EdgeCore Mesa Building 5
Operated by EdgeCore · Mesa
This is a proposed or under-construction project. It is not operating capacity, and announced projects do sometimes change scope or fail to proceed.
Rest of EdgeCore Mesa campus
- EdgeCore Mesa Building 4Proposed
- EdgeCore Mesa PH01Operating · 26 MW
- EdgeCore Mesa PH02Proposed
- EdgeCore Mesa PH03Proposed
Other EdgeCore sites in Arizona
- EdgeCore Mesa North CampusProposed
More Arizona data centers
How we know this
Compiled from public records and checked on 2026-10-08. Our confidence in this record is low. Blank figures above mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Proposed
Note: EdgeCore has not said whether work on this building has started.
- [1] EdgeCore Digital Infrastructure, Phoenix Data Centers | EdgeCore (opens in a new tab) · read October 8, 2026
Show quote
The five-building campus is engineered to meet the power density requirements of the most demanding cloud and AI workloads.
- [2] EdgeCore Digital Infrastructure, EdgeCore Digital Infrastructure Completes $1.9 Billion Debt Financing to Enable Continued Growth and Development of its Flagship Data Center Campus in Greater Phoenix (opens in a new tab) · January 4, 2024
Show quote
The campus currently has one operational data center and two additional data centers under construction
- [1] EdgeCore Digital Infrastructure, Phoenix Data Centers | EdgeCore (opens in a new tab) · read October 8, 2026
Location: Mesa
- [1] EdgeCore Digital Infrastructure, Phoenix Data Centers | EdgeCore (opens in a new tab) · read October 7, 2026
Show quote
EdgeCore's Phoenix data center campus in Mesa
- [1] EdgeCore Digital Infrastructure, Phoenix Data Centers | EdgeCore (opens in a new tab) · read October 7, 2026
EdgeCore describes its first Mesa campus as a five-building campus.
- [1] EdgeCore Digital Infrastructure, Phoenix Data Centers | EdgeCore (opens in a new tab) · read October 8, 2026
Show quote
The five-building campus is engineered to meet the power density requirements of the most demanding cloud and AI workloads.
- [1] EdgeCore Digital Infrastructure, Phoenix Data Centers | EdgeCore (opens in a new tab) · read October 8, 2026
Our own notes
These remarks are Arizona AI's own. They say how this record is counted or what we could not find, so there is no outside page to link.
Arizona AI found public names for three of the buildings (PH01 to PH03) and lists the other two separately. This record is the fifth. We found no name, size, capacity or date for it.
Something here wrong or out of date? Tell us.