Proposed data center in South of the Maricopa-Casa Grande Highway and west of Montgomery Road, Casa Grande. Being developed by LKY Development Company Inc..
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. LKY Development Company Inc. is developing this site rather than operating it, so any long-term operator has not been established here.
Compiled from public records and checked on 2026-10-11. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Approval of the Conditional Use Permit does not authorize construction of the proposed campus.
The City of Casa Grande Planning and Zoning Commission approved a Conditional Use Permit (CUP) for the proposed Grande Valley Data Center campus at its October 1 meeting following a public hearing and consideration of public comment.
Land: 954 acres
The proposed campus would be located on approximately 954 acres generally south of Maricopa-Casa Grande Highway, west of Montgomery Road and east of the Midway Road alignment.
Location: South of the Maricopa-Casa Grande Highway and west of Montgomery Road, Casa Grande
The proposed campus would be located on approximately 954 acres generally south of Maricopa-Casa Grande Highway, west of Montgomery Road and east of the Midway Road alignment.
The City of Casa Grande Planning and Zoning Commission approved a conditional use permit for the proposed Grande Valley Data Center campus on October 1, 2026, by a vote of 6 to 1.
The City of Casa Grande Planning and Zoning Commission approved a Conditional Use Permit (CUP) for the proposed Grande Valley Data Center campus at its October 1 meeting following a public hearing and consideration of public comment.
The Commission voted 6-1 in favor of the CUP approval.
The city says the permit does not authorize construction: the project must still pass building, engineering, fire, utility, environmental and other reviews before construction can begin.
Approval of the Conditional Use Permit does not authorize construction of the proposed campus.
Those requirements may include building, engineering, fire, utility, environmental and other applicable reviews and approvals before construction can begin.
The campus would cover about 954 acres south of the Maricopa-Casa Grande Highway and west of Montgomery Road, with its main power supply generated on site from natural gas, and battery energy storage.
The proposed campus would be located on approximately 954 acres generally south of Maricopa-Casa Grande Highway, west of Montgomery Road and east of the Midway Road alignment.
The primary power supply is proposed to be generated onsite using the adjacent natural gas infrastructure.
The proposed development would include data center facilities along with onsite power generation, accessory battery energy storage, and related electrical and utility infrastructure.
The city says no end user or data center operator has been identified.
No specific end user or data center operator has been identified at this time.
LKY Development Company Inc. owns the land, and a trade report says it was looking for a buyer to take over development.
LKY Development Company Inc. is the owner.
A DATABEX project database update from last month reports LKY is looking for a buyer to purchase the Grande Valley Industrial site and take over development.
According to a press report, the application does not state how many data center buildings there would be or how much power they would use.
The permit application does not disclose a specific cap on the number of data center buildings, how much energy they’ll require, or what’s their primary fuel source.
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Arizona AI shows no power figure or floor area for this project. A listing site shows nine buildings of 133.3 MW each here. Arizona AI found no record that supports those figures.