Prime Data Centers PHX01 Building 3
Operated by Prime Data Centers · 3700 S Avondale Blvd, Avondale
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
This record describes part of a larger campus. Its capacity is counted once at campus level in the statewide totals, so it is not added again here.
- Capacity
- 48 MW
- Floor area
- 267,000 sq ft
Capacity: Figure reported in the press: computing (IT) load. Prime figure reported May 2026.
Rest of Prime Data Centers PHX01 campus
- Prime Data Centers PHX01 Building 1Proposed · 48 MW
- Prime Data Centers PHX01 Building 2Proposed · 48 MW
- Prime Data Centers PHX01 CampusProposed · 240 MW at full build-out
More Arizona data centers
How we know this
Compiled from public records and checked on 2026-10-07. Our confidence in this record is high. Blank figures above mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: The source is a May 2026 report that Prime broke ground on the first three buildings.
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Show quote
Prime Data Centers broke ground on the first three buildings of its PHX01 campus in Avondale
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Capacity: 48 MW
Note: This is the planned IT load Prime gave for each of the first three buildings.
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Show quote
The company said each of the first three buildings will deliver 48MW of critical IT load, for a combined 144MW in the opening phase.
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Floor area: 267,000 sq ft
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Show quote
The first three buildings are listed at 267,000 square feet and 48MW each.
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Location: 3700 S Avondale Blvd, Avondale
- [2] Baxtel, PDC Breaks Ground on Three Buildings at Phoenix Campus (opens in a new tab) · May 22, 2026
Show quote
The campus is being developed on a 66.5-acre site at 3700 S. Avondale Boulevard in Phoenix
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Show quote
Prime Data Centers broke ground on the first three buildings of its PHX01 campus in Avondale
- [2] Baxtel, PDC Breaks Ground on Three Buildings at Phoenix Campus (opens in a new tab) · May 22, 2026
Prime said in May 2026 that it had broken ground on this building and that it was already secured by a leading hyperscaler.
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Show quotes
Prime Data Centers broke ground on the first three buildings of its PHX01 campus in Avondale
Prime also said Buildings 1 through 3 have already been secured by a leading hyperscaler
The start marks the opening phase of a $3 billion planned investment, the company said in a May 21, 2026, statement
- [1] ConstructConnect News, Prime Data Centers Breaks Ground on Three Buildings in Phoenix (opens in a new tab) · May 26, 2026
Our own notes
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Counted once in the campus total.
Operator site: https://primedatacenters.com/