Operating data center in 1655 W Sunrise Blvd, Gilbert. Operated by US Signal.
Capacity: Operator's own figure: computing (IT) load. US Signal: 500 kW critical IT workload.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-23. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
AZ01 Phoenix Data Center 1655 W Sunrise Blvd. Gilbert, AZ 85233
500kW Critical IT Workload
Capacity: 0.50 MW
500kW Critical IT Workload
Floor area: 14,000 sq ft
14,000 Total Sq. Ft.
Location: 1655 W Sunrise Blvd, Gilbert
AZ01 Phoenix Data Center 1655 W Sunrise Blvd. Gilbert, AZ 85233
US Signal's page for its AZ01 data center gives 500 kW of critical IT workload, 14,000 sq ft in all and 6,000 sq ft of white space.
500kW Critical IT Workload
14,000 Total Sq. Ft.
6,000 Whitespace Sq. Ft.
It describes a Tier 2 facility with 1,000 kW of backup generators, 500 kW of UPS and 1,500 kVA of utility service.
Resiliency: Tier 2
Generators: 1,000 kW, 2N redundancy
UPS: 500kw, 2N redundancy
Utility Feeds: 1,500 kVA
US Signal gives 1998 as the year the building was built.
Year Built: 1998
US Signal acquired OneNeck IT Solutions in September 2024.
In September 2024, US Signal acquired OneNeck IT Solutions
Town of Gilbert records name the site the OneNeck Data Center in a 2011 permit, and a permit issued in 2023 covers installing new fiber to serve OneNeck IT Solutions at 1655 W Sunrise Blvd.
ONENECK DATA CENTER EXCAVATE FOR NEW ELECTRIC TO BUILDING
Installing 4,040' of new underground fiber (144CT) to serve OneNeck IT Solutions at 1655 W Sunrise Blvd