Operating data center in 3701 E Columbia St, Tucson. Operated by TECfusions.
Capacity: Operator's own figure. 16 MW live and fully leased, per TECfusions in July 2026. A further 12 MW is contracted, not yet live, and not counted. The source does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-23. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
16 MW live and fully leased, with an additional 12 MW contracted, in Tucson, Arizona
Fully-Leased Single-Tenant Site Delivered at Speed
C of O Issued
Capacity: 16 MW
16 MW live and fully leased, with an additional 12 MW contracted, in Tucson, Arizona
Floor area: 133,450 sq ft
The 133,450-square-foot Tucson Tech Data Center building offers 40,790 square feet of raised floor and 6.56MW of capacity.
Location: 3701 E Columbia St, Tucson
Carter Funds has acquired a fully leased data center at 3701 E Columbia Street in Tucson for $13 million.
TECfusions said in July 2026 that it has 16 MW live and fully leased in Tucson, with a further 12 MW contracted, in an announcement filed with the U.S. Securities and Exchange Commission.
16 MW live and fully leased, with an additional 12 MW contracted, in Tucson, Arizona
TECfusions' own page for the site describes it as fully leased to a single tenant, with 15 MW of IT capacity.
Fully-Leased Single-Tenant Site Delivered at Speed
15 MW IT capacity delivered within 4 months
Pima County building permits for TECfusions' data center work in the building, in phases, show the first three phases at certificate of occupancy status in 2026 and a fourth phase, issued in 2026, still under way.
T.I. for TECfusions Data Center, Phase 1 (25,825 S.F.)
C of O Issued
T.I. for TECfusions Data Center, Phase 2 (71,127 S.F.)
C of O Issued
Vanilla Shell Improvement for TECfusions Data Center, Phase 3 (14,478 S.F.)
C of O Issued
T.I. for TECfusions Data Center, Ph. 4, (17,388 S.F.)
An investor presentation filed with the same announcement names a large AMD-based AI deployment in Tucson as one of TECfusions' reference deployments.
TECfusions hosts a large tenant-owned GPU cluster (Clarksville, VA) and a large AMD-based AI deployment (Tucson, AZ)
Carter Funds bought the building in 2023, when it was fully leased to TECfusions on a 15-year lease.
Carter Funds has acquired a fully leased data center at 3701 E Columbia Street in Tucson for $13 million.
The data center is 100 percent leased to TECfusions
on a 15-year absolute triple net lease
The building dates from 1989 and was a Symantec, later NortonLifeLock, data center, which stood vacant and for sale in November 2021.
The building was originally built in 1989.
Built around 1989, the site was previously a Symantec facility
The property is vacant and available immediately.
A 2007 Pima County permit for a remodel and addition at the address, which added a generator room and a computer data room, gives a total of 296,826 sq ft.
REMODEL: INTERIOR & ADD: GENERATOR ROOM & COMPUTER DATA ROOM
Total Sq. Ft: 296826
The site has a Tucson mailing address but lies outside the city, in unincorporated Pima County.
Jurisdiction Pima County
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Arizona AI shows the 16 MW figure from TECfusions' July 2026 filing, its most recent dated statement. Arizona AI shows the 133,450 sq ft reported at the 2023 sale and has not established why the 2007 county permit gives a larger total.