Cloudnium Phoenix Data Center (Tempe)

Cloudnium offers colocation at 1005 W Geneva Drive in Tempe, marketed as its Phoenix data center. On August 6, 2026, it announced that it was taking over an existing data center at this address.

Operating data center in 1005 W Geneva Dr, Tempe. Operated by Cloudnium.

The short version

Building and property history

Maricopa County assessor records list 1980 as the building's construction year. A special warranty deed recorded on October 15, 2012 documents Nestle USA's conveyance of the property to Omnis International LLC. The accompanying affidavit of property value states a $1.25 million sale price. The county's parcel record, read on November 8, 2026, lists Omnis International LLC as the property owner.

Omnis, ColoBarn and the transition

On August 22, 2025, ColoBarn announced that it had acquired Omnis Network's colocation customer base and would relocate those customers to its own Tempe facility. In September 2025, Data Center Dynamics reported that the Geneva Drive building was for sale and housed Omnis's data center.

Why Cloudnium chose Tempe

Cloudnium says the location gives it a western U.S. presence for customers seeking geographic diversity, disaster recovery and deployments across multiple locations. Its August 2026 announcement emphasized the existing infrastructure and described plans to invest in reliability, redundancy, capacity, connectivity and operational efficiency as demand grows.

Where it is

2023 aerial photo of the area around Cloudnium's published Phoenix facility address at 1005 W Geneva Drive, Tempe. No property boundaries are drawn.
Aerial photo flown September 15, 2023: USDA National Agriculture Imagery Program (NAIP); source: USGS, USDA, The National Map: Orthoimagery (public domain).

Pin at Cloudnium's published Phoenix facility address in Tempe. This address pin does not mark a building entrance or a property boundary. Address: Cloudnium, Phoenix Data Center, Tempe address. Pin: Google Maps, Cloudnium, 1005 W Geneva Drive, Tempe (read November 8, 2026).

Open in Google Maps

  • Capacity: 0.63 MW
  • Floor area: 15,070 sq ft

Capacity: Operator's own figure. Cloudnium: approximately 625 kW of critical power. The source does not say what the figure measures.

Timeline

  1. : A City of Tempe building permit, BP001525, at 1005 W Geneva Dr names the "Nestle Tempe Data Ctr". Source: City of Tempe, Building permit BP001525, 1005 W Geneva Dr
  2. : A deed records Nestle USA's conveyance of the property to Omnis International LLC. Source: Maricopa County Recorder, Special warranty deed 20120932565 and affidavit of property value
  3. : A City of Tempe permit revision, RA130047, at 1005 W Geneva Dr names "Omnis Data Center". Source: City of Tempe, Permit revision RA130047, 1005 W Geneva Dr
  4. : ColoBarn announces its acquisition of Omnis Network's colocation customer base. Source: ColoBarn, ColoBarn Colocation Services Acquires Omnis Clients & Moves Them to Tempe Facility
  5. : Data Center Dynamics reports the building is for sale, and the listing says it was built in 1980 and offers office, data center and manufacturing space. Source: Data Center Dynamics, Data center for sale in Tempe, Arizona
  6. : Cloudnium announces its takeover of the existing Tempe data center. Source: Cloudnium, Cloudnium Expands with New Data Center in Tempe, Arizona

Working here

Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.

How we know this

Compiled from public records and checked on 2026-11-08. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.

Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.