Operating data center in Phoenix. Operated by Aligned.
Capacity: Operator's own figure: computing (IT) load, one phase. Aligned figure for the first phase when the building opened in 2017.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Stories in Arizona AI's news feed that name this facility, newest first.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: The newest source showing it running is a December 2024 press tour.
The Aligned Data Centers - Phoenix 01/02/03 data center was completed in 2017 [...] The tour began with an overview of live data center operations
announced today the opening of its second ultra-efficient, adaptive data center in Phoenix, Arizona.
Capacity for one phase: 62 MW
Note: Aligned gave this figure for the first phase when the building opened in 2017.
the newly completed 550,000-square-foot Phoenix data center offers 62MW (megawatt) of IT power for its first phase, expandable up to 120MW at full build.
Floor area: 550,000 sq ft
Note: The source gives this as the size when the building opened in 2017.
Situated on a 51-acre campus at 2500 W Union Hills, the newly completed 550,000-square-foot Phoenix data center
Land: 55 acres
Note: This is the size of the whole campus, which also includes PHX-05.
PHX-01/02/03 Data Center 2500 W Union Hills Drive, Phoenix, AZ 85027 Campus Overview: 55-acre campus
inhabits a 55-acre campus, which also includes the company's nearby Phoenix 05 data center.
Online since: 2017
announced today the opening of its second ultra-efficient, adaptive data center in Phoenix, Arizona.
The Aligned Data Centers - Phoenix 01/02/03 data center was completed in 2017 [...] The tour began with an overview of live data center operations
Location: Phoenix
PHX-01/02/03 Data Center 2500 W Union Hills Drive, Phoenix, AZ 85027 Campus Overview: 55-acre campus
A former DEC factory at 2500 W Union Hills Drive that Aligned converted and opened in May 2017, described as three buildings under one roof.
PHX-01/02/03 Data Center 2500 W Union Hills Drive, Phoenix, AZ 85027 Campus Overview: 55-acre campus
announced today the opening of its second ultra-efficient, adaptive data center in Phoenix, Arizona.
Situated on a 51-acre campus at 2500 W Union Hills, the newly completed 550,000-square-foot Phoenix data center
The building used to be originally a DEC factory for dot matrix printers. There’s three buildings under one roof.
We built it as a brownfield and converted it.
Aligned gave 62 MW of IT power for the first phase and later said a second phase could hold 60 MW at full build-out, and press has said the campus has room for 180 MW.
the newly completed 550,000-square-foot Phoenix data center offers 62MW (megawatt) of IT power for its first phase, expandable up to 120MW at full build.
Situated at 2500 W Union Hills, the addition of Phase II will be able to accommodate 60MW at full build-out.
Aligned’s existing 55-acre Phoenix campus at 2500 W Union Hills Drive has room for 550,000 sq ft of data center and 180MW of capacity.
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
We found no Aligned statement of how much of that is running today, so only the first-phase figure is shown.