Proposed data center in 3700 S Avondale Blvd, Avondale. Operated by Prime Data Centers.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
This record describes part of a larger campus. Its capacity is counted once at campus level in the statewide totals, so it is not added again here.

Outlined in yellow: Shared Prime PHX01 campus parcel for Buildings 1 to 5. It shows the land, not where buildings would go. Parcels: City of Avondale, Engineering record ELAS-26-0005, Prime PHX01 five-building campus, parcel 500-66-005K. Shapes: Maricopa County Assessor (read November 8, 2026).
Capacity: Figure reported in the press: computing (IT) load. Prime figure reported May 2026.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: The source is a May 2026 report that Prime broke ground on the first three buildings.
Prime Data Centers broke ground on the first three buildings of its PHX01 campus in Avondale
Capacity: 48 MW
Note: This is the planned IT load Prime gave for each of the first three buildings.
The company said each of the first three buildings will deliver 48MW of critical IT load, for a combined 144MW in the opening phase.
Floor area: 267,000 sq ft
The first three buildings are listed at 267,000 square feet and 48MW each.
Location: 3700 S Avondale Blvd, Avondale
The campus is being developed on a 66.5-acre site at 3700 S. Avondale Boulevard in Phoenix
Prime Data Centers broke ground on the first three buildings of its PHX01 campus in Avondale
Prime said in May 2026 that it had broken ground on this building and that it was already secured by a leading hyperscaler.
Prime Data Centers broke ground on the first three buildings of its PHX01 campus in Avondale
Prime also said Buildings 1 through 3 have already been secured by a leading hyperscaler
The start marks the opening phase of a $3 billion planned investment, the company said in a May 21, 2026, statement
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Counted once in the campus total.