This page tracks every Arizona data center Arizona AI can verify from published sources: what is operating today, what has only been announced, and which operator is behind each site.
Built and operating today
2.1 GW of capacity is operating, added up from the 52 of 56 built facilities that publish a power figure, covering 11.0M sq ft of floor area. Where the figures come from: 21 from operators, 2 from official records, 6 from the press and 23 estimates from a listing site. What they measure: 750 MW computing (IT) load and 1.4 GW not stated by the source. Of the 56 built facilities, 42 publish a floor area.
Announced but not yet built
A further 20.0 GW is announced, added up from the 40 of 62 proposed projects that publish a power figure. Where the figures come from: 8 from operators, 4 from official records, 12 from the press and 16 estimates from a listing site. What they measure: 1.7 GW computing (IT) load, 543 MW power utilities have agreed to supply, 8.5 GW expected electricity demand and 9.2 GW not stated by the source. Planned floor area is 50.6M sq ft, counted from the 30 of 62 projects with a floor area on record. None of it is running. Announced figures are estimates based on what developers and operators have stated in their plans, filings and announcements. Many describe a full build-out years away, and all are subject to change.
Why these numbers differ from the 143 records we track
Arizona AI tracks 143 published records. Each project is counted only once, so not every record adds to the cards above:
- 118 count toward the numbers above.
- 15 are single buildings or phases of a campus that is already counted as a whole.
- 4 are campus summaries whose buildings are counted one by one instead.
- 2 are projects no longer proceeding, listed further down the page.
- 4 have no recent public information, listed further down the page.
Built and announced projects are kept in separate groups and never added together, because an announced project is not power Arizona has yet.
Why data centers are an AI story
The four steps from a chip to an AI answer, and which of them happen in Arizona.
Artificial intelligence is usually described as though it were weightless. It is not. It is a physical industry with four links in its chain, and Arizona holds two of them.
- Chips (Made in Arizona): Silicon is fabricated and packaged. AI runs on specialized processors, and they are among the hardest objects humans manufacture. Arizona makes them: TSMC north of Phoenix and Intel in Chandler are two of the largest semiconductor investments in the country. A finished chip is useless on its own, though. It is a component, and it has to go somewhere. Arizona semiconductor companies
- Data centers (The subject of this page): Power, cooling and fiber at scale. A data center is a building full of computers that run continuously on behalf of other people and companies. AI leans on them heavily: models are trained in buildings like these, and much of what people ask AI services is answered in them too, rather than on the phone or laptop in front of them. What makes them hard to site is electricity, cooling and fiber at the scale that work demands.
- Training (Mostly elsewhere): Building the model, over weeks. Training a model means running tens of thousands of those chips in concert, continuously, for weeks. It is the most power-hungry thing anyone does with a computer, and it is where the very largest facilities earn their electricity bills. Most of it happens outside Arizona today, in places where power is cheaper still. None of that power is generated on site: a data center consumes electricity rather than producing any.
- Answering you (Everywhere, all day): The finished model does its job. Every question anyone asks an AI is answered by a machine in a building like these. Individually it is far smaller work than training, but it never stops, and unlike training it wants to sit physically close to the people asking, because distance is delay. This is the stage where Arizona’s position could change. It has not yet.
The reported capacity figures for the 56 operating facilities we track total about 2.1 GW. This is a capacity estimate, not a measurement of electricity use. Facilities with no reported power figure are excluded from the total. Power, cooling and land use are why a site about Arizona and AI has to count data centers carefully rather than cheer for them. Read about our methodology.
The largest and the newest
Running facilities and announced projects, ranked separately.
Built and operating today
Largest operating facility
Running now, by megawatts
- QTS Phoenix 2 (PHX2) Campus: 210 MW for the whole campus
- CyrusOne Chandler Campus (PHX1-PHX8): 169 MW for the whole campus
- Aligned Phoenix PHX-07: 92 MW
- Google Mesa Building 1: 80 MW
- Vantage Data Centers Phoenix AZ14: 64 MW
Largest operating floor area
Running now, where square footage is reported
- Apple Mesa Global Data Command Center: 1.3M sq ft
- Iron Mountain AZP-1: 588,669 sq ft
- Aligned Phoenix PHX-01/02/03: 550,000 sq ft
- Iron Mountain AZP-2: 530,000 sq ft
- Digital Realty PHX15: 508,000 sq ft
Most recently online
Running now, by year completed
- Edged Phoenix: 2026
- Microsoft PHX-72: 2026
- Aligned Phoenix PHX-06 Phase 1: 2025
- Aligned Phoenix PHX-07: 2025
- Google Mesa Building 1: 2025
Announced but not yet built
Largest proposed project
Announced, by megawatts. None of this is running.
- SpaceX Data Center Campus (Cochise County): 6.0 GW expected demand at full build-out
- Hassayampa Ranch Data Center: 3.5 GW at full build-out
- Tract Buckeye: 1.8 GW at full build-out
- Luckett Road Data Center Campus (Marana): 1.5 GW expected demand at full build-out
- Entrata Data Center (Mohave County): 1.3 GW at full build-out
Largest proposed floor area
Announced, where square footage is reported
- Tract Buckeye: 20.0M sq ft
- SpaceX Data Center Campus (Cochise County): 4.4M sq ft
- QTS Phoenix 4 Campus: 3.2M sq ft
- QTS Phoenix 3 Campus: 3.0M sq ft
- NTT Mesa PH10 (Pacific Proving site): 2.3M sq ft
Largest proposed site
Announced, by land assembled
- Tract Buckeye: 2,069 acres
- Hassayampa Ranch Data Center: 1,687 acres
- Grande Valley Data Center Campus: 954 acres
- Florence Tech Park at Dobson Farms: 780 acres
- Entrata Data Center (Mohave County): 776 acres
Who holds the most, company by company
The lists above rank single facilities. This adds up every facility one company holds in Arizona, which is how an operator with several medium sites can outrank one with a single large site. Ordered by capacity that is operating today. Announced capacity is shown alongside it and is never added to it. Companies that have announced a project but run nothing in Arizona yet sort below the ones that do.
| Operator | Operating sites | Operating capacity | Proposed sites | Announced capacity |
|---|
| Microsoft | 10 | 570 MW | 6 | 333 MW |
| Aligned | 5 | 285 MW | 6 | 343 MW |
| QTS | 1 | 210 MW | 2 | 750 MW |
| CyrusOne | 1 | 169 MW | 1 | 198 MW |
| NTT | 3 | 137 MW | 4 | 36 MW |
| Iron Mountain | 4 | 131 MW | - | - |
| Vantage Data Centers | 4 | 128 MW | 1 | 48 MW |
| Meta | 2 | 96 MW | 3 | 144 MW |
| Google | 1 | 80 MW | 2 | 276 MW |
| Digital Realty | 2 | 66 MW | - | - |
| Apple | 1 | 50 MW | - | - |
| Stream Data Centers | 2 | 40 MW | 1 | - |
| Edged | 1 | 36 MW | - | - |
| EdgeCore | 1 | 26 MW | 3 | - |
| H5 Data Centers | 1 | 26 MW | - | - |
| PayPal | 1 | 16 MW | - | - |
| TECfusions | 1 | 16 MW | - | - |
| Radius Data Centers | 1 | 11 MW | - | - |
| GoDaddy | 1 | 11 MW | - | - |
| Centersquare | 1 | 8 MW | - | - |
| Flexential | 1 | 5.02 MW | - | - |
| EdgeConneX | 1 | 4.50 MW | 1 | 115 MW |
| Expedient | 1 | 3.60 MW | - | - |
| DCX | 1 | 3 MW | - | - |
| ColoBarn | 1 | 2 MW | - | - |
| Comarch | 1 | 2 MW | - | - |
| Ark Data Centers | 1 | 1 MW | - | - |
| Cloudnium | 1 | 0.63 MW | - | - |
| US Signal | 1 | 0.50 MW | - | - |
| 11:11 Systems | 1 | - | - | - |
| American Express | 1 | - | 1 | - |
| Login | 1 | - | - | - |
| Stack Infrastructure | - | - | 2 | 475 MW |
| Amazon Web Services | - | - | 4 | 385 MW |
| Compass Datacenters | - | - | 2 | 320 MW |
| Novva | - | - | 1 | 300 MW |
| Menlo Digital | - | - | 1 | 257 MW |
| Prime Data Centers | - | - | 1 | 240 MW |
| 5C Data Centers | - | - | 1 | 20 MW |
| PhoenixNAP | - | - | 1 | 18 MW |
| US Government | - | - | 1 | - |
A dash means nothing is publicly established, not zero.
Every tracked facility
- SpaceX Data Center Campus (Cochise County)
SpaceX · U.S. Highway 191 at Cochise, next to Apache Generating Station · Pending county approval · 6.0 GW expected demand at full build-out · 4.4M sq ft · 747 acres - Hassayampa Ranch Data Center
Arizona Land Consulting · Tonopah, north of 339th Avenue and Indian School Road · Proposed · 3.5 GW at full build-out · 1,687 acres - Tract Buckeye
Tract · Between Yuma Road and Southern Avenue, Buckeye · Proposed · 1.8 GW at full build-out · 20.0M sq ft · 2,069 acres - Luckett Road Data Center Campus (Marana)
Beale Infrastructure · Luckett Road, Marana · Rezoning approved · 1.5 GW expected demand at full build-out · 600 acres - Entrata Data Center (Mohave County)
Clean Cloud Energy · Near White Hills Airport, east of Highway 93, unincorporated Mohave County (approximate) · Proposed · 1.3 GW at full build-out · 776 acres - Camelback Creek and Balterra (Tonopah film studio and data center campus)
Arizona Land Consulting · Off Interstate 10 at 411th Avenue and Camelback Road, Tonopah · Proposed · 1.0 GW expected demand at full build-out - Vermaland La Osa Energy Center
Vermaland · South of Eloy, Pinal County (approximate) · Original plans denied; may resubmit · 1.0 GW at full build-out · 3,385 acres - QTS Phoenix 3 Campus
QTS · W Camelback Rd, Glendale (Litchfield Park mailing address) · Under construction · 750 MW at full build-out · 3.0M sq ft · 375 acres - Southwest Crossing Data Center
Ryan Companies · Estrella Road and Houser Road, Eloy · Proposed · 400 MW at full build-out · 855,000 sq ft · 122 acres - Novva Mesa Arizona
Novva · Warner Road and Ellsworth Road, Mesa · Planning and Zoning approved · 300 MW at full build-out · 160 acres · Expected 2026 - Project Blue Data Center Campus
Beale Infrastructure · West of Houghton Road, north of the Pima County Fairgrounds (approximate) · Building permits in review · 286 MW utility supply for one phase · 290 acres · Expected 2027 - Phoenix Campus (Menlo Digital)
Menlo Digital · 4801 E Thistle Landing Dr, Phoenix · Under construction · 257 MW utility supply at full build-out · 1.0M sq ft · 38.3 acres - Stack Infrastructure PHX02 Campus
Stack Infrastructure · 800 N 40th St, Phoenix · Under construction · 250 MW at full build-out · 1.7M sq ft · 51 acres - Prime Data Centers PHX01 Campus
Prime Data Centers · 3700 S Avondale Blvd, Avondale · Under construction · 240 MW at full build-out · 1.3M sq ft · 66.5 acres - Stack Infrastructure PHX01 Campus
Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Under construction · 225 MW at full build-out · 100 acres - Compass Datacenters Goodyear Campus
Compass Datacenters · 400 S Bullard Ave, Goodyear · Temporary and final certificates of occupancy issued · 212 MW for the whole campus · 190 acres - QTS Phoenix 2 (PHX2) Campus
QTS · 1200 to 1500 N 40th St, Phoenix · Operating · 210 MW for the whole campus · 80 acres - Aligned Phoenix - Behrend Drive (PHX-08)
Aligned · 3151 and 3202 W Behrend Dr, Phoenix · Proposed · 202 MW - CyrusOne Mesa Data Center Campus
CyrusOne · 3255 S 96th St, Mesa · Under construction · 198 MW at full build-out · 1.4M sq ft · 67 acres - Vantage Data Centers Phoenix (AZ1) Campus
Vantage Data Centers · 45 S Bullard Ave, Goodyear · Operating · 176 MW at full build-out · 50 acres - CyrusOne Chandler Campus (PHX1-PHX8)
CyrusOne · 2305 to 2705 S Ellis St, Chandler · Operating · 169 MW for the whole campus · 85 acres · Online 2012 - Google Mesa Building 3
Google · 3164 S Sossaman Rd, Mesa · Building permit issued · 138 MW · Expected 2027 - Google Mesa Building 2
Google · 3164 S Sossaman Rd, Mesa · Certificate of occupancy issued · 138 MW · 280,000 sq ft · Expected 2026 - EdgeConneX PHX11
EdgeConneX · 3261 S Hawes Rd, Mesa · Under construction · 115 MW at full build-out - Compass Datacenters El Mirage Campus
Compass Datacenters · El Mirage Road and Peoria Avenue, El Mirage · Under construction · 108 MW for the whole campus · 121 acres - Stack PHX01C
Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Proposed · 98 MW - Stack PHX01A
Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Proposed · 98 MW - Stack PHX01B
Stack Infrastructure · 3001 S Litchfield Rd, Avondale · Proposed · 98 MW - AWS PHX065 Pecos Road - Building 2
Amazon Web Services · 10464 E Pecos Rd, Mesa · Building permit issued · 96 MW · 229,416 sq ft - AWS Elliot Road - Building 2
Amazon Web Services · 10437 E Elliot Rd, Mesa · Grading permit issued · 96 MW · 227,000 sq ft · Expected 2028 - AWS PHX065 Pecos Road - Building 1
Amazon Web Services · 10464 E Pecos Rd, Mesa · Under construction · 96 MW · 229,416 sq ft · Expected 2026 - AWS Elliot Road - Building 1
Amazon Web Services · 10437 E Elliot Rd, Mesa · Grading permit issued · 96 MW · 227,000 sq ft · Expected 2028 - Aligned Phoenix PHX-07
Aligned · 8785 N Reems Rd, Waddell · Operating · 92 MW · Online 2025 - Google Mesa Building 1
Google · 7232 E Elliot Rd, Mesa · Operating · 80 MW · 288,530 sq ft · Online 2025 - Aligned Phoenix PHX-13
Aligned · 8805 N Reems Rd, Waddell · Under construction · 72 MW · 445,000 sq ft - Aligned Phoenix PHX-06 Phase 2
Aligned · 2955 W Innovation St, Chandler · Under construction · 70 MW - Stack PHX02C
Stack Infrastructure · 800 N 40th St, Phoenix · Proposed · 65 MW · Expected 2030 - Stack PHX02B
Stack Infrastructure · 800 N 40th St, Phoenix · Proposed · 65 MW · Expected 2029 - Stack PHX02A
Stack Infrastructure · 720 N 40th St, Phoenix · Under construction · 65 MW - Vantage Data Centers Phoenix AZ14
Vantage Data Centers · 155 N Bullard Ave, Goodyear · Operating · 64 MW · 451,600 sq ft · Online 2025 - Aligned Phoenix PHX-01/02/03
Aligned · 2500 W Union Hills Dr, Phoenix · Operating · 62 MW for one phase · 550,000 sq ft · 55 acres · Online 2017 - Microsoft PHX-71
Microsoft · 3785 N Citrus Rd, Goodyear · Operating · 57 MW - Microsoft PHX-12
Microsoft · 14250 W Broadway Rd, Goodyear · Operating · 57 MW · 250,000 sq ft · Online 2024 - Microsoft PHX-83
Microsoft · 12901 W Olive Ave, El Mirage · Under construction · 57 MW · 245,540 sq ft · Expected 2027 - Microsoft PHX-15
Microsoft · 14250 W Broadway Rd, Goodyear · Under construction · 57 MW - Microsoft PHX-82
Microsoft · 12901 W Olive Ave, El Mirage · Under construction · 57 MW · 245,000 sq ft · Expected 2026 - Microsoft PHX-13
Microsoft · 14250 W Broadway Rd, Goodyear · Operating · 57 MW · Online 2025 - Microsoft PHX-11
Microsoft · 14250 W Broadway Rd, Goodyear · Operating · 57 MW · 242,678 sq ft · Online 2023 - Microsoft PHX-80
Microsoft · 12901 W Olive Ave, El Mirage · Operating · 57 MW · 245,000 sq ft · Online 2021 - Microsoft PHX-70
Microsoft · 3785 N Citrus Rd, Goodyear · Operating · 57 MW - Microsoft PHX-81
Microsoft · 12901 W Olive Ave, El Mirage · Operating · 57 MW · 245,000 sq ft · Online 2025 - Microsoft PHX-74
Microsoft · 3785 N Citrus Rd, Goodyear · Proposed · 57 MW · Expected 2028 - Microsoft PHX-73
Microsoft · 3785 N Citrus Rd, Goodyear · Building permit issued · 57 MW · Expected 2027 - Microsoft PHX-10
Microsoft · 14250 W Broadway Rd, Goodyear · Operating · 57 MW · 244,666 sq ft - Microsoft PHX-72
Microsoft · 3785 N Citrus Rd, Goodyear · Operating · 57 MW · Online 2026 - Microsoft PHX-14
Microsoft · 14250 W Broadway Rd, Goodyear · Operating · 57 MW · Online 2025 - Aligned Phoenix PHX-04
Aligned · 2900 W Innovation St, Chandler · Operating · 56 MW for one phase · 396,343 sq ft · 18 acres - NTT Phoenix PH3
NTT · 10256 E Elliot Rd, Mesa · Operating · 50 MW · 235,550 sq ft · Online 2025 - NTT Phoenix PH2
NTT · 10256 E Elliot Rd, Mesa · Operating · 50 MW · 235,550 sq ft · Online 2024 - Apple Mesa Global Data Command Center
Apple · 3740 S Signal Butte Rd, Mesa · Operating · 50 MW · 1.3M sq ft · 83 acres · Online 2017 - Vantage Data Centers Phoenix AZ15
Vantage Data Centers · 155 N Bullard Ave, Goodyear · Building permit issued · 48 MW - Iron Mountain AZP-2
Iron Mountain · 4802 E Van Buren St, Phoenix · Operating · 48 MW · 530,000 sq ft · Online 2019 - Prime Data Centers PHX01 Building 4
Prime Data Centers · 3712 S Avondale Blvd, Avondale · Proposed · 48 MW · 267,000 sq ft - Meta Mesa Building 1
Meta · 3841 S Ellsworth Rd, Mesa · Operating · 48 MW · Online 2025 - Prime Data Centers PHX01 Building 1
Prime Data Centers · 3700 S Avondale Blvd, Avondale · Under construction · 48 MW · 267,000 sq ft - Prime Data Centers PHX01 Building 2
Prime Data Centers · 3700 S Avondale Blvd, Avondale · Under construction · 48 MW · 267,000 sq ft - Meta Mesa Building 2
Meta · 3841 S Ellsworth Rd, Mesa · Operating · 48 MW · Online 2025 - Meta Mesa Building 3
Meta · 3841 S Ellsworth Rd, Mesa · Proposed · 48 MW - Microsoft PHX-16
Microsoft · 14250 W Broadway Rd, Goodyear · Under construction · 48 MW - Prime Data Centers PHX01 Building 3
Prime Data Centers · 3700 S Avondale Blvd, Avondale · Under construction · 48 MW · 267,000 sq ft - Meta Mesa Building 4
Meta · 3841 S Ellsworth Rd, Mesa · Proposed · 48 MW - Meta Mesa Building 5
Meta · 3841 S Ellsworth Rd, Mesa · Proposed · 48 MW - Prime Data Centers PHX01 Building 5
Prime Data Centers · 3716 S Avondale Blvd, Avondale · Proposed · 48 MW · 267,000 sq ft - Iron Mountain AZP-1
Iron Mountain · 615 N 48th St, Phoenix · Operating · 41 MW · 588,669 sq ft - Stream Data Center Phoenix I
Stream Data Centers · 2950 S Litchfield Rd, Goodyear · Operating · 40 MW · 418,000 sq ft · Online 2020 - Aligned Phoenix PHX-05
Aligned · 2500 W Union Hills Dr, Phoenix · Operating · 39 MW · 144,493 sq ft - Iron Mountain AZP-3
Iron Mountain · 5100 E Roosevelt St, Phoenix · Operating · 36 MW · 230,000 sq ft · 10 acres · Online 2025 - Aligned Phoenix PHX-06 Phase 1
Aligned · 2955 W Innovation St, Chandler · Operating · 36 MW · 306,000 sq ft · 17.3 acres · Online 2025 - NTT Phoenix PH1
NTT · 10256 E Elliot Rd, Mesa · Operating · 36 MW · Online 2022 - Edged Phoenix
Edged · 8807 E Warner Rd, Mesa · Operating · 36 MW · 210,000 sq ft · 12 acres · Online 2026 - NTT Phoenix PH4
NTT · 10256 Elliot Rd, Bldg 4, Mesa · Temporary certificate of occupancy · 36 MW · Expected 2026 - Digital Realty PHX15
Digital Realty · 2121 S Price Rd, Chandler · Operating · 34 MW · 508,000 sq ft - Digital Realty PHX10
Digital Realty · 120 E Van Buren St, Phoenix · Operating · 32 MW · 275,000 sq ft - Vantage Data Centers Phoenix AZ13
Vantage Data Centers · 45 S Bullard Ave, Goodyear · Operating · 32 MW · 226,000 sq ft - QTS Phoenix Van Buren
QTS · 120 E Van Buren St, Phoenix · No recent information · 32 MW - EdgeCore Mesa PH01
EdgeCore · 3856 S Everton Ter, Mesa · Operating · 26 MW · 200,880 sq ft - H5 Data Centers Phoenix
H5 Data Centers · 2600 W Germann Rd, Chandler · Operating · 26 MW · 180,000 sq ft - 5C Data Centers PHX01
5C Data Centers · 2802 W Palm Ln, Phoenix · Proposed · 20 MW · 140,000 sq ft - PhoenixNAP PHX02
PhoenixNAP · 3221 E Elwood St, Phoenix · Building permit issued · 18 MW · 530,000 sq ft · Expected 2028 - TECfusions Tucson Data Center
TECfusions · 3701 E Columbia St, Tucson · Operating · 16 MW · 133,450 sq ft - Vantage Data Centers Phoenix AZ11
Vantage Data Centers · 45 S Bullard Ave, Goodyear · Operating · 16 MW · Online 2023 - Vantage Data Centers Phoenix AZ12
Vantage Data Centers · 45 S Bullard Ave, Goodyear · Operating · 16 MW · 230,000 sq ft · Online 2024 - PayPal Phoenix Data Center Campus
PayPal · 4010 N 3rd St, Phoenix · Operating · 16 MW for the whole campus · 184,000 sq ft - Aligned Phoenix - Building C1
Aligned · 2500 W Union Hills Dr, Phoenix · Operating · 16 MW - Csquare PHX1
Centersquare · 615 N 48th St, Phoenix · Operating · 13 MW - Radius Phoenix DC1 (formerly PhoenixNAP PHX01)
Radius Data Centers · 3402 E University Dr, Phoenix · Operating · 11 MW · 151,000 sq ft · Online 2010 - GoDaddy Phoenix Data Center
GoDaddy · 1402 E Buckeye Rd, Phoenix · Operating · 11 MW · 320,000 sq ft - Csquare PHX3
Centersquare · 1301 W University Dr, Mesa · Operating · 8 MW · 154,158 sq ft - Iron Mountain AZS-1
Iron Mountain · 8521 E Princess Dr, Scottsdale · Operating · 5.80 MW · 121,000 sq ft · 4.5 acres - Flexential Phoenix - Deer Valley
Flexential · 1850 W Deer Valley Rd, Phoenix · Operating · 5.02 MW · 109,476 sq ft · Online 2014 - EdgeConneX PHX01
EdgeConneX · 3011 S 52nd St, Tempe · Operating · 4.50 MW · 79,200 sq ft · Online 2014 - Expedient Phoenix
Expedient · 2475 W Townley Ave, Phoenix · Operating · 3.60 MW · 46,000 sq ft · Online 2010 - DCX Goodyear 1
DCX · 16422 W Commerce Dr, Goodyear · Operating · 3 MW · 6 acres · Online 2022 - Comarch Mesa Data Center
Comarch · 3223 S Ellsworth Rd, Mesa · Operating · 2 MW · 32,000 sq ft · 3 acres - ColoBarn Phoenix Data Center
ColoBarn · 8905 S Beck Ave, Tempe · Operating · 2 MW · 28,000 sq ft · 2.3 acres - Ark Data Centers Tucson
Ark Data Centers · 1215 E Pennsylvania St, Tucson · Operating · 1 MW · 38,000 sq ft - Cloudnium Phoenix Data Center (Tempe)
Cloudnium · 1005 W Geneva Dr, Tempe · Operating · 0.63 MW · 15,070 sq ft - US Signal AZ01
US Signal · 1655 W Sunrise Blvd, Gilbert · Operating · 0.50 MW · 14,000 sq ft - Downtown Phoenix Data Center Site (GI Partners)
GI Partners · 621 S 5th Ave, Phoenix · Proposed · 5.4 acres - Meta Mesa Data Center (campus)
Meta · 3841 S Ellsworth Rd, Mesa · Operating · 2.5M sq ft · 396 acres · Online 2025 - Project Eagle (Project Baccara)
Takanock · West of the northwest corner of Litchfield Road and Olive Avenue, near Luke Air Force Base (approximate) · Proposed · 1.1M sq ft · 160 acres · Expected 2028 - Davis-Monthan AFB Data Center
US Government · Davis-Monthan Air Force Base · No award reported as of March 2026 - Microsoft El Mirage Campus
Microsoft · 12901 W Olive Ave, El Mirage · Operating · 151 acres · Online 2021 - Active Infrastructure Chandler Data Center (Price Road)
Active Infrastructure · Price Road industrial corridor, Chandler · Not proceeding · 40 acres - Merit Legacy Technology Park
Merit Partners · North side of East Pecos Road, east of Ellsworth Road · Proposed · 1.0M sq ft · 43 acres - 491st Avenue and Thomas Road Data Center Site (Tonopah)
Not named · Northeast corner of 491st Avenue and Thomas Road, outside Tonopah · Proposed · 2.3M sq ft · 638 acres - Login Tucson Data Center
Login · 1855 N 6th Ave, Tucson · Operating - Microsoft Goodyear Campus (PHX-10 to PHX-16)
Microsoft · 14250 W Broadway Rd, Goodyear · Operating · 279 acres - EdgeCore Mesa Building 4
EdgeCore · 3856 S Everton Ter, Mesa · Proposed - EdgeCore Mesa PH03
EdgeCore · 3856 S Everton Ter, Mesa · Temporary certificate of occupancy · 606,388 sq ft · Expected 2026 - Fortescue Buckeye Data Center
Fortescue · State Route 85 and Patterson Road, Buckeye · Proposed · 158 acres - Frye Data Center Expansion (2500 W. Frye Road)
Lincoln Property Company · 2500 W Frye Rd, Chandler · Proposed · 243,000 sq ft · 14.5 acres - Grande Valley Data Center Campus
LKY Development Company Inc. · South of the Maricopa-Casa Grande Highway and west of Montgomery Road, Casa Grande · Proposed · 954 acres - Aligned Phoenix PHX-12
Aligned · 8805 N Reems Rd, Waddell · Proposed - Aligned Phoenix PHX-14
Aligned · 8805 N Reems Rd, Waddell · Proposed - NTT Phoenix PH5
NTT · 10256 E Elliot Rd, Mesa · Proposed · Expected 2028 - Florence Tech Park at Dobson Farms
Ryan Companies · Southeast corner of Attaway Road and Judd Road, Florence · Proposed · 780 acres - Huntley Page Data Center
Huntley LLC · Near Highway 98, Page (site not final) · Proposed - EdgeCore Mesa PH02
EdgeCore · 3856 S Everton Ter, Mesa · Phased certificate of occupancy · 868,431 sq ft - American Express Phoenix Data Center Expansion
American Express · 19400 N 56th St, Phoenix · Building permit issued · 240,000 sq ft - Charles Schwab Phoenix Data Center
Charles Schwab · 4701 E Francisco Dr, Phoenix · No recent information - EdgeCore Mesa Building 5
EdgeCore · 3856 S Everton Ter, Mesa · Proposed - EdgeCore Mesa North Campus
EdgeCore · 9903 E Elliot Rd, Mesa · Planning and Zoning approved · 1.2M sq ft · 43.8 acres - NTT Mesa PH10 (Pacific Proving site)
NTT · Pecos Road and the Crismon Road alignment, Mesa · Planning and Zoning Board approval reported · 2.3M sq ft · 170 acres · Expected 2028 - American Express Information Processing Center
American Express · 3151 W Behrend Dr, Phoenix · Operating · 300,000 sq ft · 28 acres - NTT Phoenix PH6
NTT · 10256 E Elliot Rd, Mesa · Design review filed · 195,408 sq ft · Expected 2029 - Stream Data Center Phoenix III-VII
Stream Data Centers · 2950 S Litchfield Rd, Goodyear · Building permit issued · 157 acres - QTS Phoenix 4 Campus
QTS · 11753 W Lower Buckeye Rd, Avondale (Tolleson mailing address) · In development · 3.2M sq ft · 206 acres - DataBank Phoenix (3110 N Central, former zColo)
DataBank · 3110 N Central Ave, Phoenix · No recent information - Stream Data Center Phoenix II
Stream Data Centers · 3180 S Litchfield Rd, Goodyear · Operating · 400,000 sq ft - AWS Laveen Data Center
Amazon Web Services · Near Loop 202 and Dobbins Road, Phoenix · No recent information · 220 acres - Aligned Peoria Campus
Aligned · 75th Avenue and Butler Drive, Peoria · Proposed · 916,000 sq ft · 95 acres - 11:11 Systems Scottsdale Data Center
11:11 Systems · 7499 E Paradise Ln, Scottsdale · Operating · 102,400 sq ft
No longer proceeding
These projects were announced and then stopped. They are not counted in either total above.
Previously reported, no recent information
These projects were announced or reported at some point, but we found no recent public information about them. Some may have been abandoned or put on hold. They are not counted in either total above, and each page says when the latest information is from.
Did you know?
- Maricopa County's air quality records list the data center at Apple's Mesa address, 3740 S Signal Butte Road, under the name Platypus Development LLC, with a company address of 1 Infinite Loop in Cupertino. Source: Maricopa County Air Quality Department, facility record F003392. More on the Apple Mesa page.
- A May 2015 SEC filing by the buyer of American Express's Phoenix data center said the building was used to process 100% of the company's global credit card authorizations. Source: Griffin Capital Essential Asset REIT II, prospectus supplement, May 2015. More on the American Express Information Processing Center page.
- The Maricopa County Assessor lists Redale LLC as the owner of the land at the address of Meta's Mesa data center campus. Source: Maricopa County Assessor, parcel 304-31-002V. More on the Meta Mesa Data Center page.
- Google said in December 2023 that it chose to air-cool its Mesa data center after its planning study found the local water source at high risk of depletion and scarcity. Source: Google Cloud, December 2023. More on the Google Mesa Building 1 page.
- Before it was Apple's Mesa data center, the building was a plant that First Solar built and that GT Advanced Technologies, a sapphire glass supplier to Apple, later left, the Arizona Republic reported in 2017. Source: Arizona Republic report in the Arizona Daily Star, January 2017. More on the Apple Mesa page.
- On November 13, 2026, Maricopa County's air quality records listed 31 facilities under the type "Data Centers (>100 MW)". Source: Maricopa County Air Quality Department, facility records.
- Tract said in August 2024 that it anticipated up to 20 million square feet of data center space in as many as 40 data centers on its Buckeye site at full build-out. Source: Greater Phoenix In Business Magazine, August 2024. More on the Tract Buckeye page.
- Apple reported that its Mesa data center used 563 million kilowatt-hours of electricity in its fiscal year 2025. Source: Apple 2026 Environmental Progress Report, page 94. More on the Apple Mesa page.
- An older City of Tempe building permit for 1005 W Geneva Drive, where Cloudnium now offers colocation, describes the project as "NESTLE TEMPE DATA CTR". Source: City of Tempe, building permit BP001525 (open "More Details"). More on the Cloudnium Phoenix Data Center (Tempe) page.
- The City of Mesa's 2019 council item for the development agreement behind Google's data center names the other party as Stone Applications, LLC. Source: City of Mesa, council matter 19-0809, July 2019. More on the Google Mesa Building 1 page.
- TECfusions' Tucson data center is at 3701 E. Columbia Street. Data Center Dynamics reported in 2021 that the building there dates from around 1989 and was previously a Symantec facility. Source: Data Center Dynamics, November 2021. More on the TECfusions Tucson Data Center page.
- The Arizona Corporation Commission voted 5-0 on February 4, 2026 to approve a siting certificate for a proposed 700.2 megawatt natural gas plant near Luke Air Force Base that would power a planned data center complex. Source: Arizona Corporation Commission, February 2026. More on the Project Eagle (Project Baccara) page.
Why you'll see other numbers
Published counts of data centers in Arizona on various other websites run from about 100 to more than 180. Many are online directories that list every site they know of, built or not. Arizona AI counts 56 facilities confirmed running today and 62 proposed projects, and counts a campus once when its operator publishes one figure for it.
- 164 (Phoenix Business Journal, December 2025): Taken from the Data Center Map directory at the end of 2025. Numbers like this are often quoted again later without being updated or checked for what they count: in late October 2026 the same directory listed 172.
- 162 (UNLV Lincy Institute and Brookings Mountain West, March 2026): The number the same directory showed for Arizona on March 6, 2026. The fact sheet does not say how many of these are running.
- 98 operating, 86 planned (Pew Research Center, April 2026): The same directory split by status, as of February 19, 2026. Planned includes sites under construction and land held for future use.
- 113 operating (Cronkite News, September 2026): From a different directory, U.S. Data Center Map, counting the sites it lists as running.
- 182 in all (Cronkite News, October 2026): A directory total that Cronkite News credits to U.S. Data Centers. Cronkite News says 16 of the sites are under construction and 53 are planned.
These figures count different things, so they do not line up with each other or with ours. Every Arizona AI facility page lists the sources for what it says.
How this list is built
Records come from operator announcements, county and municipal filings, utility and regulatory filings, trade press and public project trackers. Records are checked at regular intervals and figures may update as our sources change. Arizona AI is independent and is not affiliated with any operator or with the State of Arizona.
Proposed projects are shown because they are the clearest signal of where Arizona is heading, but an announcement is not a building. They are labeled, kept out of operating totals, and reviewed periodically. A project that is publicly stopped, for example by a county denial, stays listed under “No longer proceeding” with the date and reason, and is taken out of every total. A project we found no recent public information about stays listed too, with the date of the latest information, under “Previously reported, no recent information” and is likewise taken out of every total.
Some operators publish a campus figure and a per-building figure for the same site. Where that happens the capacity is counted once, at one level only, so the totals on this page are lower than the sum of every record shown. Where only per-building figures exist, each building is counted and the campus page is an overview. 19 of 143 published records are excluded from the totals for this reason.
Blank fields mean the figure is not publicly established, not that it is zero. On-site headcount is not shown at all: construction-job announcements are not permanent employment, and no reliable per-facility employment figures exist for these sites. Tenant lists are not shown for the same reason.
Capacity figures come from the operator wherever the operator publishes one. Where it does not, the figure comes from the best other public source, often a data center listing site, and each facility page says which. Listing-site figures often run 20 to 40 percent above what operators state for the same buildings where both exist, and the listing does not say what its numbers measure. The totals above therefore combine figures from operators, official records, the press and listing-site estimates, and some figures measure a utility's supply agreement or expected electricity demand rather than computing load. The note under each total says how many figures come from each kind of source and how much of the total each measure accounts for.
Know a facility that belongs here, or one of these records is wrong? Tell us