Proposed data center in 2802 W Palm Ln, Phoenix. Operated by 5C Data Centers.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Capacity: Figure reported in the press: computing (IT) load. Reported September 2024.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: A listing site shows it under construction, but the city called it proposed in June 2026.
At the City’s request, 5C has submitted detailed information and committed to measures designed to mitigate the potential impacts of its proposed data center.
Capacity: 20 MW
Note: The source gives this as the planned figure in September 2024.
That building will comprise 140,000 square feet (13,000 sqm) and 20MW of IT capacity.
Floor area: 140,000 sq ft
Note: The source gives this as the planned size in September 2024.
That building will comprise 140,000 square feet (13,000 sqm) and 20MW of IT capacity.
Location: 2802 W Palm Ln, Phoenix
Parcel Address: 2802 W. Palm Lane Owner: 5C Data Centers (5C)
2802 W Palm Lane Under Construction New facility under construction
A proposed data center at 2802 W. Palm Lane, Phoenix.
At the City’s request, 5C has submitted detailed information and committed to measures designed to mitigate the potential impacts of its proposed data center.
Parcel Address: 2802 W. Palm Lane Owner: 5C Data Centers (5C)
Data Center Dynamics reported in September 2024 that 5C planned 20 MW of IT capacity in about 140,000 sq ft, scheduled to go live in 2025.
That building will comprise 140,000 square feet (13,000 sqm) and 20MW of IT capacity.
The first facility at the site, PHX01, is scheduled to go live in 2025.
Phoenix City Council adopted a binding waiver of enforcement for 5C in July 2026.
City Council Formal Meeting 2026-07-01T10:00:00 363 adopted A motion was made by Councilwoman Pastor, seconded by Councilwoman O'Brien, that this item be adopted as revised
Parcel Address: 2802 W. Palm Lane Owner: 5C Data Centers (5C)
A listing site shows it under construction.
2802 W Palm Lane Under Construction New facility under construction