Proposed data center in 3221 E Elwood St, Phoenix. Operated by PhoenixNAP.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Capacity: Figure reported in the press: computing (IT) load. Reported March 2026.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: A March 2026 report says some work on the project started in 2025.
announced plans for a second data center, adjacent to its existing facility, back in 2021 , with some work starting on the project last year.
The first phase of the new building could come online in the first half of 2028.
A second facility, DC2, is planned to support up to 18 MW of additional critical capacity
Capacity: 18 MW
begin development of a second, 18MW, facility known as DC2.
A second facility, DC2, is planned to support up to 18 MW of additional critical capacity
Floor area: 530,000 sq ft
Note: The source gives this as the planned size in April 2025.
will begin construction in four months on a 530,000-square-foot data center and will bear the name PHX02
Expected: 2028
Note: The sources give the first half of 2028 for the first phase.
The first phase of the new building could come online in the first half of 2028.
with initial phases expected to come online in the first half of 2028.
Location: 3221 E Elwood St, Phoenix
The new data center is located in south Phoenix at 3221 E Elwood St.
A planned second building of about 530,000 sq ft at 3221 E Elwood Street, Phoenix, next to the existing PhoenixNAP facility.
will begin construction in four months on a 530,000-square-foot data center and will bear the name PHX02
The new data center is located in south Phoenix at 3221 E Elwood St.
announced plans for a second data center, adjacent to its existing facility, back in 2021 , with some work starting on the project last year.
Announced in 2021 with some work started in 2025, the first phase was expected in the first half of 2028 as of March 2026.
announced plans for a second data center, adjacent to its existing facility, back in 2021 , with some work starting on the project last year.
The first phase of the new building could come online in the first half of 2028.
with initial phases expected to come online in the first half of 2028.
In March 2026, Blue Owl and RadiusDC were reported to be acquiring PhoenixNAP's Phoenix data center and colocation business, with RadiusDC aiming to begin developing the second building at closing.
advising Blue Owl and RadiusDC on the acquisition of phoenixNAP’s Phoenix data center and colocation business.
At closing, RadiusDC aims to expand the existing building to 8MW and begin development of a second, 18MW, facility known as DC2.