A listing site shows a Charles Schwab data center in Phoenix as operational, and county records list a Charles Schwab data processing center at 4701 E Francisco Dr in Phoenix. Schwab's annual report for 2025 says the company abandoned certain data centers in 2024, without naming them.
We found no recent public information about this project. The latest we found is from February 10, 2025. A City of Phoenix fire permit at 4701 E Francisco Dr, issued February 10, 2025, covered changes to 12 sprinkler heads in the CRAH 1A area. It may have been abandoned or put on hold. Its figures are not counted in the statewide totals.

Outlined in yellow: Parcel 301-14-989, named for Charles Schwab Data Center in county Air Quality record F001535. It shows the land, not where buildings would go. Parcels: Maricopa County Air Quality Department, Facility record F001535, Charles Schwab Data Center, parcel 301-14-989. Shapes: Maricopa County Assessor (read November 8, 2026).
Compiled from public records and checked on 2026-11-13. Confidence in this record: low. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: No recent information
Note: Only a listing site shows a Schwab data center in Phoenix as operational.
lower depreciation on equipment due to abandonment of certain data centers in 2024 related to the integration of Ameritrade
Charles Schwab is a operational data center with 5 MW of power capacity developed by Charles Schwab & Co Inc in Phoenix, AZ.
Location: 4701 E Francisco Dr, Phoenix
Note: The address comes from county and city records, not from a Schwab statement.
Charles Schwab & Co. Inc. 4701 E. Francisco Dr. Phoenix, AZ 85044
A City of Phoenix fire permit at 4701 E Francisco Dr, issued February 10, 2025, covered changes to 12 sprinkler heads in the CRAH 1A area.
Permit # F809 25002135 Issued 10-FEB-2025 Expires 10-FEB-2027 [...] Address 4701 E FRANCISCO DR PHOENIX AZ 85044-5365 [...] DESCRIPTION OF WORK: ADDING/MODIFYING (12) SPRINKLER HEADS IN THE CRAH 1A AREA
The Maricopa County Assessor lists Charles Schwab Global Holdings as owner of 4701 E Francisco Dr, and a City of Phoenix fire permit issued in February 2025 for that address covers adding or modifying 12 sprinkler heads in the CRAH 1A area.
CHARLES SCHWAB GLOBAL HOLDINGS INC | 4701 E FRANCISCO DR PHOENIX 85044
Address 4701 E FRANCISCO DR PHOENIX AZ 85044-5365 [...] ADDING/MODIFYING (12) SPRINKLER HEADS IN THE CRAH 1A AREA
Maricopa County's signed air quality permit dated May 3, 2021 is issued to Charles Schwab & Co. Inc., 4701 E. Francisco Dr., Phoenix, AZ 85044.
Charles Schwab & Co. Inc. 4701 E. Francisco Dr. Phoenix, AZ 85044
This facility is a data processing center with a total of 8 diesel powered emergency engines.
The county's technical support document for the same facility, dated April 8, 2021, says 'This facility is a data processing center with a total of 8 diesel powered emergency engines.' It also says the primary function of an emergency engine is to provide back-up power.
Charles Schwab & Co. Inc. 4701 E. Francisco Dr. Phoenix, AZ 85044
This facility is a data processing center with a total of 8 diesel powered emergency engines. The primary function of an emergency engine is to provide back-up power when electric power from the local utility is interrupted.
This facility is a data processing center with a total of 8 diesel powered emergency engines.
City of Phoenix permit records for 4701 E Francisco Dr also include work titled CHARLES SCHWAB RM 1A MECH UPGRADE and SCHWAB SITE ELECTRICAL.
CHARLES SCHWAB RM 1A MECH UPGRADE
SCHWAB SITE ELECTRICAL
The listing site datacenter.fyi shows a Charles Schwab data center in Phoenix as operational, with no address or date.
Charles Schwab is a operational data center with 5 MW of power capacity developed by Charles Schwab & Co Inc in Phoenix, AZ.
Schwab's annual report for 2025 says it abandoned certain data centers in 2024 without naming them.
lower depreciation on equipment due to abandonment of certain data centers in 2024 related to the integration of Ameritrade
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
The sources cited include no Schwab statement naming the data center's address.