By Arizona AI · Profile reviewed · 41 sourced facts
KPPC Advanced Chemicals is the U.S. subsidiary of KANTO-PPC, a maker of ultrapure chemicals used to clean and etch chips. It is building a chemical plant in Casa Grande, Arizona, where satellite images show site work under way since June 2026, and U.S. import records show it already receiving chemical shipments from Taiwan, many labeled "(TSMC)". KPPC plans over $120 million for the first phase, with production anticipated in late 2027, and says the plant will supply TSMC and Intel.
Sources: Pinal County Assessor, Arizona Commerce Authority: KPCT To Build Semiconductor Chemical Manufacturing Facility In Casa Grande, Arizona Commerce Authority: KPPC Advanced Chemicals Breaks Ground On U.S. Ultrapure Chemical Manufacturing Campus In Casa Grande · Addresses open Google Maps in a new tab
Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where KPPC Advanced Chemicals sits on it. Stages not marked below are shown for context and are not claims about KPPC Advanced Chemicals.
KPPC Advanced Chemicals Inc. is the U.S. subsidiary of KANTO-PPC, a maker of electronic-grade wet chemicals and a member of the Kanto Group. KANTO-PPC describes itself as a maker of ultra-high purity electronics grade chemicals, photoresist ancillaries and high selective etchants for the semiconductor and optoelectronic industries in Asia.
Its record with TSMC: TSMC named KANTO-PPC among its Excellent Performance Award winners for chemical material in 2018, and again in 2019 for quality collaboration. KPPC's 2025 announcement describes the Kanto Group as the world's No. 1 semiconductor wet chemical supplier, citing a 2025 Linx Consulting ranking.
Who leads it: Jerry Lu is chairman and chief executive of Kanto-PPC. Austin Lu, KPPC's general manager, represented the company before the Casa Grande City Council.
KPPC is building its U.S. Arizona Plant on a 26.21-acre site in Casa Grande's Sonoran Valley Industrial Park, and gives a Chandler business address.
Construction status: As of November 2026 the plant is in early construction. The Arizona Department of Environmental Quality approved stormwater coverage for construction on the site, permit AZC115672, on April 9, 2026, for 26.25 acres, with planned construction dates of May 1, 2026, to October 27, 2027. Copernicus Sentinel-2 satellite images show no graded surface on the site through June 9, 2026, a graded area of about 3 acres by June 17, 2026 (about 4 acres by June 20), and no roofed building on November 26, 2026. City staff approved the Phase 1 site plan with conditions, as reported to the Planning and Zoning Commission on April 2, 2026. KPPC has named Sundt as the project's contractor. In January 2026 the project team told AZBEX the December groundbreaking had been entirely ceremonial.
The Chandler address: KPPC lists 3133 W. Frye Rd., Suite 101, Chandler as its address in its permit file with the City of Casa Grande, and a Google Maps listing in KPPC's name shows the same address.
The land: In July 2022, AZ Big Media reported that KPPC Advanced Chemicals Inc. had closed on about 50 acres in Casa Grande for about $3.7 million, in parcels of 26.22 and 24 acres. The plant site lies between Thornton Road and Burris Road, north of Commerce Drive; the Pinal County Assessor lists the parcel, owned by KPPC Advanced Chemicals Inc., at 1250 W. Ash Ave., which KPPC's plans call the corner of Ash and Burris.
What the plant will make: Phase 1, on about 6 acres, is planned for the purification and blending of semiconductor-grade chemicals, including hydrochloric acid and ammonium hydroxide, with warehousing, laboratories and offices. For Phase 1 the plans show a tank building, a two-story office and lab and a truck filling area, with a 40,970-square-foot manufacturing building marked as future. KPPC has reserved space for a semiconductor-grade sulfuric acid facility within five to seven years, subject to market conditions and customer demand.
Trucks: KPPC's traffic letter in the city file expects 10 to 12 trucks a day on weekdays. At the council hearing, KPPC's team committed to routing its trucks via Interstate 8, not Pinal Avenue; the project narrative in the city file had described a route by way of Thornton Road and Cottonwood to Pinal Avenue.
Money and jobs: The state's announcement gives over $120 million for Phase 1, about 80 jobs at first and 200 at full build-out, and about $500 million in total investment by 2035. KPPC's appeal letter to the City Council, as the council minutes summarize it, gives about $120 million and 61 full-time positions for Phase 1, up to 80 jobs at Phase 1 full production, and an additional $360 million plus additional jobs for Phase 2 and later.
KPPC's own figures differ between its state announcement and its letter to the city, so both are shown.
The timeline: KPPC held a groundbreaking on December 19, 2025, and production is anticipated to begin in late 2027. The City Council approved the plant's use permit on February 2, 2026, after the Planning and Zoning Commission had denied it (see "Controversies and Issues").
The earlier sulfuric acid plan: In July 2022 Chemtrade announced KPCT Advanced Chemicals LLC, a joint venture owned 51% by the Kanto Group and 49% by Chemtrade, to build an ultrapure sulfuric acid plant in Casa Grande; Jerry Lu, chief executive of KPPC Advanced Chemicals, commented on the venture in Chemtrade's announcement. The state announced it that November as a $200 million plant making 100,000 metric tons a year. Chemtrade and its partner put the project on hold in June 2023. Chemtrade said in February 2024 that the joint venture had applied for CHIPS Act funding. Its 2025 annual information form, dated March 2026, names KPPC as owner of 51% of the venture and Chemtrade of 49%, says the project is still on hold, and shows a 2024 write-down of C$3.8 million on Chemtrade's investment. KPPC's 2026 permit file describes the sulfuric acid facility it reserved space for as a project "previously reviewed by the City".
KPPC says its Casa Grande chemicals will be used in wafer cleaning, etching, chemical mechanical planarization (CMP), photolithography and advanced packaging.
Customers: KPPC says the plant will supply TSMC, Intel, Micron and other chipmakers across the United States. At the City Council hearing, Austin Lu said the finished products are intended for TSMC's fabs in north Phoenix and for Intel in Chandler.
Shipments labeled for TSMC, from Taiwan: While the plant is being built, U.S. import records show KPPC receiving ocean shipments of chemicals from KANTO-PPC and E Kay Technology of Taoyuan, Taiwan, through the Port of Los Angeles since 2023; recent shipments are hydrochloric acid and ammonia solution in tank containers. ImportKey lists 142 import shipments in the 12 months to November 27, 2026, the latest on November 21, 2026; only ImportKey gives that count. Many of the bills of lading carry "(TSMC)" in the cargo description, as shown on ImportKey, ImportGenius and ImportInfo. In four records, KPPC is the shipper from Taiwan and the consignee is Taiwan Semiconductor Manufacturing at TSMC Arizona's address, 5088 W. Innovation Circle, Phoenix; the latest arrived October 26, 2026. The records do not show where cargo went after Los Angeles.
The shipment records are U.S. Customs and Border Protection bill of lading data as republished by ImportKey, ImportGenius and ImportInfo. Customs does not let the public examine vessel manifests directly; it releases manifest information on request or as purchased data files (19 CFR 103.31), so these records could not be checked against a government site. They show what was declared on shipping documents and may be incomplete.
Permit denied, then approved on appeal:
_Permit · Resolved · 2026_
On January 8, 2026, a few weeks after the groundbreaking event, a motion to approve KPPC's use permit failed 3 to 4 at the Casa Grande Planning and Zoning Commission, denying the permit. Commissioners cited concerns about hazardous material trucks traveling through residential areas, as the city has no bypass route, the Pinal Post reported. On appeal, the City Council approved the permit 7 to 0 on February 2, 2026, after KPPC committed to routing its trucks via Interstate 8. The city attorney told the council it is not recommended to make specific truck routes a condition of the permit, and a council member noted that similar promises had been made in the past. As of November 27, 2026, the permit stands.
Sulfuric acid joint venture on hold:
_Delay · On hold · 2023_
Chemtrade said in June 2023 that, together with its partner, it had put the KPCT Advanced Chemicals project on hold, about 11 months after announcing it, after the estimated cost rose to US$300 million to US$380 million, about 50% over the original estimate. In August 2025, Argus Media reported that Chemtrade gave no update on the Casa Grande project, which had been on indefinite hold since 2023. Chemtrade's 2025 annual information form, dated March 2026, still describes the joint venture as on hold.
Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Role | Will purify and blend ultrapure chemicals for chip fabs | 2026-02-02 | company-reported From the company's own published information. | City of Casa Grande |
| Parcel | APN 503-48-0170, zoned General Industrial (I-2) | 2026-02-02 | verified | City of Casa Grande |
| Address | 1250 W. Ash Ave., Casa Grande, AZ 85193 | 2026-11-27 | verified | Pinal County Assessor |
| Status | Under construction: site work visible since June 2026; no building was visible on November 26, 2026 | 2026-11-26 | verified | Arizona Department of Environmental Quality |
| State construction stormwater permit | ADEQ coverage AZC115672, approved April 9, 2026, for 26.25 acres; planned construction May 1, 2026, to October 27, 2027 | 2026-04-09 | verified | Arizona Department of Environmental Quality |
| Contractor | Sundt | 2026-02-18 | company-reported From the company's own published information. | Construction Equipment Guide |
| Phase 1 site plan | Approved with conditions by city staff (case DSA-25-00125), reported April 2, 2026 | 2026-04-02 | verified | City of Casa Grande |
| Site work visible in satellite images since | June 2026 | 2026-11-26 | verified | Copernicus Sentinel-2 (processed by Arizona AI) |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Address | 3133 W. Frye Rd., Suite 101, Chandler, AZ 85226 | 2026-02-02 | company-reported From the company's own published information. | City of Casa Grande |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Groundbreaking for the U.S. Arizona Plant | December 19, 2025 | 2025-12-22 | verified | Arizona Commerce Authority |
| Buildings on the site plans, including a future manufacturing building | 88,798 sq ft | 2026-02-02 | company-reported From the company's own published information. | City of Casa Grande |
| Architect | WMA Architects | 2026-02-02 | company-reported From the company's own published information. | City of Casa Grande |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Casa Grande land purchase reported | July 26, 2022 | 2022-07-26 | verified | AZ Big Media |
| Price reported for the land (2022) | About $3.7 million | 2022-07-26 | verified | AZ Big Media |
| Investment for Phase 2 and later, in KPPC's appeal letter | An additional $360 million | 2026-02-17 | company-reported From the company's own published information. | City of Casa Grande |
| KPCT Advanced Chemicals joint venture announced | July 18, 2022 | 2022-07-18 | announced From a public announcement. Plans can change. | Chemtrade Logistics Income Fund (Business Wire) |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Jobs planned at full build-out | 200 full-time positions | 2025-12-22 | projected A forward-looking estimate, not a measured result. | Arizona Commerce Authority |
| Phase 1 full-time positions in KPPC's appeal letter | 61 | 2026-02-17 | company-reported From the company's own published information. | City of Casa Grande |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| What Phase 1 will make | Purified semiconductor-grade hydrochloric acid and ammonium hydroxide, and blended chemicals for photoresist removal, metal and oxide cleaning and fine slurry preparation | 2026-02-02 | company-reported From the company's own published information. | City of Casa Grande |
| Space reserved on the site | A semiconductor-grade sulfuric acid facility, anticipated within five to seven years, subject to market conditions and customer demand | 2026-02-02 | projected A forward-looking estimate, not a measured result. | City of Casa Grande |
| Chipmakers KPPC says the plant will supply | TSMC, Intel, Micron and other chipmakers across the United States | 2025-12-22 | company-reported From the company's own published information. | Arizona Commerce Authority |
| Where KPPC told the council its products will go | TSMC's fabs in north Phoenix and Intel in Chandler | 2026-02-17 | company-reported From the company's own published information. | City of Casa Grande |
| TSMC supplier award to KANTO-PPC | 2018: Excellent Performance Award, chemical material | 2018-12-06 | verified | TSMC |
| KPCT sulfuric acid plant, as announced (2022) | 100,000 metric tons of electronic grade acid a year on 10 acres, with about 65 jobs, operational by 2025 | 2022-11-22 | announced From a public announcement. Plans can change. | Arizona Commerce Authority |
| U.S. import shipments to KPPC, 12 months to November 2026 | 142 | 2026-11-27 | verified | ImportKey (U.S. Customs bill of lading data) |
| Shipments from KPPC in Taiwan to TSMC Arizona's Phoenix address | 4 | 2026-11-27 | verified | ImportKey (U.S. Customs bill of lading data) |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Planning and Zoning Commission vote on the permit | Motion to approve failed 3 to 4 on January 8, 2026, denying the permit until the council approved it on appeal | 2026-02-17 | verified | City of Casa Grande |
| General manager | Austin Lu | 2026-02-17 | company-reported From the company's own published information. | City of Casa Grande |
| KPCT joint venture put on hold | June 23, 2023 | 2023-06-23 | verified | Chemtrade Logistics Income Fund (Business Wire) |
| Ownership of the KPCT sulfuric acid joint venture | KPPC 51%, Chemtrade 49%; on hold as of March 2026 | 2026-03-06 | company-reported From the company's own published information. | Chemtrade Logistics Income Fund |
| KPCT joint venture applied for CHIPS Act funding | Reported February 2024 | 2024-02-20 | company-reported From the company's own published information. | Chemtrade Logistics Income Fund |
| Measure | Value | As of | Basis | Source |
|---|---|---|---|---|
| Chemtrade write-down on the KPCT joint venture (2024) | C$3.8 million | 2025-12-31 | company-reported From the company's own published information. | Chemtrade Logistics Income Fund |
Arizona AI does not currently read an online jobs board for KPPC Advanced Chemicals, so openings are best checked on the company's own website. Arizona AI does not collect applications or charge job seekers.
Phase 1 of KPPC's U.S. Arizona Plant is planned to purify semiconductor-grade hydrochloric acid and ammonium hydroxide and blend chemicals used for photoresist removal, metal and oxide cleaning and slurry preparation, according to its permit file with the City of Casa Grande. KPPC has also reserved space for a sulfuric acid facility within five to seven years.
Not yet from Arizona: its Casa Grande plant is in early construction, and KPPC says the plant will supply TSMC, Intel, Micron and other chipmakers once production starts, expected in late 2027. Meanwhile, U.S. import records republished by ImportKey and other customs-data sites show KPPC receiving chemical shipments from Taiwan since 2023, many labeled "(TSMC)" in the cargo description, and four shipments sent by KPPC from Taiwan to Taiwan Semiconductor Manufacturing at TSMC Arizona's Phoenix address. TSMC gave KPPC's parent, KANTO-PPC, supplier awards in Taiwan in 2018 and 2019.
Yes, in its early stage. The Arizona Department of Environmental Quality approved stormwater coverage for construction on the 26-acre site on April 9, 2026, and satellite images show the ground graded between June 9 and June 17, 2026. No roofed building was visible on November 26, 2026. KPPC has named Sundt as its contractor and expects production to begin in late 2027.
KPPC is building its plant on a 26.21-acre site at 1250 W. Ash Ave., Casa Grande, AZ 85193 in the Sonoran Valley Industrial Park, between Thornton Road and Burris Road north of Commerce Drive. Its business address is 3133 W. Frye Rd., Suite 101, Chandler, AZ 85226, the address in its city permit file.
Yes. On January 8, 2026, a motion to approve the use permit failed 3 to 4 at the Casa Grande Planning and Zoning Commission, and the City Council approved the permit on appeal 7 to 0 on February 2, 2026, as Resolution No. 5884.
The state's announcement gives about 80 jobs for Phase 1 and 200 full-time positions at full build-out. KPPC's appeal letter to the City Council gives 61 full-time positions for Phase 1, up to 80 jobs at Phase 1 full production, and additional jobs for Phase 2, according to the council minutes.
Both belong to the Kanto Group. Chemtrade announced KPCT Advanced Chemicals LLC in 2022 as a joint venture owned 51% by the Kanto Group and 49% by Chemtrade, to build a sulfuric acid plant in Casa Grande, and Jerry Lu, chief executive of KPPC Advanced Chemicals, commented on it. Chemtrade and its partner put the project on hold in June 2023 after costs rose, and Chemtrade's 2025 annual information form names KPPC as the 51% owner and says the project is still on hold. KPPC's 2026 permit reserves space on its Casa Grande site for a sulfuric acid facility within five to seven years.