Linde (Praxair) in Arizona

By Arizona AI · Profile reviewed · 53 sourced facts

At a glance

Linde plc, the industrial gas company formed by the merger of Praxair and Linde AG, runs an on-site gas complex on the TSMC Arizona campus in north Phoenix. A 2024 federal draft environmental assessment says the Linde plant will supply bulk nitrogen, oxygen and argon to TSMC Phases 1 through 3. Linde announced approximately $600 million for the complex in 2021, and $1 billion in July 2026 for two more air separation units. Linde also runs a specialty gas plant in Kingman and a regional sales office in Tempe.

Key facts

Arizona locations (18)
Headquarters
Woking, United Kingdom, and Danbury, Connecticut
Ownership
Public company
Nasdaq: LIN
Website
linde.com

Sources: Google Maps: Google Maps business listing: Linde Inc., Tempe, Google Maps: Linde Electronics, Google Maps business listing, Google Maps: Linde Inc., Google Maps business listing, Google Maps: Praxair Inc, Google Maps business listing, Linde plc (SEC filing) · Addresses open Google Maps in a new tab

Jobs listed on Arizona AI

37 open Arizona positions See Linde (Praxair) jobs

From Linde (Praxair)’s own careers site, refreshed twice a day.

Linde (Praxair) in Arizona: Key Developments

How does Linde (Praxair) fit into AI?

Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where Linde (Praxair) sits on it. Stages not marked below are shown for context and are not claims about Linde (Praxair).

  1. Chip design: Companies like Nvidia, Apple and AMD design the chips. Chip designers decide what a chip does and hand the blueprint to a factory. The three companies whose designs matter most to AI - Nvidia, Apple and AMD - do that work elsewhere, then send the designs to fabs. None of them owns a fab of its own.
  2. Wafer fabrication (here today): Fabs print billions of transistors onto silicon wafers. Bulk gases piped to the TSMC Arizona fabs from next door. A fab prints a design onto a polished disc of silicon called a wafer, layer by layer, until billions of transistors exist where there was blank material. It is the hardest and most expensive step in the chain, and the reason a single factory can cost tens of billions of dollars.
  3. Advanced packaging: Wafers are cut and assembled into finished chips. Packaging cuts a finished wafer into individual chips and assembles them, often stacking several pieces of silicon and memory into one component. For AI chips this step is nearly as demanding as fabrication, and a wafer is not a usable product until it is done.
  4. Servers and devices: Chips are built into AI servers, phones and PCs. Finished chips are assembled into the things people actually buy and deploy: data-center servers, phones, laptops. This is where a chip stops being a component and starts being a product.
  5. AI in use: Data centers and devices run AI models on that silicon. The end of the chain: models answering questions, generating images and driving software, running on the silicon every earlier step produced. Every AI service anyone uses is running on physical hardware somewhere, and that hardware started as a wafer.

Linde (Praxair): Wafer fabrication (here today)

  • Two more units for two new fabs (announced): In July 2026 Linde said it would add two air separation units to the three at its Phoenix complex to supply two new chip fabs for the same customer. Source: Linde plc (via Business Wire)
  • One of its largest electronics investments (company-reported): Linde says the expansion makes the Phoenix site one of its largest investments for an electronics customer anywhere in the world. Source: Linde plc (via Business Wire)
  • Linde links its demand to AI (company-reported): Linde's 2025 annual report says demand from chipmakers and from the expansion of AI-related digital infrastructure remains strong. Source: Linde plc (copy filed in the German Bundestag lobby register)

About Linde (Praxair)

What Linde does

Linde plc, formed through the merger of Praxair and Linde AG, describes itself as the largest industrial gas company worldwide. It has head offices in Woking, England, and Danbury, Connecticut, and trades on the Nasdaq.

Linde reported $34.0 billion in sales for 2025 and 65,177 employees worldwide at year end. Electronics customers made up about 9% of its 2025 sales outside its engineering business, according to its annual report.

How it supplies a chip fab: for its largest customers Linde builds plants on or next to the customer's site and pipes the gas in, under contracts that typically run 10 to 20 years. Its U.S. semiconductor page lists ultra-high-purity nitrogen, oxygen, argon, hydrogen, helium and carbon dioxide among the gases it sells to fabs.

In Arizona

Tempe regional office: Linde's own U.S. contact page lists its Arizona regional sales office at 1620 W. Fountainhead Pkwy. in Tempe. The office is in Suite 119.

Linde Electronics, Phoenix: Google Maps lists Linde Electronics at 1122 N. 52nd St. in Phoenix, with photos of the site. City of Phoenix fire permits there, issued in 2021 to Linde Gas & Equipment and in November 2024 for the occupancy "Linde Gas & Equipment", cover storing and handling compressed gases, cryogenic fluids, flammable liquids and other hazardous materials.

The gas complex on the TSMC campus: on September 8, 2021, Linde announced a long-term agreement to supply a new multi-billion dollar chip plant in Phoenix, with a total investment of approximately $600 million. Linde said it would build, own and operate on-site plants making ultra-high-purity nitrogen, oxygen and argon, with the first ones due in the second half of 2022.

Who the customer is: Linde's releases call it only "one of the world's largest semiconductor manufacturers." The U.S. Commerce Department's 2024 draft environmental assessment of TSMC Arizona names it: the Linde plant "will provide bulk quantities of nitrogen, oxygen, and argon to TSMC Phases 1 through 3" and the same gases to the general market. On Linde's February 2026 earnings call, chief executive Sanjiv Lamba, asked when Linde's unit would start up at TSMC's Arizona Fab 2, said "our plants for Fab 1 and 2 are in operation already."

The $1 billion expansion: on July 31, 2026, Linde said it had been awarded a new long-term agreement and would invest $1 billion to add two air separation units to the three already at the site, supplying two new chip fabs. Arizona AI does not add the two announcements together.

Where the plant is: the federal assessment places it on the westernmost part of the TSMC campus, across W. 51st Ave. from the production areas, on land Linde leases, and says Linde will sublease part of the parcel to Air Liquide to supply bulk hydrogen.

Street address: Google Maps lists Linde Inc. at 32400 N. 51st Ave., Phoenix, just west of 51st Avenue between Dove Valley Road and Loop 303. A second Linde listing about 280 meters away, "Linde Gas & Equipment TSMC Project," gives 5100 W. Carefree Hwy. as its address.

What the 2020 plans said: the Phoenix Business Journal, reading Linde's January 2020 city filings, reported plans for about 8,000 feet of pipelines, buildings under 20,000 square feet with towers of 120 and 165 feet, and 14 plant employees and 14 truck drivers. Linde told the city "We consume 25 times the amount of electricity of a normal industrial customer".

Public approvals on record:

  • October 6, 2021: the Phoenix City Council adopted an industrial gas pipeline license agreement with Linde.
  • May 20, 2022: Maricopa County issued the plant's air permit, according to the federal assessment.
  • January 25, 2023: city staff asked the council for two 15-year licenses for gas pipelines in 51st Avenue, from Dove Valley Road to Loop 303.

Kingman gas plant: Linde runs a specialty gas plant at 3426 Griffith Rd., Kingman, still listed on Google Maps under the Praxair name. Linde Gas & Equipment filed an EPA risk management plan for the site in July 2023. A privately published Mohave County highway guide described the plant in 2012, then as Praxair Electronics, as producing arsine and phosphine for semiconductor manufacturing.

Stores: Linde's store locator lists 14 Linde Welding Gas & Equipment Center stores in Arizona, in Phoenix, Mesa, Tucson, Flagstaff, Prescott, Kingman, Yuma, Casa Grande, Show Low, Lake Havasu City and Fort Mohave. They sell welding gases and equipment. They are listed under "Other Arizona locations" below.

Role in AI and chips

Fab utilities, not chips: Linde makes no chips. Its Phoenix plants make the nitrogen, oxygen and argon that wafer fabs use in large volumes and pipe them next door. The chips made in wafer fabs include those that AI systems run on.

Demand from AI: in its 2025 annual report Linde wrote that "demand from semiconductor manufacturers and the expansion of AI-related digital infrastructure remain strong." It calls the Phoenix site one of its largest investments for an electronics customer anywhere.

Controversies and Issues

September 2025 outage at TSMC Arizona (reported, not confirmed): TSMC confirmed that "a power outage at a TSMC supplier occurred" and did not confirm whether any losses occurred. Data Center Dynamics, relaying a report by journalist Tim Culpan, named the supplier as Linde and reported that TSMC scrapped thousands of wafers.

DIGITIMES later cited unnamed supply-chain sources who blamed "unstable gas purity from supplier Linde", a different cause. These are third-party reports that Linde and TSMC have not confirmed, and they are not independently verified. Status as of October 2026.

Linde (Praxair) in Arizona: By the Numbers

Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.

  • Expansion announced for the Phoenix gas complex (July 2026): $1 billion (announced)
  • Investment announced for the Phoenix complex (September 2021): Approximately $600 million (announced)
  • Air separation units at the Phoenix complex: 3 existing, 2 more announced (July 2026) (company-reported)
  • Customer named in a 2024 federal review: TSMC Arizona (Phases 1 through 3)
  • First Arizona supply agreement announced: September 8, 2021
  • Sales worldwide, 2025 (not an Arizona figure): $34.0 billion (worldwide) (company-reported)

The Arizona build-out, 2020 to 2026

  • 2020: Plans filed with the City of Phoenix
  • 2021: Phoenix council adopts a Linde gas pipeline license
  • 2021: First Arizona supply agreement announced
  • 2022: County air permit issued for the Linde plant
  • 2026: Linde announces a $1 billion Phoenix expansion

Linde (Praxair) Arizona regional sales office, Tempe

MeasureValueAs ofBasisSource
Address1620 W. Fountainhead Pkwy., Suite 119, Tempe, AZ 852822026-11-02company-reported From the company's own published information.Google Maps

Linde Electronics, Phoenix, Arizona

MeasureValueAs ofBasisSource
Address1122 N. 52nd St., Phoenix, AZ 850082026-10-28verifiedGoogle Maps
What the city permits coverStoring and handling compressed gases, cryogenic fluids, flammable liquids and other hazardous materials2024-11-18verifiedCity of Phoenix

Linde (Praxair) North Phoenix gas complex (TSMC Arizona campus)

MeasureValueAs ofBasisSource
Address32400 N. 51st Ave., Phoenix, AZ 850832026-10-28verifiedGoogle Maps
Where the plant sits (federal review)Westernmost part of the TSMC Arizona campus, across W. 51st Ave. from the production areas2024-05-29verifiedU.S. Department of Commerce, NIST CHIPS Program Office
Who owns the plant and the landOwned and operated by Linde on a leased land parcel2024-05-29verifiedU.S. Department of Commerce, NIST CHIPS Program Office
What happens hereOn-site plants that make ultra-high-purity nitrogen, oxygen and argon for the neighboring chip fabs, with the same gases also sold to the general market2021-09-08company-reported From the company's own published information.Linde plc
When the first plants were dueSecond half of 2022 (planned)2021-09-08announced From a public announcement. Plans can change.Linde plc
Plant staff planned in the 2020 city application14 plant employees and 14 truck drivers (2020 plan)2022-05-24projected A forward-looking estimate, not a measured result.Phoenix Business Journal (Arizona Technology Council copy)
Buildings and towers in the 2020 planUnder 20,000 sq ft of buildings, towers of 120 and 165 feet (2020 plan)2022-05-24announced From a public announcement. Plans can change.Phoenix Business Journal (Arizona Technology Council copy)
Supporting infrastructure in the 2020 planAbout 8,000 feet of gas pipelines and 11,500 feet of underground 230-kV transmission duct bank2022-05-24announced From a public announcement. Plans can change.Phoenix Business Journal (Arizona Technology Council copy)
Electricity use, as Linde described it to the cityAbout 25 times the electricity of a normal industrial customer2022-05-24company-reported From the company's own published information.Phoenix Business Journal (Arizona Technology Council copy)
Hydrogen supplier on Linde's parcelLinde will sublease part of its parcel to Air Liquide, which will supply bulk hydrogen (2024 review)2024-05-29verifiedU.S. Department of Commerce, NIST CHIPS Program Office
Gas pipelines requested in city streets (January 2023)51st Avenue, from Dove Valley Road to Loop 3032023-01-25verifiedCity of Phoenix, City Clerk

Linde (Praxair) Kingman gas plant, Arizona

MeasureValueAs ofBasisSource
Address3426 Griffith Rd., Kingman, AZ 864012026-10-28verifiedGoogle Maps
Specialty gases made here, as described in 2012Arsine and phosphine for semiconductor manufacturing; other gases for chipmakers are stored and mixed here2026-10-28verifiedHualapai West, Inc.

Linde (Praxair) Casa Grande welding supply store, Arizona

MeasureValueAs ofBasisSource
Address14990 W Jimmie Kerr Blvd, Casa Grande, AZ 851222026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Flagstaff welding supply store, Arizona

MeasureValueAs ofBasisSource
Address1000 E Butler Ave, Suite 109, Flagstaff, AZ 860012026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Fort Mohave welding supply store, Arizona

MeasureValueAs ofBasisSource
Address4648 S Highway 95, Fort Mohave, AZ 864262026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Kingman welding supply store, Arizona

MeasureValueAs ofBasisSource
Address2155 E Northern Ave, Kingman, AZ 864092026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Lake Havasu City welding supply store, Arizona

MeasureValueAs ofBasisSource
Address1081 N Lake Havasu Ave, Building 102, Lake Havasu City, AZ 864032026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Mesa welding supply store, Broadway Rd., Arizona

MeasureValueAs ofBasisSource
Address2534 W Broadway Rd, Suite 7, Mesa, AZ 852022026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Mesa welding supply store, Pecos Rd., Arizona

MeasureValueAs ofBasisSource
Address8607 E. Pecos Rd., Building 3, Mesa, AZ 852122026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Phoenix welding supply store, Lincoln St., Arizona

MeasureValueAs ofBasisSource
Address4030 W Lincoln St, Phoenix, AZ 850092026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Phoenix welding supply store, 19th Ave., Arizona

MeasureValueAs ofBasisSource
Address20801 N 19th Ave, Suite 12, Phoenix, AZ 850272026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Phoenix welding supply store, University Dr., Arizona

MeasureValueAs ofBasisSource
Address3822 E. University Dr, Phoenix, AZ 850342026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Prescott welding supply store, Arizona

MeasureValueAs ofBasisSource
Address548 Sixth St, Prescott, AZ 863012026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Show Low welding supply store, Arizona

MeasureValueAs ofBasisSource
Address1620 N 16th St, Show Low, AZ 859012026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Tucson welding supply store, Arizona

MeasureValueAs ofBasisSource
Address800 S Park Ave, Tucson, AZ 857192026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Linde (Praxair) Yuma welding supply store, Arizona

MeasureValueAs ofBasisSource
Address4251 E 30th Place, Yuma, AZ 853652026-10-27company-reported From the company's own published information.Linde Gas & Equipment Inc.

Facilities

MeasureValueAs ofBasisSource
Plans filed with the City of PhoenixJanuary 20202022-05-24verifiedPhoenix Business Journal (Arizona Technology Council copy)
Phoenix council adopts a Linde gas pipeline licenseOctober 6, 20212021-10-06verifiedCity of Phoenix, City Clerk
Utility work so TSMC and Linde could buildAPS relocated 500-kV, 230-kV and 69-kV transmission lines on the 1,100-acre TSMC property2022-04-12verifiedPhoenix Business Journal (Arizona Technology Council copy)
County air permit issued for the Linde plantMay 20, 2022 (Maricopa County permit P0008966)2022-05-20verifiedU.S. Department of Commerce, NIST CHIPS Program Office

Investment

MeasureValueAs ofBasisSource
Linde announces a $1 billion Phoenix expansionJuly 31, 20262026-07-31verifiedLinde plc (via Business Wire)

Workforce

MeasureValueAs ofBasisSource
Employees worldwide (not an Arizona figure)65,177 (end of 2025)2025-12-31company-reported From the company's own published information.Linde plc (SEC filing)

Production

MeasureValueAs ofBasisSource
How Linde describes its Phoenix customer"One of the world's largest semiconductor manufacturers"2026-07-31company-reported From the company's own published information.Linde plc (via Business Wire)
Gases Linde sells to chip fabs (U.S. product page)Ultra-high-purity nitrogen, oxygen, argon, hydrogen, helium and carbon dioxide2026-10-27company-reported From the company's own published information.Linde Inc.
Electronics share of Linde sales, 2025 (worldwide)9% of 2025 sales (worldwide, excluding Linde Engineering)2025-12-31company-reported From the company's own published information.Linde plc (copy filed in the German Bundestag lobby register)
How on-site supply contracts workPlants on or next to the customer's site, with contracts typically running 10 to 20 years2025-12-31company-reported From the company's own published information.Linde plc (SEC filing)

Other

MeasureValueAs ofBasisSource
Head offices and listingWoking, England, and Danbury, Connecticut; incorporated in Ireland; Nasdaq: LIN2025-12-31company-reported From the company's own published information.Linde plc (copy filed in the German Bundestag lobby register)
Chief executiveSanjiv Lamba (CEO since March 1, 2022, also chairman since January 31, 2026)2025-12-31company-reported From the company's own published information.Linde plc (copy filed in the German Bundestag lobby register)
Terms requested for the 2023 pipeline licensesTwo 15-year licenses, each with two 10-year renewal options, and a combined fee of up to $125,000 a year2023-01-25verifiedCity of Phoenix, City Clerk
September 2025 supplier outage at TSMC Arizona (press reports name Linde)TSMC confirmed a power outage at a supplier; press reports, not confirmed by Linde or TSMC, name Linde2025-11-26verifiedTom's Hardware (Anton Shilov)
Linde CEO on its TSMC Arizona plants (February 2026 earnings call)"Our plants for Fab 1 and 2 are in operation already."2026-02-05company-reported From the company's own published information.MarketBeat (earnings call transcript)

Sources

Linde (Praxair) Jobs in Arizona (37 open)

Arizona AI currently tracks 37 open Linde (Praxair) roles in Arizona, the largest named category being manufacturing & equipment technicians (8). Counts come from the Arizona AI job index, aggregated from the employer's own careers system and refreshed twice daily; they reflect published listings, not total employment.

Linde (Praxair) Manufacturing & Equipment Technicians Jobs in Arizona (8)

Linde (Praxair) Process & Equipment Engineering Jobs in Arizona (5)

Linde (Praxair) Business & Corporate Jobs in Arizona (4)

Linde (Praxair) Internships & Early Career Jobs in Arizona (3)

Linde (Praxair) Facilities, Construction & Utilities Jobs in Arizona (1)

Linde (Praxair) Hardware & Design Engineering Jobs in Arizona (1)

Linde (Praxair) Supply Chain & Procurement Jobs in Arizona (1)

Linde (Praxair) Other Roles Jobs in Arizona (14)

Linde (Praxair) in Arizona: Common Questions

How many jobs does Linde (Praxair) have open in Arizona right now?

Arizona AI is currently tracking 37 open Linde (Praxair) roles in Arizona, across Phoenix, Kingman, Flagstaff and 4 other locations. The count updates automatically as Linde (Praxair) adds and removes postings, and duplicate listings for the same role are merged.

What kinds of roles does Linde (Praxair) hire for in Arizona?

The largest categories among current listings at Linde (Praxair) in Arizona are manufacturing & equipment technicians (8), process & equipment engineering (5), business & corporate (4), internships & early career (3). Categories are derived from job titles by Arizona AI.

Where in Arizona are Linde (Praxair) jobs located?

Linde (Praxair) lists Arizona roles in Phoenix, Kingman, Flagstaff, Lake Havasu and 3 other locations. Locations are shown exactly as Linde (Praxair) publishes them. Employers sometimes label roles with the metropolitan area rather than the specific campus city.

How do I apply for a job at Linde (Praxair) in Arizona?

Each listing on this page links through to Linde (Praxair)'s own application page. Arizona AI does not collect applications or charge job seekers, and roles are aggregated from the employer's official careers system rather than from third-party recruiters.

Does Linde supply TSMC in Arizona?

Yes. The U.S. Commerce Department's 2024 draft environmental assessment of TSMC Arizona says the Linde plant on the west side of TSMC's north Phoenix campus "will provide bulk quantities of nitrogen, oxygen, and argon to TSMC Phases 1 through 3," and the same gases to the general market. Linde's own announcements describe the customer as "one of the world's largest semiconductor manufacturers."

How much is Linde investing in Arizona?

Linde announced two separate investments in its north Phoenix gas complex: approximately $600 million in September 2021 for the complex, and $1 billion in July 2026 for two more air separation units to supply two new chip fabs. They are separate announcements, so Arizona AI does not add them together.

Where is the Linde gas plant for TSMC in Phoenix?

The federal environmental assessment places it on the westernmost part of the TSMC Arizona campus, across W. 51st Ave. from the production areas, on land Linde leases. Google Maps lists Linde Inc. at 32400 N. 51st Ave., Phoenix, just west of 51st Avenue between Dove Valley Road and Loop 303. A second Linde listing about 280 meters away, "Linde Gas & Equipment TSMC Project," gives 5100 W. Carefree Hwy. as its address.

What gases does Linde make in Phoenix?

Ultra-high-purity nitrogen, oxygen and argon, made by air separation units that Linde builds, owns and operates on the TSMC Arizona campus. Linde says three units exist there and two more are planned. The 2024 federal assessment says Linde will sublease part of its parcel to Air Liquide, which will supply bulk hydrogen.

How many people does Linde employ in Arizona?

Linde's 2020 plans for the north Phoenix complex, as reported by the Phoenix Business Journal, called for 14 plant employees and 14 truck drivers. Worldwide, Linde had 65,177 employees at the end of 2025.

Did a Linde outage stop TSMC Arizona in 2025?

TSMC confirmed that "a power outage at a TSMC supplier occurred" in September 2025 but did not confirm whether any losses occurred. Press reports citing journalist Tim Culpan named the supplier as Linde and said TSMC scrapped thousands of wafers. Neither Linde nor TSMC has confirmed those details.