Operating data center in 45 S Bullard Ave, Goodyear. Operated by Vantage Data Centers.
Capacity: Operator's own figure: computing (IT) load. Vantage announcement, November 2021.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: A trade publication says it was delivered in July 2023. Only a listing site calls it operating.
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
Map record 4112: Vantage AZ11 | status Operating
Capacity: 16 MW
Note: Vantage gave this in 2021 for the first phase, without naming AZ11.
The first phase of development will be comprised of a two-story facility offering 16MW of critical IT capacity
Online since: 2023
Note: A trade publication says the building was delivered in July 2023.
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
Location: 45 S Bullard Ave, Goodyear
45 S Bullard Avenue
AZ13 is the third of five planned data centers at Vantage's AZ1 campus in Goodyear to be constructed and delivered
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
Delivered in July 2023, the first building on the AZ1 campus.
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
AZ13 is the third of five planned data centers at Vantage's AZ1 campus in Goodyear to be constructed and delivered