Proposed data center in 3856 S Everton Ter, Mesa. Operated by EdgeCore.
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.

Outlined in yellow: the five-parcel EdgeCore Mesa 1 condominium area shared by PH01, PH02 and PH03. It shows the land, not where buildings would go. Parcels: City of Mesa, SUB25-00294, shared EdgeCore condominium area for PH01, PH02 and PH03. Shapes: Maricopa County Assessor (read November 8, 2026).
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-08. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: A listing site calls this building operational. EdgeCore has not confirmed that it is finished.
slated for delivery to the two buildings currently under construction upon their completion in 2025 and 2026.
Floor area: 868,431 sq ft
Note: Only a listing site gives this size.
Building Size: 868,431 sq. ft.
Location: 3856 S Everton Ter, Mesa
3856 S Everton Terrace Operational Fully operational facility
already available at EdgeCore's first Mesa campus for its operational data center
The second building on EdgeCore's Mesa campus.
the second (PH02) and third (PH03) data centers currently under construction have been awarded Designed to Earn ENERGY STAR certifications.
EdgeCore's first Mesa campus for its operational data center and is slated for delivery to the two buildings currently under construction
EdgeCore said in May 2025 it was under construction for completion in 2025 or 2026.
the two buildings currently under construction upon their completion in 2025 and 2026.
the second (PH02) and third (PH03) data centers currently under construction have been awarded Designed to Earn ENERGY STAR certifications.
In January 2024 EdgeCore said its campus had one operational data center and two more under construction totaling 206 MW of critical load capacity, with no figure per building.
The campus currently has one operational data center and two additional data centers under construction totaling 206 MW of critical load capacity.
A listing site lists this building as running, but EdgeCore has not confirmed it, so it stays with the announced projects.
3856 S Everton Terrace Operational Fully operational facility