Proposed data center in 800 N 40th St, Phoenix. Operated by Stack Infrastructure.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
This record describes part of a larger campus. Its capacity is counted once at campus level in the statewide totals, so it is not added again here.
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: Only listing sites give this status.
800 N 40th St Planned Future facility in planning stage
Map record 4226: Stack PHX02B | status Planned
Capacity: 65 MW
Note: Only one listing site, Cleanview, gives this figure.
Map record 4226: Stack PHX02B | status Planned | capacityMw 65
Expected: 2027
Note: Only one listing site gives this year.
Short Code: PHX02B Year Planned: 2027
Location: 800 N 40th St, Phoenix
800 N 40th St Planned Future facility in planning stage
PHX02 Building 1, a planned facility announced by STACK Infrastructure, is located at 800 N 40th Street in the Phoenix market.
Listed as planned at 800 N 40th Street, Phoenix, the same address as STACK's PHX02 Building 1.
800 N 40th St Planned Future facility in planning stage
PHX02 Building 1, a planned facility announced by STACK Infrastructure, is located at 800 N 40th Street in the Phoenix market.