Csquare PHX1

Operating data center in 615 N 48th St, Phoenix. Operated by Centersquare.

This record describes part of a larger campus. Its capacity is counted once at campus level in the statewide totals, so it is not added again here.

  • Capacity: 13 MW

Capacity: Operator's own figure. Csquare: backup power (UPS) capacity. The source does not say what the figure measures.

Working here

Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.

Rest of Iron Mountain Phoenix campus

  • Iron Mountain AZP-1
    Iron Mountain · 615 N 48th St, Phoenix · Operating · 41 MW · 588,669 sq ft
  • Iron Mountain AZP-2
    Iron Mountain · 4802 E Van Buren St, Phoenix · Operating · 48 MW · 530,000 sq ft
  • Iron Mountain AZP-3
    Iron Mountain · 5100 E Roosevelt St, Phoenix · Operating · 36 MW · 230,000 sq ft

Other Centersquare facilities in Arizona

  • Csquare PHX3
    Centersquare · 1301 W University Dr, Mesa · Operating · 8 MW · 154,158 sq ft

How we know this

Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.

Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.

Our own notes

These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.

To avoid counting one building twice, only AZP-1 is added into the totals.