All Arizona data centers
Operating
Edged Phoenix
Operated by Edged · Mesa
- Capacity
- 36 MW
- Floor area
- 210,000 sq ft
- Land
- 12 acres
- Online since
- 2025
Working here
We do not publish per-facility headcount, because no reliable public figures exist for these sites and construction announcements are not permanent employment. What we can show is real: open Arizona roles at this operator, gathered from their own job board.
More Arizona data centers
OperatingEdgeCore Mesa: PH03Mesa450 MW · 3.1M sq ftProposedNovva Mesa ArizonaMesa300 MW · 1.3M sq ftOperatingMesa - Building 1Mesa138 MW · 313,739 sq ftProposedMesa - Building 2Mesa138 MWProposedMesa - Building 3Mesa138 MWProposedAWS Elliot Road - Building 1Mesa96 MW · 227,000 sq ft
See all Arizona data centersSources and confidence
Compiled from public records and checked on 2026-08-06. Our confidence in this record is high. Blank figures above mean the number is not publicly established, not that it is zero.
Checked against cleanview.co. We name our sources rather than linking to them; the full references are held with the record. If a figure here disagrees with one of them, tell us and we will recheck it.
Operator site: https://www.edged.us/
Something here wrong or out of date? Tell us.