EdgeCore's website says its Mesa campus has five data centers, and Mesa's plat covers only PH01 to PH03. No city record names a Building 5. North of them the city shows two planned buildings but has not said which names they carry.
Proposed data center in 3856 S Everton Ter, Mesa. Operated by EdgeCore.
No city record read names a Building 5, and Mesa's March 2026 staff report shows two planned data center buildings of 618,480 square feet each on the site that EdgeCore pairs with its existing campus immediately to the south. Bisnow reported that the Planning and Zoning Board approved that plan on March 11, 2026, after EdgeCore cut it from 2.1 million to 1.2 million square feet. The only building permit record for the site in Mesa's open data is for a new 225,245 square foot warehouse labeled Building A.
This record describes part of a larger campus. Its capacity is counted once at campus level in the statewide totals, so it is not added again here.

Outlined in yellow: EdgeCore's campus block at 3856 S Everton Ter; the building's own spot is not yet published. It shows the land, not where buildings would go. Parcels: Maricopa County Assessor, Parcels 304-31-955, 304-31-956, 304-31-957, 304-31-959. Shapes: Maricopa County Assessor (read November 7, 2026).
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-11-13. Confidence in this record: low. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: EdgeCore has not said whether work on this building has started.
The five-building campus is engineered to meet the power density requirements of the most demanding cloud and AI workloads.
The campus currently has one operational data center and two additional data centers under construction
Location: 3856 S Everton Ter, Mesa
MECP1 MESA 1 LLC | 3856 S EVERTON TER MESA 85212
"property_address":"3856 S EVERTON TERR" [...] within existing Edgecore PH02 building
"property_address":"3856 S EVERTON TERR" [...] at existing EdgeCore PH01 facility.
No city record read names a Building 5, and Mesa's March 2026 staff report shows two planned data center buildings of 618,480 square feet each on the site that EdgeCore pairs with its existing campus immediately to the south.
The site plan shows three 216-foot-wide buildings labeled PH04, PH05 and PH06, which comprise the large rectangular data center spaces.
The site plan includes two 618,480 square foot multi-storied data center buildings totaling 1,236,960 square feet
has chosen the Property, together with its existing campus immediately to the south, to be its flagship data center campus.
Bisnow reported that the Planning and Zoning Board approved that plan on March 11, 2026, after EdgeCore cut it from 2.1 million to 1.2 million square feet.
EdgeCore gained approval from Mesa’s planning and zoning board on March 11 to build out a data center site in the city
The green light comes after the Denver-based developer agreed to shrink its proposed center from 2.1M SF to 1.2M SF. The project will now go before the Mesa City Council.
The site plan includes two 618,480 square foot multi-storied data center buildings totaling 1,236,960 square feet located on the northern portion of the site directly adjacent to Elliot Road and between Eastmark Parkway and Everton Terrace.
The only building permit record for the site in Mesa's open data is for a new 225,245 square foot warehouse labeled Building A.
"property_address":"9903 E ELLIOT RD" [...] (3 BUILIDINGS) Building A and site improvements. New 225,245sf warehouse building with concrete tilt-up panel walls. [...] "parcel_number":"30431002Q"
EdgeCore describes its first Mesa campus as a five-building campus.
The five-building campus is engineered to meet the power density requirements of the most demanding cloud and AI workloads.
The address is the Maricopa County Assessor's address for the campus parcels on South Everton Terrace, where Mesa permits name EdgeCore PH01 and PH02; this building's own address is not yet published.
MECP1 MESA 1 LLC | 3856 S EVERTON TER MESA 85212
"property_address":"3856 S EVERTON TERR" [...] within existing Edgecore PH02 building
"property_address":"3856 S EVERTON TERR" [...] at existing EdgeCore PH01 facility.
Mesa's four-unit EdgeCore PH01, PH02, and PH03 Industrial Condo plat covers three buildings and an electric substation.
The four units proposed correspond with the three buildings and the electric sub-station shown on the approved site plan.
"EdgeCore PH01, PH02, and PH03 Industrial Condo"
EdgeCore's website lists 5 data centers in its campus details, so two are not on that plat.
The four units proposed correspond with the three buildings and the electric sub-station shown on the approved site plan.
"EdgeCore PH01, PH02, and PH03 Industrial Condo"
Campus details 84 Acres 5 Data Centers 496 MW Critical IT Load 2.7M Total Building Sq. Ft.
Mesa's March 2026 staff report places two planned data center buildings of 618,480 square feet each on a site directly adjacent to Elliot Road, which EdgeCore's application pairs with its existing campus immediately to the south as its flagship campus.
The site plan shows three 216-foot-wide buildings labeled PH04, PH05 and PH06, which comprise the large rectangular data center spaces.
The site plan includes two 618,480 square foot multi-storied data center buildings totaling 1,236,960 square feet
has chosen the Property, together with its existing campus immediately to the south, to be its flagship data center campus.
The city's 2024 staff report for that site labeled three buildings PH04, PH05 and PH06.
The site plan shows three 216-foot-wide buildings labeled PH04, PH05 and PH06, which comprise the large rectangular data center spaces.
The site plan includes two 618,480 square foot multi-storied data center buildings totaling 1,236,960 square feet
The city has not said which names the two remaining buildings carry, and no record ties either of them to this building.
The site plan shows three 216-foot-wide buildings labeled PH04, PH05 and PH06, which comprise the large rectangular data center spaces.
The site plan includes two 618,480 square foot multi-storied data center buildings totaling 1,236,960 square feet
The only building permit record for the site in Mesa's open data is for a new 225,245 square foot warehouse labeled Building A.
"property_address":"9903 E ELLIOT RD" [...] (3 BUILIDINGS) Building A and site improvements. New 225,245sf warehouse building with concrete tilt-up panel walls. [...] "parcel_number":"30431002Q"
EdgeCore said in its May 20, 2025 release that the newly bought land would let it deliver another 250+ MW of data center space in Mesa, a company figure for the new land as a whole that does not say what each building would hold.
we have worked quickly to construct and commission 206 MW at the site. This new tranche of land enables us to deliver another 250+ MW of data center space in Mesa to fulfill our hyperscale customers' urgent need for AI and cloud-ready capacity.
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Public names were found for three of the buildings (PH01 to PH03), and the other two are listed separately. This record is the fifth. No name, size, capacity or date was found for it.