Operating data center in Tempe. Operated by EdgeConneX.
Capacity: Operator's own figure. EdgeConneX data sheet. The source does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: The newest source is the operator's September 2024 data sheet.
PHX01: 4.5 MW N+1, scalable to 6.5 MW
PHX01: 79,200 sq ft facility
Capacity: 4.50 MW
Note: From the operator's September 2024 data sheet.
PHX01: 4.5 MW N+1, scalable to 6.5 MW
Floor area: 79,200 sq ft
PHX01: 79,200 sq ft facility
Online since: 2014
Note: A 2023 Data Center Dynamics report says launched in 2014 without clearly saying it means this building.
Launched in 2014, the company announced it was expanding PHX01’s capacity from 4MW to 7MW in December 2021
Location: Tempe
3011 S. 52nd St, Ste 107 Tempe, AZ 85282
A September 2023 Data Center Dynamics report gives a 2014 launch in a sentence about expanding PHX01. EdgeConneX lists PHX01 on its September 2024 Phoenix data sheet.
PHX01: 79,200 sq ft facility
Launched in 2014, the company announced it was expanding PHX01’s capacity from 4MW to 7MW in December 2021