Operating data center in 3856 S Everton Ter, Mesa. Operated by EdgeCore.

Outlined in yellow: the five-parcel EdgeCore Mesa 1 condominium area shared by PH01, PH02 and PH03. It shows the land, not where buildings would go. Parcels: City of Mesa, SUB25-00294, shared EdgeCore condominium area for PH01, PH02 and PH03. Shapes: Maricopa County Assessor (read November 8, 2026).
Capacity: Operator's own figure: computing (IT) load. EdgeCore.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Compiled from public records and checked on 2026-10-07. Confidence in this record: high. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
PH01 data center, which is comprised of 26 MW of IT capacity and is fully leased to a single hyperscale tenant.
already available at EdgeCore's first Mesa campus for its operational data center
3856 S Everton Terrace Operational Fully operational facility [...] Campus: EdgeCore: Phoenix Mesa Campus
Capacity: 26 MW
PH01 data center, which is comprised of 26 MW of IT capacity and is fully leased to a single hyperscale tenant.
Floor area: 200,880 sq ft
Note: Only the listing site Baxtel gives this size.
The first data hall (PH01) was completed in 2019, encompassing 200,880 square feet
Location: 3856 S Everton Ter, Mesa
already available at EdgeCore's first Mesa campus for its operational data center
3856 S Everton Terrace Operational Fully operational facility [...] Campus: EdgeCore: Phoenix Mesa Campus
The first building on EdgeCore's Mesa campus, fully leased to a single hyperscale tenant as of July 2025.
PH01 data center, which is comprised of 26 MW of IT capacity and is fully leased to a single hyperscale tenant.
The first data hall (PH01) was completed in 2019, encompassing 200,880 square feet
3856 S Everton Terrace Operational Fully operational facility [...] Campus: EdgeCore: Phoenix Mesa Campus
EdgeCore said in January 2024 that its campus had one operational data center and two more under construction, totaling 206 MW of critical load capacity.
The campus currently has one operational data center and two additional data centers under construction totaling 206 MW of critical load capacity.