QTS Phoenix Van Buren is a QTS data center site at 120 E Van Buren St in downtown Phoenix, inside the building Digital Realty lists as PHX10. City electrical permits named QTS in Suite 200 in April 2025 and in basement Suite C130B in December 2025.
We found no recent public information about this project. The latest we found is from December 5, 2025. The latest dated record naming QTS at 120 East Van Buren Street is a City of Phoenix electrical permit issued December 5, 2025 for QTS circuit additions in basement Suite C130B. QTS's own location list and sitemap name Phoenix 2, Phoenix 3 and Phoenix 4 in Arizona and no Van Buren site, and its old Phoenix Van Buren web address now forwards to its all-locations list. QTS had a 32 MW site there in July 2024, according to Data Center Dynamics. It may have been abandoned or put on hold. Its figures are not counted in the statewide totals.

Outlined in yellow: Shared building parcel 111-45-077B containing QTS suites at 120 E Van Buren St, Phoenix. It shows the land, not where buildings would go. Parcels: City of Phoenix, OE 25020565, QTS suite C130B work in shared building parcel 111-45-077B. Shapes: Maricopa County Assessor (read November 8, 2026).
Capacity: Figure reported in the press. Reported May 2023. The source does not say what the figure measures.
Compiled from public records and checked on 2026-11-13. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: No recent information
Note: The latest dated record naming QTS at the address is a City of Phoenix electrical permit issued December 5, 2025. Listing sites still show the site running, without a date. QTS's own site no longer lists it, and the building is listed separately as Digital Realty PHX10.
and a 288,000 sq ft (26,755 sqm), 32MW site at 120 East Van Buren Street.
Phoenix 2 Phoenix, Arizona In Development Phoenix 3 Glendale, Arizona In Development Phoenix 4 Avondale, Arizona In Development
DESCRIPTION OF WORK: STE 200 QTS, CAGE 202 CIRCUIT ADDITIONS JULY 2019.
DESCRIPTION OF WORK: STE.200 QTS, CIRCUIT DEMOLITIONS & ADDITIONS APRIL 2025 (2025_013)
DESCRIPTION OF WORK: C130B QTS NOVEMBER 2025 CKT ADDS
Last reported capacity: 32 MW
Note: Press reports from 2023 and 2024 give 32 MW for the facility without saying how it is measured.
The 288,000 sq ft (26,750 sqm) facility offers 32MW of capacity.
and a 288,000 sq ft (26,755 sqm), 32MW site at 120 East Van Buren Street.
Location: 120 E Van Buren St, Phoenix
The company operates a second campus at 120 East Van Buren Street in downtown Phoenix.
The latest dated record naming QTS at 120 East Van Buren Street is a City of Phoenix electrical permit issued December 5, 2025 for QTS circuit additions in basement Suite C130B.
Permit # OE 25020565 Issued 05-DEC-2025
DESCRIPTION OF WORK: C130B QTS NOVEMBER 2025 CKT ADDS
QTS's own location list and sitemap name Phoenix 2, Phoenix 3 and Phoenix 4 in Arizona and no Van Buren site, and its old Phoenix Van Buren web address now forwards to its all-locations list.
Phoenix 2 Phoenix, Arizona In Development Phoenix 3 Glendale, Arizona In Development Phoenix 4 Avondale, Arizona In Development
<loc>https://q.com/data-centers/phoenix-2/</loc>
<loc>https://q.com/data-centers/phoenix-4/</loc>
<loc>https://q.com/data-centers/phoenix-3/</loc>
location: https://q.com/data-centers/phoenix-1/
location: https://q.com/data-centers/
QTS had a 32 MW site there in July 2024, according to Data Center Dynamics.
and a 288,000 sq ft (26,755 sqm), 32MW site at 120 East Van Buren Street.
A City of Phoenix permit for 120 E Van Buren St, issued in August 2026, names the owner as Digital Phoenix Van Buren LLC.
DIGITAL PHOENIX VAN BUREN LLC
Issued 03-AUG-2026
120 E VAN BUREN ST PHOENIX AZ 85004-2204
City of Phoenix electrical permits at 120 E Van Buren St name QTS in the description of work for Suite 200 in July 2019 and April 2025 and for basement Suite C130B in December 2025, and a 2015 permit for Suite C130B names Carpathia.
Permit Description SUITE C130B, CAGE 0003, CARPATHIA
DESCRIPTION OF WORK: STE 200 QTS, CAGE 202 CIRCUIT ADDITIONS JULY 2019.
DESCRIPTION OF WORK: STE.200 QTS, CIRCUIT DEMOLITIONS & ADDITIONS APRIL 2025 (2025_013)
Permit # OE 25020565 Issued 05-DEC-2025
DESCRIPTION OF WORK: C130B QTS NOVEMBER 2025 CKT ADDS
Baxtel, a listing site, says QTS acquired the Van Buren site through its 2015 acquisition of Carpathia.
QTS acquired this site via the Carpathia acquisition in 2015.
The Center for Land Use Interpretation says Digital Realty Trust bought the facility in 2006 for $175 million, a higher figure than the county's recorded sale price.
In 2006, Digital Realty Trust purchased the facility for $175 million.
The building at 120 E Van Buren went up in 1947 and was The Arizona Republic's home until the paper moved across the street to 200 E Van Buren in 1995, according to the Republic.
located close to 200 E. Van Buren St., where The Republic had operated since 1995. Before that, The Republic was across the street at 120 E. Van Buren, a building that went up in 1947.
Digital Realty lists the building as its PHX10 data center, four stories and 275,000 sq ft in total, served by over 36 carriers.
Building structure : 4 stories Total building size : 275,000 ft² (25,550 m²)
This colocation center is served by over 36 carriers and located on a fiber crossroad for almost every national network.
Maricopa County Air Quality lists the 120 E Van Buren St data center under Digital Realty Trust Inc with synthetic minor air permit P0009034.
"facility_nm":"Digital Realty Trust","address1":"120 E Van Buren St","parcel_no":"111-45-077B","name":"Digital Realty Trust Inc"
"permit_nbr":"P0009034","permit_classification_dsc":"Synthetic Minor","operating_status_dsc":"Operating"
Electrical permits at 120 E Van Buren also name other companies in Suite C130A, PacketHub in November 2025 and Cirrascale Cloud Services in April 2026.
C130A PACKETHUB NOVEMBER 2025 CKT ADDS
C130A CIRRASCALE CLOUD SERVICES APRIL 2026 CKT ADDS
Listing sites still show the QTS site running, without a date: Baxtel calls it a fully operational facility, Cleanview lists it as operating and datacenterHawk lists it as commissioned.
Operational Fully operational facility
Status Operating Developer QTS Location Maricopa County, Arizona Power capacity On paid plans
Commissioned This facility has been commissioned. Under Construction There is no leaseable power under construction. Planned There are no plans to add additional leaseable power.
PeeringDB, a network operator directory, lists a facility named QTS Phoenix (PHX1) at 120 E Van Buren St in suites C130 and 200, with 8 networks present, in a record last updated on September 26, 2025.
Address 1 120 E Van Buren St Address 2 Suite C130, 200 Location Phoenix , AZ , 85004
QTS Phoenix (PHX1) Networks 8 Local Exchanges 1
Last Updated 2025-09-26T22:45:09Z
Ninja-IX, an internet exchange operator, lists QTS Phoenix-Van Buren as its second Phoenix site and says members can connect off its colocated switch within the QTS Suite. The page gives no date.
you can connect here via an extension off of our colocated switch within the QTS Suite.
QTS Phoenix-Van Buren Our second site and home of our 2nd pair of Route Servers and Root Servers.
Commercial Property Executive reported on May 24, 2024 that the QTS data center at 120 E. Van Buren has a 288,000-square-foot building and 32 MW of utility power capacity.
Another QTS data center is at 120 E. Van Buren in Phoenix. The facility has a 288,000-square-foot building and 32 MW of utility power capacity.
Digital Realty's 2025 PHX10 factsheet gives the four-level building at 120 East Van Buren Street as 288,000 square feet, the same size Commercial Property Executive gave in 2024 for the QTS data center there.
Building • 4 Levels; 288,000 sq.ft.
Another QTS data center is at 120 E. Van Buren in Phoenix. The facility has a 288,000-square-foot building and 32 MW of utility power capacity.
Digital Realty said on April 5, 2010 that the power capacity at its 120 East Van Buren Street building, which it described as a 287,500 square foot data center facility, then totaled 31.4 MW.
The power capacity at the building now totals 31.4 MW.
a 287,500 square foot data center facility in Phoenix
A Data Center Catalog listing for QTS Phoenix at 120 East Van Buren Street, with page data dated February 21, 2019, says the facility is over 380,000 sq ft with 108,000 sq ft of raised floor and also lists a 288000 sq ft feature.
At over 380,000 sq. ft., with 108,000 sq. ft. of raised floor space, the Phoenix facility has space available to handle all data center size requirements.
Features 288000sq. ft.
Baxtel says QTS does not own the building and leases the site from Digital Realty Trust.
Ownership: QTS Data Centers does not own the building. This site is leased from Digital Realty Trust in the 120 E Van Buren - Digital Realty building
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
The building itself is listed separately as Digital Realty PHX10.