The live tracker for Arizona's AI economy

Stack Infrastructure PHX01 Campus

Proposed data center in 3001 S Litchfield Rd, Avondale. Operated by Stack Infrastructure.

This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.

  • Capacity at full build-out: 225 MW
  • Land: 100 acres

Capacity: Operator's own figure: computing (IT) load, at full build-out. STACK: critical capacity.

Working here

Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.

Other Stack Infrastructure facilities in Arizona

  • Stack Infrastructure PHX02 Campus
    Stack Infrastructure · 800 N 40th St, Phoenix · Proposed · 250 MW at full build-out · 1.7M sq ft
  • Stack PHX01A
    Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Proposed · 98 MW
  • Stack PHX01B
    Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Proposed · 98 MW
  • Stack PHX01C
    Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Proposed · 98 MW
  • Stack PHX02A
    Stack Infrastructure · 800 N 40th St, Phoenix · Proposed · 65 MW
  • Stack PHX02B
    Stack Infrastructure · 800 N 40th St, Phoenix · Proposed · 65 MW
  • Stack PHX02C
    Stack Infrastructure · 800 N 40th St, Phoenix · Proposed · 65 MW

How we know this

Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.

Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.