Operating data center in 615 N 48th St, Phoenix. Operated by Iron Mountain.

Outlined in yellow: Parcel 125-08-007A, named in Maricopa County's Phoenix Data Center record for Iron Mountain. It shows the land, not where buildings would go. Parcels: Maricopa County Air Quality Department, Phoenix Data Center facility record F002655, parcel 125-08-007A. Shapes: Maricopa County Assessor (read November 8, 2026).
Capacity: Operator's own figure. Iron Mountain. The source does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
1.7 MW currently available throughout the facility
615 North 48th Street Operational Fully operational facility
Capacity: 41 MW
AZP-1 588,669 ft 2 facility located on a 39-acre campus just 10 minutes east of downtown Phoenix 41 MW of capacity with additional capacity at near by facilities
existing 39-acre campus that houses their AZP1 (41 megawatt) and AZP2 (48 megawatt) data centers.
Floor area: 588,669 sq ft
AZP-1 588,669 ft 2 facility located on a 39-acre campus just 10 minutes east of downtown Phoenix
Location: 615 N 48th St, Phoenix
615 North 48th Street, Phoenix, Arizona [...] 124,324 | | | 2018
615 North 48th Street Operational Fully operational facility
An existing facility of about 589,000 sq ft that Iron Mountain acquired in 2018 and markets with capacity available.
AZP-1 588,669 ft 2 facility located on a 39-acre campus just 10 minutes east of downtown Phoenix
1.7 MW currently available throughout the facility
a 588,000 sq ft (55,000 sq m) building it acquired when it bought IO Data Centers last year