Prime Data Centers: Phoenix Campus
Operated by Prime Data Centers · Avondale
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
- Capacity
- 240 MW
- Floor area
- 1.3M sq ft
- Land
- 67 acres
- Expected
- 2025
Working here
We do not publish per-facility headcount, because no reliable public figures exist for these sites and construction announcements are not permanent employment. What we can show is real: open Arizona roles at this operator, gathered from their own job board.
More Arizona data centers
ProposedTract BuckeyeBuckeye1.8 GWProposedHassayampa Ranch Data CenterBuckeye area (approximate)1.5 GWProposedQTS Phoenix 3 CampusPhoenix metro (approximate)750 MW · 3.0M sq ftOperatingEdgeCore Mesa: PH03Mesa450 MW · 3.1M sq ftProposedNovva Mesa ArizonaMesa300 MW · 1.3M sq ftOperatingStream Data Center: Phoenix I-VIIGoodyear280 MW · 418,200 sq ft
See all Arizona data centersSources and confidence
Compiled from public records and checked on 2026-08-06. Our confidence in this record is high. Blank figures above mean the number is not publicly established, not that it is zero.
Source: cleanview.co
Operator site: https://primedatacenters.com/
Something here wrong or out of date? Tell us.