Aligned PHX-07 is a data center at 8785 N Reems Rd in Waddell that listing sites show as operating, on the same road as Aligned's PHX-13 campus in Glendale. Aligned lists it on its Phoenix location page, and the listing site datacenterHawk shows it as commissioned.
Operating data center in 8785 N Reems Rd, Waddell. Operated by Aligned.
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-11-13. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: Only one listing site names this building as operating.
Map record 4317: Aligned Phoenix PHX-07 | status Operating
It became operational in 2025.
Capacity: 92 MW
Note: Only one listing site gives this figure.
Map record 4317: Aligned Phoenix PHX-07 | status Operating | capacityMw 92
Online since: 2025
Note: Cleanview gives the year PHX-07 became operational. datacenterHawk and Baxtel give a year built, 2024 and 2026, and Baxtel's own text also says it was expected to become operational in 2025. No source explains the difference.
It became operational in 2025.
Location: 8785 N Reems Rd, Waddell
PHX-07 Data Center 8785 N Reems Rd, Waddell, AZ 85355
PHX-07 is also located along N Reems Road, at 8785, and is due to go live later this year.
At 8785 N Reems Road, the same road as Aligned's PHX-13 at 8805 N Reems Road. The City of Glendale describes Aligned's Glendale campus, where PHX-13 broke ground, as spanning 100 acres.
PHX-07 Data Center 8785 N Reems Rd, Waddell, AZ 85355
PHX-07 is also located along N Reems Road, at 8785, and is due to go live later this year.
Aligned Data Centers · PHX-13 8805 N Reems Road Waddell, AZ
broke ground on its PHX-13 facility on Tuesday, April 15.
The Glendale campus spans 100 acres and represents a significant expansion of Aligned's data center footprint.
Data Center Dynamics reported in April 2025 that PHX-07 was due to go live later that year.
PHX-07 is also located along N Reems Road, at 8785, and is due to go live later this year.
Counted as operating under the rule for buildings whose operator has not announced an in-service date: Aligned lists PHX-07 among its Phoenix-area data centers, the listing site Cleanview lists this building as operating, and no source has been found that says otherwise.
PHX-07 Data Center 8785 N Reems Rd, Waddell, AZ 85355
Map record 4317: Aligned Phoenix PHX-07 | status Operating
It became operational in 2025.
Aligned's location page describes PHX-07 as designed to Tier III standards, with a concrete slab-on-grade and structured steel.
PHX-07 Data Center 8785 N Reems Rd, Waddell, AZ 85355 Campus Overview: Designed to Tier III standards Concrete slab-on-grade and structured steel
Data Center Dynamics reported that Aligned acquired 100 acres at 8785 N Reems Road in December 2024 for $86.5 million from LXP Industrial Trust.
Aligned acquired 100 acres at 8785 N Reems Road in Waddell in December 2024 for $86.5 million from LXP Industrial Trust.
County Assessor records show a December 2024 sale of a parcel of about 99 acres at 8807 N Reems Rd to Aligned Data Centers (Glendale) Propco LLC for $86,522,060.
This is a Commercial parcel located at 8807 N REEMS RD WADDELL, AZ 85355. The current owner is ALIGNED DATA CENTERS (GLENDALE) PROPCO LLC. [...] It was last sold on 12/01/2024 for $86,522,060. [...] Lot Size 4,326,103 sq ft. [...] Last Deed Date 12/13/2024
The listing site datacenterHawk shows PHX-07 as commissioned, with 2024 as the year built.
Commissioned This facility has been commissioned. [...] Year Built 2024
In July 2026, MGX, the Artificial Intelligence Infrastructure Partnership and BlackRock's Global Infrastructure Partners completed their purchase of Aligned Data Centers from funds managed by Macquarie Asset Management, at an enterprise value of about $40 billion.
MGX, the Artificial Intelligence Infrastructure Partnership (AIP), and BlackRock’s Global Infrastructure Partners (GIP), today successfully completed their previously announced acquisition of 100 per cent of the equity in Aligned Data Centers from private infrastructure funds managed by Macquarie Asset Management [...] Aligned’s enterprise value of approximately US$40 billion
has officially completed its acquisition of Aligned Data Centers from infrastructure funds managed by Macquarie Asset Management and its co-investors. The transaction values Aligned at an enterprise value of approximately US$ 40 billion
The listing site Baxtel's page for PHX 07-1 gives the address 8805 N Reems Rd, describes a fully operational facility and lists 2026 as the year built.
8805 N Reems Rd Operational Fully operational facility
Campus: Aligned: Phoenix PHX-07 Campus Short Code: Building 1 Year Built: 2026 Floors: 2
Baxtel's PHX-07 campus page lists four buildings, PHX 07-1 as operational, PHX 07-2 as under construction and PHX 07-3 and PHX 07-4 as planned, with the years 2026, 2026, 2028 and 2029, and describes PHX 07-2 as the second phase, a two-story, 214,078-square-foot facility with six data halls.
Aligned: PHX 07-1 Aligned Operational ░░░░ MW ░░░░░░░ SqFt 2026 Aligned: PHX 07-2 Aligned Under Construction — — 2026 Aligned: PHX 07-3 Aligned Planned — — 2028 Aligned: PHX 07-4 Aligned Planned — — 2029
PHX 07-2 is the second phase of Aligned's PHX07 campus in Phoenix. The two-story, 214,078-square-foot facility spans across six data halls.
Data Center Dynamics quoted a City of Glendale economic development official calling Aligned's April 2025 groundbreaking "building #2" of a 100-acre campus with over 1 million square feet of data hall space.
We celebrated Aligned Data Centers' groundbreaking for building #2 as part of their 100-acre campus with over 1 million sq ft of data hall space,” Loraine German, deputy director at the City of Glendale’s office of economic development, said this week on LinkedIn