofBasisSource
Anthropic data center partnership (not in Arizona)$50 billion of data centers with Fluidstack in Texas and New York, announced November 20252025-11-12company-reported From the company's own published information.Anthropic

Other

MeasureValueAs ofBasisSource
County filing naming FluidstackFinancing statement recorded June 5, 2026 (no. 20260339836), naming Fluidstack Int LLC and the owner, Northern Parkway Owner LLC2026-06-05verifiedMaricopa County Recorder
Founded20172017-09-28verifiedCompanies House (UK)
Global headquarters moved to New York CityDecember 20252025-12-04company-reported From the company's own published information.Fluidstack (PR Newswire)
Chief executiveGary Wu2026-11-24company-reported From the company's own published information.Fluidstack (PR Newswire)

Sources

Fluidstack Jobs in Arizona (0 open)

Fluidstack in Arizona: Key Developments

No coverage of Fluidstack in Arizona has been picked up yet. Browse all Arizona AI news.

Fluidstack in Arizona: Common Questions

How many jobs does Fluidstack have open in Arizona right now?

Arizona AI is not tracking any open Fluidstack roles in Arizona at the moment. Listings refresh automatically twice a day.

How do I apply for a job at Fluidstack in Arizona?

Each listing on this page links through to Fluidstack's own application page. Arizona AI does not collect applications or charge job seekers, and roles are aggregated from the employer's official careers system rather than from third-party recruiters.

Does Fluidstack have a data center in Arizona?

Fluidstack has not announced an Arizona data center as of November 27, 2026. Fluidstack's Arizona site is a factory at Luke Field near Glendale that makes modular data center equipment, which Fluidstack says it will supply to AI data centers.

Where is Fluidstack's factory in Arizona?

Fluidstack leases Buildings A and B at Luke Field: 7911 N Litchfield Rd, Glendale, AZ 85307 and 13543 W Northern Ave, Glendale, AZ 85307. The addresses say Glendale, but the site is in unincorporated Maricopa County, so the county issues its building permits.

What does Fluidstack make in Glendale, Arizona?

Fluidstack says the plant will supply its Blackbird modular data center modules, Compute Modules and Electrical Skids. Maricopa County's permit describes the products as "fully integrated, transportable technology mezzanine modules."

How many jobs will Fluidstack's Arizona plant create?

Fluidstack says the plant will support 1,250 permanent manufacturing and skilled trades jobs. That is the company's plan, not a current headcount.

Is Fluidstack's Arizona plant part of its Anthropic deal?

Neither company has said so. Anthropic's November 2025 announcement covers data centers with Fluidstack in Texas and New York, and Fluidstack's November 2026 release about the Arizona plant does not mention Anthropic.