Proposed data center in 800 N 40th St, Phoenix. Operated by Stack Infrastructure.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Capacity: Operator's own figure: computing (IT) load, at full build-out. STACK: nearly 250 MW of critical capacity.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: One listing site calls the campus under construction. Another says Building 1 is planned and not commissioned.
announced its plans to develop a five-building, 230MW campus in the heart of central Phoenix, Arizona.
PHX02 Building 1, a planned facility announced by STACK Infrastructure, is located at 800 N 40th Street in the Phoenix market.
Commissioned This facility has not yet been commissioned or leased. Under Construction There is no leaseable power under construction.
Capacity at full build-out: 250 MW
Note: The operator says nearly 250 MW, as the design for all five buildings.
The five-building campus is designed to deliver nearly 250MW of critical capacity, powered by a dedicated on-site substation
250MW 5 Building 51 ACRES
Floor area: 1.7M sq ft
Note: The operator gave this in 2022 as the planned size of the whole campus.
The more than 1.7 million square foot campus will include a low water use design that supports client sustainability targets
Land: 51 acres
250MW 5 Building 51 ACRES
Situated on 51 acres in central Phoenix
Location: 800 N 40th St, Phoenix
Situated on 51 acres in central Phoenix
PHX02 Building 1, a planned facility announced by STACK Infrastructure, is located at 800 N 40th Street in the Phoenix market.
800N 40th St Under Construction New facility under construction
A five-building campus of more than 1.7 million sq ft on 51 acres near Sky Harbor Airport, announced November 8, 2022.
announced its plans to develop a five-building, 230MW campus in the heart of central Phoenix, Arizona.
The more than 1.7 million square foot campus will include a low water use design that supports client sustainability targets
250MW 5 Building 51 ACRES
STACK's PHX02 campus is strategically located near the largest network hub in the region and just minutes from Sky Harbor International Airport.
One listing site shows it as under construction, and another says Building 1 has not yet been commissioned.
800N 40th St Under Construction New facility under construction
Commissioned This facility has not yet been commissioned or leased. Under Construction There is no leaseable power under construction.