Operating data center in 45 S Bullard Ave, Goodyear. Operated by Vantage Data Centers.
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: A trade publication says it was delivered in March 2024. Only a listing site calls it operating.
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
Map record 4113: Vantage AZ12 | status Operating
Capacity: 42 MW
Note: Only a listing site gives this figure.
Map record 4113: Vantage AZ12 | status Operating | capacityMw 41.6
Floor area: 230,000 sq ft
Note: A listing site shows 230,000 for this building without stating the unit.
Vantage: AZ12 Vantage Data Centers Operational ░░░░ Request Dataset MW 230,000
Online since: 2024
Note: A trade publication says the building was delivered in March 2024.
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
Location: 45 S Bullard Ave, Goodyear
45 S Bullard Avenue
AZ13 is the third of five planned data centers at Vantage's AZ1 campus in Goodyear to be constructed and delivered
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.
Delivered in March 2024.
The first two, AZ11 and AZ12, were delivered in July 2023 and March 2024, respectively.