Iron Mountain AZS-1 is an operating data center at 8521 E Princess Dr in Scottsdale. Iron Mountain describes it as a 121,000 square foot facility on a 4.5-acre campus with 5.8 MW of capacity.
Operating data center in 8521 E Princess Dr, Scottsdale. Operated by Iron Mountain.
Iron Mountain says AZS-1 is located only a few minutes from its Phoenix campus and interconnected to it, and that its capacity is matched by 100% renewables. Its 2025 annual report says Iron Mountain acquired the property in connection with its acquisition of IO Data Centers. A listing site also names the facility as operational. Iron Mountain's quarterly reports filed with the SEC list 5.7 MW there, all leased since March 31, 2023. Cartis, a data center research site, says Iron Mountain's current marketing identifies 9.6 MW of future scalability.

Outlined in yellow: Parcel 215-07-212A, named for Scottsdale Data Center AZS-1 in Maricopa County air quality records. It shows the land, not where buildings would go. Parcels: Maricopa County Air Quality Department, Scottsdale Data Center AZS-1 facility record F002278, parcel 215-07-212A. Shapes: Maricopa County Assessor (read November 8, 2026).
Capacity: Operator's own figure. Iron Mountain. The source does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-11-13. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
300 kW currently available throughout the facility
8521 East Princess Drive Operational Fully operational facility
AZS-1 is the operating Scottsdale facility with 5.7 MW leaseable in Q2 2026, while current marketing rounds total facility power to 5.8 MW and identifies 9.6 MW future scalability.
Capacity: 5.80 MW
5.8 MW of capacity with additional capacity at near by facilities
Floor area: 121,000 sq ft
121,000 ft 2 facility located on a 4.5-acre campus away from the congestion of downtown Phoenix
Land: 4.5 acres
121,000 ft 2 facility located on a 4.5-acre campus away from the congestion of downtown Phoenix
Location: 8521 E Princess Dr, Scottsdale
8521 E. Princess Drive, Scottsdale, Arizona [...] 2018 [...] (5) [...] (5)Property was acquired in connection with our acquisition of IO Data Centers, LLC.
with AZS-1 in Scottsdale, located only a few minutes away, interconnected to the Phoenix campus.
8521 East Princess Drive Operational Fully operational facility
An existing 121,000 sq ft facility at 8521 East Princess Drive, Scottsdale. Iron Mountain's 2025 annual report lists the address with the year 2018.
121,000 ft 2 facility located on a 4.5-acre campus away from the congestion of downtown Phoenix
300 kW currently available throughout the facility
8521 E. Princess Drive, Scottsdale, Arizona [...] 2018 [...] (3)Date of construction or acquired represents the date we constructed the facility or acquired the facility through purchase or acquisition.
8521 East Princess Drive Operational Fully operational facility
Iron Mountain's 2025 annual report says it acquired the property in connection with its acquisition of IO Data Centers.
8521 E. Princess Drive, Scottsdale, Arizona [...] 2018 [...] (5) [...] (5)Property was acquired in connection with our acquisition of IO Data Centers, LLC.
Iron Mountain says its 5.8 MW of capacity there is matched by 100% renewables.
121,000 ft2 facility located on a 4.5-acre campus away from the congestion of downtown Phoenix [...] 5.8 MW of capacity with additional capacity at near by facilities Matched by 100% renewables
Iron Mountain's quarterly reports filed with the SEC list 5.7 MW at AZS-1, all leased since March 31, 2023.
Data Center Operating Portfolio Stabilized Pre-Stabilized Total Leaseable MW Leased % by MW Leaseable MW Leased % by MW Leaseable MW Leased % by MW [...] Scottsdale AZS-1 5.7 100.0% — — 5.7 100.0%
Data Center Operating Portfolio Stabilized Pre-Stabilized Total Leaseable MW Leased % by MW Leaseable MW Leased % by MW Leaseable MW Leased % by MW [...] Scottsdale AZS-1 5.7 100.0% — — 5.7 100.0%
AZS-1 is the operating Scottsdale facility with 5.7 MW leaseable in Q2 2026, while current marketing rounds total facility power to 5.8 MW and identifies 9.6 MW future scalability.
Iron Mountain's Scottsdale page says AZS-1 has 121,000 square feet of raised floor data center space across four data halls on a 4.5-acre campus, with potential to scale power to 9.6 MW.
AZS-1 features 121,000 square feet of raised floor data center space across four data halls on a 4.5-acre campus.
Potential to scale power to 9.6 MW