Apple Mesa Global Data Command Center is an operating Apple data center at 3740 S Signal Butte Rd in Mesa, in a 1.3 million square foot former manufacturing plant. Apple says it began serving customers in March 2017, and its 2026 report lists Mesa among the data centers it owns and operates.
Operating data center in 3740 S Signal Butte Rd, Mesa. Operated by Apple.

Outlined in yellow: the parcel at 3740 S Signal Butte Rd, Mesa, where Apple's data center stands. It shows the land, not where buildings would go. Parcels: Maricopa County Assessor, Parcel 314-10-776A. Shapes: Maricopa County Assessor (read November 7, 2026).
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. By November 2026 Cleanview no longer showed building figures publicly, and no operator source found gives one for this building. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
centers that we own and operate: Prineville, Oregon; Reno, [...] Nevada; Maiden, North Carolina; Mesa, Arizona; Waukee
Map record 1946: Apple Mesa Global Data Command Center | status Operating | capacityMw 50
Capacity: 50 MW
Note: A listing site gave 50 MW without saying what it measures. Apple's 2026 report gives energy used, not capacity: 563 million kWh in fiscal 2025 averages about 64 MW. The county's 266 MW equals the combined rating of the 69 backup engines a 2021 county document lists (356,969 bhp).
Map record 1946: Apple Mesa Global Data Command Center | status Operating | capacityMw 50
Floor area: 1.3M sq ft
Note: This is the size of the former manufacturing plant, as reported in 2015.
Apple will spend $2 billion to convert a former 1.3 million square foot manufacturing plant in Mesa, Arizona, into a data center.
"description":"MODIFYING EXISTING ELECTRICAL SYSTEMS IN ADDITION TO INSTALLING NEW ELECTRICAL SYSTEMS TO CONVERT EXISTING FACILITY TO A DATA CENTER FACILITY. OCCUPANCY CLASSIFICATION B, 1.3 MILLION SQ FT
Land: 83 acres
Note: The Federal Register gave 83.17 acres for the proposed foreign-trade subzone at this address in 2014.
The facility sits on 83 acres of land.
The proposed subzone (83.17 acres) is located at 3740 S. Signal Butte Rd, Mesa, Arizona.
Online since: 2017
Note: Apple says it began serving customers in March 2017 and also says it came online in 2016.
converted it to a data center that began servicing customers in March 2017.
Our global command data center in Mesa, Arizona, came online in 2016.
Location: 3740 S Signal Butte Rd, Mesa
3740 S SIGNAL BUTTE RD MESA 85212
"property_address":"3740 S SIGNAL BUTTE RD" [...] "description":"Construct industrial-grade soft water system canopy, water treatment system, on-site access road and metal shade canopy.
Apple lists Mesa among the data centers it owns and operates (2026).
centers that we own and operate: Prineville, Oregon; Reno, [...] Nevada; Maiden, North Carolina; Mesa, Arizona; Waukee
It has served customers since March 2017 in a former manufacturing plant of about 1.3 million sq ft.
converted it to a data center that began servicing customers in March 2017.
Apple will spend $2 billion to convert a former 1.3 million square foot manufacturing plant in Mesa, Arizona, into a data center.
The Arizona Republic reported in January 2017 that First Solar built the plant but never fully occupied it, and that GT Advanced Technologies, a sapphire-glass supplier to Apple, then filed for bankruptcy and vacated the building.
Apple Inc. plans to assemble servers in the tech company’s large Mesa data center [...] Tempe-based First Solar Inc. built the plant and planned to employ about 600 workers there but never fully occupied it. Next came GT Advanced Technologies Inc., a sapphire-glass supplier to Apple. That company filed for bankruptcy and vacated the building.
Arizona Governor Doug Ducey announced in February 2015 that the facility was expected to employ 150 full-time Apple employees, with 300 to 500 construction and trade jobs.
Governor Doug Ducey announced that Apple will be expanding in Arizona, with a $2 billion investment in Mesa on a command center for the company's global networks [...] The facility is expected to employ 150 full-time Apple employees, with 300-500 construction and trade jobs.
Apple said in 2015 that, like all its data centers, it would be powered by 100 percent renewable energy.
"Like all Apple data centers, it will be powered by 100 percent renewable energy, much of which will come from a new local solar farm," Apple said in a statement on the project.
Apple said in January 2017 that production at the site would be limited to assembling servers into racks.
At this stage the Mesa global data command hub is not yet operational. Once it is up and running, Apple says production at the site will be limited to assembling servers into racks.
City of Mesa permits issued in April 2024 and February 2025 cover chilled water and condenser water plant upgrades and a soft water system with water treatment.
"issued_date":"2024-04-01T00:00:00.000" [...] "description":"Chilled Water and Condenser Water Plant Upgrades including the following: 1. Addition of VFD's to CW pumps 2. Addition of Filter and Pump to CHW loop.
"issued_date":"2025-02-10T00:00:00.000" [...] "description":"Construct industrial-grade soft water system canopy, water treatment system, on-site access road and metal shade canopy.
9to5Mac and MacTrast reported in August 2018 that Apple opened the plant as a data center in 2016.
local publication, The Arizona Republic got the rare access to take a look around. After GT Advanced moved out, Apple opened up the plant as a data center with 150 employees in 2016.
The data center has been operating since 2016.
Apple's 2026 Environmental Progress Report lists 563 million kWh of electricity used at the Mesa data center in fiscal year 2025, an average of about 64 MW around the clock when spread evenly over the year.
Fiscal year 2025 energy and carbon footprint (corporate facilities) [...] Electricity (million kWh) [...] Mesa, AZ 0 0 440 563 563 180,733
The same report describes the Bonnybrooke solar project, which Apple built with Salt River Project to support this data center, as 50 megawatts.
To support this facility, we partnered with the local utility, Salt River Project (SRP), to build the 50-megawatt Bonnybrooke solar project, which became operational in December 2016.
Maricopa County's air quality records describe the site as a data center with 266 MW of generating capacity. A December 2021 county technical support document lists 69 emergency engines and 1 fire pump at full build-out; the rated horsepower of the 69 engines adds up to 356,969 brake horsepower, about 266 MW when converted.
Data Centers (>100 MW) [...] 266 MW generating capacity data center.
the total number of emergency engines that will be in operation at full build-out is being reduced to 69 and 1 fire pump. [...] Rated BHP 1 8 CAT 3516C 3,604 2 2 CAT 3512C 2,206 3 1 CAT C15 762 4 1 CAT C27 1,141 5 12 CAT C175-20 5,646 6 25 CAT C175-20 5,646 7 20 CAT C175-20 (or similar) 5,646
A report filed with the county for the site says that in the second half of 2022, 49 generators were operational and 10 more were operating for commissioning.
During the Reporting Period, all 49 generators from Group 1 through Group 6 and the Fire Pump were operational at the Facility. Of the 20 permitted Group 7 generators, 10 operated for commissioning during the Reporting Period
City of Mesa permits name Mortenson Construction on the 2016 conversion of the existing facility into a data center, including data halls A and B, and Holder Construction on 2017 site and administration work, on a 2021 data center expansion of 154,596 sq ft, and on a 2022 expansion.
"description":"MODIFYING EXISTING ELECTRICAL SYSTEMS IN ADDITION TO INSTALLING NEW ELECTRICAL SYSTEMS TO CONVERT EXISTING FACILITY TO A DATA CENTER FACILITY. [...] "contractor_name":"MORTENSON CONSTRUCTION"
"issued_date":"2016-03-01T00:00:00.000" [...] "description":"BUILDING ARCHITECTURAL AND ROOFING PLANS. DATA HALL A & B. [...] "contractor_name":"MORTENSON CONSTRUCTION"
"issued_date":"2017-02-07T00:00:00.000" [...] "description":"EXPEDITE: EPLAN PHASE 2 - TI FOR ADMIN AREA, SITE IMPROVEMENTS, 219 SF GUARDSHACK, RESTROOM CHANGES, (2) 1084SF GENERATOR SWITCHGEAR BUILDINGS [...] "contractor_name":"HOLDER CONSTRUCTION GROUP LLC"
"issued_date":"2021-07-01T00:00:00.000" [...] "description":"Tenant Improvement - Data center expansion to include fit-out of existing space and installation of electrical equipment [...] "contractor_name":"HOLDER CONSTRUCTION GROUP LLC" [...] "total_sq_ft":"154596"
"issued_date":"2022-10-15T00:00:00.000" [...] "description":"Tenant Improvement - Data center expansion to the current permit PMT21-09173. [...] "contractor_name":"HOLDER CONSTRUCTION GROUP LLC"
The Maricopa County Assessor lists Platypus Development LLC as the owner of the parcel at 3740 S Signal Butte Rd.
This is a Commercial parcel located at 3740 S SIGNAL BUTTE RD MESA, AZ 85212. The current owner is PLATYPUS DEVELOPMENT LLC.
Maricopa County's air quality records for the data center list the facility as Platypus Development and the company as Platypus Development LLC, with a company address of 1 Infinite Loop in Cupertino, California.
"facility_nm":"Platypus Development" [...] "name":"Platypus Development LLC" [...] "CompanyAddress1":"1 Infinite Loop" [...] "CompanyCity":"Cupertino","CompanyState":"CA"
The emissions report for the second half of 2022, submitted to the county in the name of Platypus Development LLC, is signed by an Apple Inc. environmental program manager.
Platypus Development LLC (“Platypus”, “Facility”) is submitting the attached Bi-Annual Emissions Report (Report) to the Maricopa County Air Quality Department [...] Sincerely, [...] Environmental Program Manager – Global Data Centers Apple Inc.