Aligned Phoenix PHX 06 (full buildout)
Operated by Aligned · Phoenix
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
This record describes part of a larger campus. Its capacity is counted once at campus level in the statewide totals, so it is not added again here.
- Floor area
- 306,000 sq ft
Working here
We do not publish per-facility headcount, because no reliable public figures exist for these sites and construction announcements are not permanent employment. What we can show is real: open Arizona roles at this operator, gathered from their own job board.
Rest of Aligned PHX-06
- Aligned Phoenix PHX-06 Phase 1Operating · 70 MW
Other Aligned sites in Arizona
- Aligned Phoenix - Building C1Operating · 16 MW
- Aligned Phoenix PHX 01/02/03Operating · 180 MW
- Aligned Phoenix PHX-05Operating · 39 MW
More Arizona data centers
Sources and confidence
Compiled from public records and checked on 2026-08-06. Our confidence in this record is medium. Blank figures above mean the number is not publicly established, not that it is zero.
Cleanview also lists Phase 1 as operating at 70 MW. This planned row represents remaining buildout.
Source: cleanview.co
Operator site: https://aligneddc.com/
Something here wrong or out of date? Tell us.