Proposed data center in Mesa. Operated by Google.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Stories in Arizona AI's news feed that name this facility, newest first.
Compiled from public records and checked on 2026-10-11. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
"Redhawk - Phase 3" 187± acres located at the northwest corner of South Sossaman Road and East Elliot Road. Design Review of a Data Center.
Mesa - Building 3 is a planned data center located in Maricopa, Arizona. It is expected to become operational in 2027. Being developed by Google.
Map record 3677: Mesa - Building 3 | status Planned | capacityMw 138
Capacity: 138 MW
Note: Only the listing site Cleanview gives this figure.
Map record 3677: Mesa - Building 3 | status Planned | capacityMw 138
Expected: 2027
Note: Only a listing site gives this year.
Mesa - Building 3 is a planned data center located in Maricopa, Arizona. It is expected to become operational in 2027. Being developed by Google.
Location: Mesa
"Redhawk - Phase 3" 187± acres located at the northwest corner of South Sossaman Road and East Elliot Road. Design Review of a Data Center.
Mesa - Building 3 is a planned data center located in Maricopa, Arizona. It is expected to become operational in 2027. Being developed by Google.
The third building on Google's Mesa campus: a single-story data center with two server halls, in design review in October 2025.
"Redhawk - Phase 3" 187± acres located at the northwest corner of South Sossaman Road and East Elliot Road. Design Review of a Data Center.
2025-10-14T00:00:00 0 279 Design Review Board DSN 25043
The Phase III submission details plans for a single-story data center with two server halls
The City of Mesa issued a permit on September 11, 2025 for mass grading and drainage work for Phase 3 of the Redhawk campus, PMT25-14551.
Phase 3 mass grading and drainage civil work.
"issued_date":"2025-09-11T00:00:00.000"
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
The city's permits name phases, not buildings. Arizona AI takes Phase 3 to be this building, the third on the campus, but no city record states that.