American Express is building a new data center in north Phoenix. A City of Phoenix building permit issued on June 13, 2025 covers a 240,000-square-foot data center at 19400 N. 56th Street in Desert Ridge, on the same street as the company's office campus, at a stated value of $260 million.
Proposed data center in 19400 N 56th St, Phoenix. Operated by American Express.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
City records call the project American Express - Project Odyssey and name the building IPC West. Permits for its backup batteries and diesel fuel tanks were issued in June, July and August 2026, and the building permit was still open when we checked on October 10, 2026. The building is under construction, and we found no record that it is in service. American Express has not announced it. No public record we found gives its power capacity or an opening date.
American Express's long-time Phoenix data center is the Information Processing Center at 3151 W. Behrend Drive in Deer Valley, a building of about 300,000 square feet. Aligned Data Centers bought that building in September 2022, and city permits show American Express still using it in 2024 and 2025. It has its own page, American Express Information Processing Center.
Every statement above is listed with its source and the exact words under How we know this, further down this page.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-10. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
DESCRIPTION OF WORK: New construction of a 240,000SF Data Center Facility.
Floor area: 240,000 sq ft
DESCRIPTION OF WORK: New construction of a 240,000SF Data Center Facility.
Location: 19400 N 56th St, Phoenix
Address 19400 N 56TH ST PHOENIX AZ 85054
A 2015 securities filing by the buyer says the data center processed 100% of American Express's global credit card authorizations.
The Data Center is utilized to process 100% of AMEX's global credit card authorizations and the Technical Resource Center houses AMEX employees who maintain AMEX's technology infrastructure and perform testing and research and development functions.
Aligned Data Centers bought the two Behrend Drive buildings from Griffin Realty Trust in September 2022 for $93 million.
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust. The two acquisitions totaled $93 million in an all-cash deal, according to an affidavit of property value recorded in Maricopa County.
On September 23, 2022, the Company sold one property located in Phoenix, Arizona. The sale price for the property was $93.0 million, less closing costs and other closing credits.
Aligned had purchased two office buildings on the site for $93 million in 2022 with plans for a 513,361-square-foot data center and office space.
The tracker's public record for the 7.25 MW listing gives the address 3151 W. Behrend Drive and application and approval dates of January 1, 2024.
Address 3151 W Behrend Dr, Phoenix, AZ 85027
Application Date Jan 1, 2024 Approval Date Jan 1, 2024
Address 3151 W Behrend Dr, Phoenix, AZ 85027
American Express's annual reports for every year from 2019 through 2025 list American Express data centers in Phoenix, Arizona and Greensboro, North Carolina among its owned or leased locations.
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
Other owned or leased principal locations include American Express offices in Phoenix, Arizona
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
the American Express data centers in Phoenix, Arizona and Greensboro, North Carolina
American Express also has a large office campus in north Phoenix, the Desert Ridge campus at 56th Street and Mayo Boulevard.
American Express is creating a fourth building on its 90-acre Desert Ridge campus at 56th Street and Mayo Boulevard in North Phoenix.
American Express Desert Ridge, situated on 94-acres in northeast Phoenix, provides a new modern office space designed for collaboration.
A contractor that worked on the campus describes two 190,000-square-foot office buildings and a 182,000-square-foot Central Services Building on 94 acres, with a data communication center inside the office facility.
The American Express Phoenix Campus is situated on 94-acres in Northeast Phoenix. The campus consists of two 190,000-square-foot office buildings and a 182,000-square foot Central Services Building.
The office facility houses a data communication center, kitchen, and cafeteria with seating for over 700, a health center, and office space for 3,100 employees.
One permit-tracking site lists the campus address, 18850 N. 56th Street, as an operating American Express data center.
American Express is a operational data center located in Phoenix, AZ. The facility is operated by American Express Travel Related Services Company Inc.
Address 18850 N 56th St City Phoenix County Maricopa State AZ
American Express Visit Website 18850 N. 56th St Phoenix, AZ 85054
A data center listing site names American Express's North Carolina data center IPC2.
Project Green, at 5301 McConnell Road, sits on 194 acres in and adjoining Rock Creek Center, a business park south of the interstate, seven miles east of Greensboro.
The City of Phoenix issued building permit BLD 25010088 on June 13, 2025 for the new construction of a 240,000-square-foot data center at 19400 N. 56th Street.
DESCRIPTION OF WORK: New construction of a 240,000SF Data Center Facility.
Permit # BLD 25010088 Issued 13-JUN-2025 Expires 13-JUN-2027
Address 19400 N 56TH ST PHOENIX AZ 85054
The permit is titled American Express - Project Odyssey, gives the type of business as Data Center and states a valuation of $260,000,000, which is $260 million.
Permit Description AMERICAN EXPRESS - PROJECT ODYSSEY
TYPE OF BUSINESS:Data Center
Valuation: $260,000,000
The permit names Holder Construction Company as the general contractor and the Arizona State Land Department as the property owner.
Name HOLDER CONSTRUCTION COMPANY
Name ARIZONA STATE LAND DEPARTMENT
The permit's status is open and it runs to June 13, 2027.
STATUS: OPEN
Expires 13-JUN-2027
The city assigned the address in August 2024 under the project name American Express Data Center.
PER_TYPE: ADDR PER_NUM: 240231 PROJECT: 99-35425 PERMIT_NAME: AMERICAN EXPRESS DATA CENTER
STREET_FULL_NAME: 19400 N 56TH ST
A permit issued on April 13, 2026 describes a single-story data center building with a single-story office space, about 263,000 square feet in total, and states a valuation of $360,000,000, which is $360 million.
DESCRIPTION OF WORK: Single-story data center building with a single-story office space, totaling approximately 263,000 total SF.
Permit # S 26005630 Issued 13-APR-2026
Valuation: $360,000,000
The city's annual facilities permit for the building names it IPC West and gives its floor area as 239,344 square feet.
FACILITY NAME: IPC WEST
BUILDING SQUARE FOOTAGE: 239,344
On June 10, 2026 the city issued a permit for uninterruptible power supply systems with lead-acid batteries at the address.
Scope: INSTALLATION OF ENERGY STORAGE SYSTEM (ESS) CONSISTING OF UPS SYSTEMS UTILIZING VALVE REGULATED LEAD ACID (VRLA ) BATTERIES.
Permit # F230 26008084 Issued 10-JUN-2026
In July 2026 it issued permits for six 30,000-gallon underground diesel tanks and fifteen 200-gallon day tanks.
DESCRIPTION OF WORK: Install six 30,000 gal underground diesel tanks UL 1316.
DESCRIPTION OF WORK: Install fifteen 200 gal max above ground diesel day tanks UL 2085.
A permit for the fuel oil storage and piping, titled American Express - Project Fuel, followed on August 4, 2026.
DESCRIPTION OF WORK: This permit application is associated with the fuel oil storage and piping for the above building.
Permit # SME 26009286 Issued 04-AUG-2026
A permit-tracking site lists a proposed 7.25 MW American Express data center in Phoenix.
American Express is a proposed data center with 7.25 MW of power capacity developed by American Express Travel Related Services Company Inc in Phoenix, AZ.
American Express's long-time Phoenix data center is the Information Processing Center at 3151 W. Behrend Drive, a three-story building of about 300,000 square feet in the Deer Valley area.
The American Express Center property consists of two buildings: a three-story approximately 300,000 square foot Class "A" data center ("Data Center") and a four-story approximately 213,400 square foot Class "B" office building ("Technical Resource Center").
The American Express Center property is located in Phoenix, Arizona within the Deer Valley Submarket, a mile from Interstate 17 and AZ Loop 101.
certain premises in the building (the "Building") located at 3151 W. Behrend Drive, Phoenix, Arizona
Permit Description AMERICAN EXPRESS IPCP
City permits issued for the Behrend Drive data center in November and December 2024 and in April 2025 name American Express.
TYPE OF BUSINESS: AMERICAN EXPRESS
Permit # OE 24019042 Issued 12-NOV-2024
Permit Description AMERICAN EXPRESS FIRE PUMP REPLACEMENT
Permit # F117 24020664 Issued 13-DEC-2024
Permit # ELEC 25005059 Issued 01-APR-2025
Project AFP I-0888 AMERICAN EXPRESS IPC-AFP
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Arizona AI found no certificate of occupancy for the building in the city's records, and the building permit was still open when we checked on October 10, 2026. Arizona AI lists the floor area as 240,000 square feet, the figure in the building permit's description of the work. The same permit's data field gives 236,279 square feet, and the later permits give 239,344 and about 263,000 square feet, the last with the office space included. Arizona AI found no announcement from American Express and no press report about this building. Arizona AI found no public record of the building's power capacity or its opening date. Arizona AI could not tie that listing to the Desert Ridge building: the tracker's record gives a different address and names no permit, and the city's permits for the new building state no power figure. Arizona AI therefore shows no power figure on this page. An earlier version of this page said the listing most likely described the Behrend Drive building and not a new project. The city permits show that a new American Express data center is being built, and Arizona AI corrected this page on October 10, 2026. Arizona AI gives the full history of that building on a separate page, American Express Information Processing Center. Arizona AI found no address for a Phoenix data center in American Express's annual reports. The Behrend Drive data center is known as the Information Processing Center, or IPC, which may explain the name IPC West. No source says so directly. The city permits Arizona AI read for the campus address name office buildings. The data center permits are for a separate address, 19400 N. 56th Street.