The live tracker for Arizona's AI economy

QTS Phoenix 3 Campus

Proposed data center in W Camelback Rd, Glendale (Litchfield Park mailing address). Operated by QTS.

This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.

Where it is

2023 aerial photo of the 17 QTS Glendale plat lots identified in Glendale's FP23-12 record as a future data center site, outlined in yellow.
Aerial photo flown 2023: USDA National Agriculture Imagery Program (NAIP); source: USGS, USDA, The National Map: Orthoimagery (public domain). Outline drawn by Arizona AI from Maricopa County Assessor parcel records.

Outlined in yellow: the 17 lots of the QTS Glendale plat, identified in Glendale's FP23-12 record as a future data center site. It shows the land, not where buildings would go. Parcels: City of Glendale, FP23-12 QTS Glendale final-plat council record, seventeen lots for data center/industrial use. Shapes: Maricopa County Assessor (read November 8, 2026).

Open in Google Maps

  • Capacity at full build-out: 750 MW
  • Floor area: 3.0M sq ft
  • Land: 375 acres

Capacity: Figure reported in the press: computing (IT) load, at full build-out. QTS website figure, reported May 2024.

Working here

Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.

Other QTS facilities in Arizona

How we know this

Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.

Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.