Proposed data center in Mesa. Operated by Amazon Web Services.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
ZON24-00019 - "PHX062" Agenda Ready PZ Zoning - Action [...] Approved (Vote 6-0; Chair Ayers, absent)
ZON25-00599. "AWS PHX 062," Agenda Ready PZ Zoning - Action [...] Approved (5-0; Chair Ayers and Boardmember Montes, absent)
Map record 3406: AWS Elliot Road - Building 1 | status Planned | capacityMw 96.3
Capacity: 96 MW
Note: Only a listing site gives this figure.
Map record 3406: AWS Elliot Road - Building 1 | status Planned | capacityMw 96.3
Floor area: 227,000 sq ft
Note: A 2023 press report gives this as the planned size of each building and does not name the site.
Each plan calls for two 227,000 sq ft (21,090 sqm) data center buildings on land owned by Amazon.
Expected: 2028
Note: A listing site gives 2028 as the year planned for the whole Elliot campus.
Year Planned: 2028 Lot Size: 43 acres
Location: Mesa
Located south of Elliot Road and west of Signal Butte Road (36.9± acres).
Mesa's Planning and Zoning Board approved zoning case ZON24-00019 for the PHX062 site on Elliot Road in May 2024 and a second case for the site, ZON25-00599, in November 2025.
ZON24-00019 - "PHX062" Agenda Ready PZ Zoning - Action [...] Approved (Vote 6-0; Chair Ayers, absent)
ZON25-00599. "AWS PHX 062," Agenda Ready PZ Zoning - Action [...] Approved (5-0; Chair Ayers and Boardmember Montes, absent)
Located south of Elliot Road and west of Signal Butte Road (36.9± acres).