Proposed data center in Elliot and Ellsworth Roads, Mesa. Operated by Meta.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-08. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: Other listing sites show this building as operating. Meta has not said which buildings run.
Mesa, Arizona Data Center Campus went operational, with two out of five buildings now online
Capacity: 48 MW
Note: Only a listing site gives this figure, and it does not say what it measures.
Map record 3105: Meta Mesa - Building 3 | status Operating | capacityMw 48
Location: Elliot and Ellsworth Roads, Mesa
Meta acquired 396 acres in Mesa on the southeast corner of Elliot and Ellsworth Roads for $123.2 million
A listing site reported on January 29, 2025 that two of the five buildings on Meta's Mesa campus were online.
Mesa, Arizona Data Center Campus went operational, with two out of five buildings now online
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Arizona AI counts this building as one of the three not yet confirmed online, so it stays with the announced projects until Meta or an official record confirms it.