The live tracker for Arizona's AI economy

Tract Buckeye

Proposed data center in Between Yuma Road and Southern Avenue, Buckeye. Being developed by Tract.

This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.

  • Utility power supply at full build-out: 1.8 GW
  • Floor area: 20.0M sq ft
  • Land: 2069 acres

Capacity: Figure reported in the press: power the utility has agreed to supply, at full build-out. Power infrastructure that could support up to 1.8 GW, reported August 2024.

Working here

Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Tract is developing this site rather than operating it, so any long-term operator has not been established here.

How we know this

Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.

Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.