Meta Mesa Building 1

Operated by Meta · Elliot and Ellsworth Roads, Mesa

Capacity
48 MW
Online since
2025

Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.

Working here

We do not publish per-facility headcount, because no reliable public figures exist for these sites and construction announcements are not permanent employment. What we can show is real: open Arizona roles at this operator, gathered from their own job board.

Rest of Meta Mesa campus

More Arizona data centers

See all Arizona data centers

How we know this

Compiled from public records and checked on 2026-10-07. Our confidence in this record is medium. Blank figures above mean the number is not publicly established, not that it is zero.

Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.

  1. Status: Operating

    Note: Meta and KTAR do not number the buildings. Only a listing site names this building as running.

  2. Capacity: 48 MW

    Note: Only a listing site gives this figure, and it does not say what it measures.

  3. Online since: 2025

  4. Location: Elliot and Ellsworth Roads, Mesa

  5. Meta announced on January 30, 2025 that the first two buildings on its Mesa campus were operational, as reported by KTAR.

Our own notes

These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.

Arizona AI counts this building as one of those two.