Aligned Phoenix PHX-06 Phase 1
Operated by Aligned · 2955 W Innovation St, Chandler
- Capacity
- 36 MW
- Floor area
- 306,000 sq ft
- Online since
- 2025
Capacity: Figure reported in the press. Contractor DP Electric project page, November 2025. The source does not say what the figure measures.
Working here
We do not publish per-facility headcount, because no reliable public figures exist for these sites and construction announcements are not permanent employment. What we can show is real: open Arizona roles at this operator, gathered from their own job board.
Rest of Aligned PHX-06
- Aligned Phoenix PHX-06 Phase 2Proposed · 70 MW
Other Aligned sites in Arizona
- Aligned Peoria CampusProposed
- Aligned Phoenix - Behrend Drive (PHX-08)Proposed · 202 MW
- Aligned Phoenix - Building C1Operating · 16 MW
- Aligned Phoenix PHX-01/02/03Operating · 62 MW for one phase
- Aligned Phoenix PHX-04Operating · 56 MW for one phase
- Aligned Phoenix PHX-05Operating · 39 MW
- Aligned Phoenix PHX-07Operating · 92 MW
- Aligned Phoenix PHX-12Proposed
- Aligned Phoenix PHX-13Proposed · 72 MW
- Aligned Phoenix PHX-14Proposed
More Arizona data centers
How we know this
Compiled from public records and checked on 2026-10-07. Our confidence in this record is medium. Blank figures above mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: Only listing sites name PHX-06 as operational or commissioned.
- [1] Baxtel, Aligned: PHX-06 Data Center (opens in a new tab) · read October 7, 2026
Show quote
Operational with future phases planned
- [2] datacenterHawk, Aligned Data Centers PHX-06 | 2955 W Innovation Street, Phoenix - datacenterHawk (opens in a new tab) · read October 7, 2026
Show quote
Commissioned This facility has been commissioned. Under Construction This facility is speculatively under construction.
- [1] Baxtel, Aligned: PHX-06 Data Center (opens in a new tab) · read October 7, 2026
Capacity: 36 MW
Note: This figure comes from the electrical contractor's project page, not from Aligned.
- [3] DP Electric, PHX06-1 Data Center - DP Electric (opens in a new tab) · November 5, 2025
Show quote
DP Electric was selected as the electrical contractor for the ground-up construction of PHX-06, a 36MW data center located in Chandler, Arizona.
- [3] DP Electric, PHX06-1 Data Center - DP Electric (opens in a new tab) · November 5, 2025
Floor area: 306,000 sq ft
Note: The source gives this as computing space for PHX06 and does not name a phase.
- [4] GrayWolf Industrial (DBM Global), PHX06 - GrayWolf (opens in a new tab) · July 18, 2024
Show quote
Topped out in 2024, with 306,000 square feet of computing space, PHX06 is a recent addition to Aligned’s Southwestern U.S. data center portfolio.
- [4] GrayWolf Industrial (DBM Global), PHX06 - GrayWolf (opens in a new tab) · July 18, 2024
Online since: 2025
Note: A contractor page gives 2025 as the completion date.
- [3] DP Electric, PHX06-1 Data Center - DP Electric (opens in a new tab) · November 5, 2025
Show quote
DP Electric executed the build-out of six data hall fit-outs [...] Holder Construction General Contractor Confidential Owner 2025 Completion Date
- [3] DP Electric, PHX06-1 Data Center - DP Electric (opens in a new tab) · November 5, 2025
Location: 2955 W Innovation St, Chandler
- [5] Aligned Data Centers, Scalable and Adaptive Data Centers in Phoenix, AZ | Aligned (opens in a new tab) · read October 7, 2026
Show quote
PHX-06 Data Center 2955 West Innovation Street Chandler, AZ 85286
- [5] Aligned Data Centers, Scalable and Adaptive Data Centers in Phoenix, AZ | Aligned (opens in a new tab) · read October 7, 2026
At 2955 W Innovation Street, Chandler.
- [5] Aligned Data Centers, Scalable and Adaptive Data Centers in Phoenix, AZ | Aligned (opens in a new tab) · read October 7, 2026
Show quote
PHX-06 Data Center 2955 West Innovation Street Chandler, AZ 85286
- [5] Aligned Data Centers, Scalable and Adaptive Data Centers in Phoenix, AZ | Aligned (opens in a new tab) · read October 7, 2026
The electrical contractor lists a 2025 completion date, reports building out six data halls, and describes PHX-06 as a 36 MW data center.
- [3] DP Electric, PHX06-1 Data Center - DP Electric (opens in a new tab) · November 5, 2025
Show quotes
DP Electric executed the build-out of six data hall fit-outs [...] Holder Construction General Contractor Confidential Owner 2025 Completion Date
DP Electric was selected as the electrical contractor for the ground-up construction of PHX-06, a 36MW data center located in Chandler, Arizona.
- [3] DP Electric, PHX06-1 Data Center - DP Electric (opens in a new tab) · November 5, 2025
Counted as operating under Arizona AI's rule for buildings whose operator has not announced an in-service date: Aligned lists PHX-06 among its Phoenix-area data centers, listing sites list PHX-06 as operational or commissioned, and no source we found says otherwise.
- [5] Aligned Data Centers, Scalable and Adaptive Data Centers in Phoenix, AZ | Aligned (opens in a new tab) · read October 7, 2026
Show quote
PHX-06 Data Center 2955 West Innovation Street Chandler, AZ 85286
- [1] Baxtel, Aligned: PHX-06 Data Center (opens in a new tab) · read October 7, 2026
Show quote
Operational with future phases planned
- [2] datacenterHawk, Aligned Data Centers PHX-06 | 2955 W Innovation Street, Phoenix - datacenterHawk (opens in a new tab) · read October 7, 2026
Show quote
Commissioned This facility has been commissioned. Under Construction This facility is speculatively under construction.
- [5] Aligned Data Centers, Scalable and Adaptive Data Centers in Phoenix, AZ | Aligned (opens in a new tab) · read October 7, 2026
Operator site: https://aligneddc.com/