Microsoft PHX-70 is a Microsoft data center building at 3785 N Citrus Rd in Goodyear, on land Microsoft bought in 2019. City of Goodyear records read November 12, 2026 list its shell and all five fit-out permits as CO or Final Inspection.
Operating data center in 3785 N Citrus Rd, Goodyear. Operated by Microsoft.

Outlined in yellow: Microsoft's parcel at 3785 N Citrus Rd, the PHX70 site where the city's permits place PHX-70. It shows the land, not where buildings would go. Parcels: Maricopa County Assessor, Parcel 502-30-934, 3785 N Citrus Rd, Goodyear (owner Microsoft Corporation, subdivision PHX70 PV303). Shapes: Maricopa County Assessor (read November 7, 2026).
Capacity: Estimate from a data center listing site. Cleanview project map, read October 7, 2026. By November 2026 Cleanview no longer showed building figures publicly, and no other public source gives one for this building. The listing does not say what the figure measures.
Per-facility headcount is not published here: no reliable public figures exist for these sites, and construction announcements are not permanent employment. Open Arizona roles at this operator, where there are any, are listed on the operator's company page.
Stories in Arizona AI's news feed that name this facility, newest first.
Compiled from public records and checked on 2026-11-13. Confidence in this record: medium. Blank figures mean the number is not publicly established, not that it is zero.
Each statement on this page is listed with the page it came from and the words that say it. Sources open in a new tab.
Status: Operating
Note: Only listing sites name this building as running.
Map record 3523: Microsoft PHX-70 | status Operating
Goodyear, AZ 85395, USA Operational Fully operational facility
Microsoft PHX-70 is a data center located in Maricopa County, Arizona. It became operational in 2021.
Capacity: 57 MW
Note: Only the Cleanview listing site gives this figure.
Map record 3523: Microsoft PHX-70 | status Operating | capacityMw 57
Location: 3785 N Citrus Rd, Goodyear
PHX70-PV303 Project located at the southeast corner of Indian School and Citrus Roads.
Site Address 3785 N CITRUS RD BLDG PHX70 Goodyear AZ 85395
This is a Commercial parcel located at 3785 N CITRUS RD GOODYEAR, AZ 85395. The current owner is MICROSOFT CORPORATION. It is located in the PHX70 PV303 subdivision
Counted as operating under the rule for buildings whose operator has not announced an in-service date: Microsoft says it operates data centers in Goodyear, listing sites list this building as running, and no available source says otherwise.
Microsoft operates datacenters and is building new facilities in El Mirage and Goodyear, part of the greater Phoenix area.
Map record 3523: Microsoft PHX-70 | status Operating
Goodyear, AZ 85395, USA Operational Fully operational facility
At the southeast corner of Indian School and Citrus Roads, Goodyear, under development agreements approved by the Goodyear City Council in 2019 and 2020 and amended in 2021.
"VotePersonName":"Bill Stipp","VoteValueId":20,"VoteValueName":"Excused"
Microsoft is requesting to receive permits, including a building permit, prior to the approval and recordation of a final plat and prior to the final determination of the water and wastewater requirements.
The City is willing to allow Microsoft to move forward with the construction of its first building and associated on-site engineering work under a self-certification process
APPROVE THE 2020 DEVELOPMENT AGREEMENT FOR PHX 70 ALLOWING FOR A DELAY IN THE COMPLETION OF THE OFFSITE ROADWAY INFRASTRUCTURE REQUIREMENT FOR THE PHX 70 SITE
"MatterHistoryActionDate":"2020-04-13T00:00:00","MatterHistoryActionId":363,"MatterHistoryActionName":"ADOPTED"
"VotePersonName":"Laura Kaino","VoteValueId":16,"VoteValueName":"Aye"
will allow Microsoft to obtain a certificate of occupancy so it can begin operating while ensuring all life-safety requirements will be completed
Under the terms of this Amendment, Microsoft would be allowed to pull a permit for the second building of the project upon the recording of the final plat and the actual commencement of construction for roadway construction for Indian School Road adjacent to the property.
to APPROVE Consent Agenda Items 2 through 14. [...] The motion carried by the following vote: AYE: Mayor Georgia Lord , Vice Mayor Bill Stipp [...] Passed - Unanimously
12. APPROVE THE FIRST AMENDMENT TO THE 2020 DEVELOPMENT AGREEMENT FOR PHX 70
The Goodyear City Council approved the 2019 PHX 70 development agreement on May 6, 2019 by a 6-0 vote with one member excused, and the staff report says Microsoft was requesting permits, including a building permit, before a final plat was recorded and before its water and wastewater requirements were settled, and that the city was willing to let construction of the first building move forward under a self-certification process.
"VotePersonName":"Bill Stipp","VoteValueId":20,"VoteValueName":"Excused"
Microsoft is requesting to receive permits, including a building permit, prior to the approval and recordation of a final plat and prior to the final determination of the water and wastewater requirements.
The City is willing to allow Microsoft to move forward with the construction of its first building and associated on-site engineering work under a self-certification process
The same 2019 staff report says Microsoft's site covers about 145 acres south of Indian School Road and east of Citrus Road, zoned I-1 Light Industrial within the PV 303 Planned Area Development, and that Phase 1 for the first building covers 80 of the 145 acres.
The property is located within the PV 303 Planned Area Development and has an underlying zoning designation of I-1, Light Industrial.
Phase 1 of the development for the first building consists of 80 of the 145 acres.
The 2019 staff report says the site is outside the City of Goodyear's own water and wastewater service area and that the city would be receiving concurrence from EPCOR Utilities (water) and Liberty Utilities (wastewater) that they were working with Microsoft to provide service.
The property is not located within the City’s service area for water and wastewater services.
The city of Goodyear will be receiving concurrence from the water (EPCOR Utilities) and wastewater (Liberty Utilities) services providers that they are in agreement and are working with Microsoft to provide the necessary services.
The 2020 staff report says the offsite road work took longer than expected because new Maricopa Water District facilities had to be built before existing ones in the future road right-of-way could be abandoned, and the 2020 agreement also cites the need for Arizona Public Service to relocate existing power lines.
Due to various complexities related to the construction of new MWD Facilities prior to abandoning existing facilities that are located in the future city rights-of-way, development of the offsite improvements has taken longer than anticipated.
the need for Arizona Public Service to relocate existing power lines so that the required road improvements can be constructed
Under the 2020 agreement Microsoft had to fund an escrow equal to 110 percent of the cost of the half-street improvements on Citrus Road and Indian School Road along the property (including landscaping, utility relocation and landscaping outside the perimeter wall), and make in-lieu payments that include one fourth of the cost of a traffic signal at Indian School and Citrus Roads.
The amount of the escrow is to be 110% of the cost of
the full half-street improvements for the section of Citrus Road along and adjacent to the western boundary of the Property [...] the full half-street improvements for the section of Indian School Road along and adjacent to the northern boundary of the Property [...] (iii) all required landscaping improvements that are to be installed on the Property outside the perimeter wall
One fourth (1/4th) of the cost of a Full Traffic Signal at the intersection of Indian School and Citrus Road;
The final plat for PHX 70 - PV303 submitted to the City Council on May 24, 2021 lists Lot 1 at 131.334 acres, Lot 2 at 10.331 acres and 3.251 acres dedicated as right-of-way, and names EPCOR Water for water and APS for power.
LOT 1 5,720,936 131.334 LOT 2 450,000 10.331 R/W DEDICATED 141,598 3.251
THE IS PLAT IS LOCATED IN THE SERVICE AREA OF EPCOR WATER AND HAS BEEN GRANTED A CERTIFICATE OF ASSURED WATER SUPPLY FOR THE ARIZONA DEPARTMENT OF WATER RESOURCES.
POWER APS CONTACT: SUPERVISOR ON DUTY
Reports of the 2019 land price differ: the Arizona Republic, as republished by Rose Law Group Reporter in April 2019, reported $37 million for about 147 acres, while Connect CRE, citing the Phoenix Business Journal, reported in June 2026 that the 2019 purchase was 150 acres for $39 million.
The Washington-based tech giant bought about 147 acres of Goodyear land on the southeast corner of Indian School and Citrus roads near Loop 303, according to documents with the Maricopa County recorder’s and assessor’s offices.
Microsoft Corporation bought the land from DRI FR Goodyear LLC, documents show.
Microsoft spent over $130 million for a 100-acre site in Goodyear. The Phoenix Business Journal reports the property, owned by Industrial Realty Trust, is adjacent to an additional 150 acres the company bought back in 2019 for $39 million.
Two are in Goodyear. The first, where it recently purchased land, is at Citrus and Indian School Roads, and the other just south of Goodyear Airpark.
Connect CRE reported on June 8, 2026, citing the Phoenix Business Journal, that Microsoft spent over $130 million for a 100-acre site owned by Industrial Realty Trust next to the land it bought in 2019 at Citrus and Indian School Roads.
Microsoft spent over $130 million for a 100-acre site in Goodyear. The Phoenix Business Journal reports the property, owned by Industrial Realty Trust, is adjacent to an additional 150 acres the company bought back in 2019 for $39 million.
Two are in Goodyear. The first, where it recently purchased land, is at Citrus and Indian School Roads, and the other just south of Goodyear Airpark.
City of Goodyear permit records read November 12, 2026 show all five PHX 70 fit-out permits, for the admin area with COLO 1 (B19-03815) and for COLO 2 to COLO 5 (B20-02351, B20-02912, B20-02913, B20-02914), with the status CO or Final Inspection.
Record B19-03815: Commercial Construction : Record Status: CO or Final Inspection
Detailed Scope of Work: SELF CERTIFICATION /VERTICAL BUILD/ADMIN & COLO 1 - PHX 70 - VERTICAL BLDG / ADMIN & COLO 1
Record B20-02351: Commercial Construction : Record Status: CO or Final Inspection
Detailed Scope of Work: PHX 70 - COLO 5 BUILDING FIT OUT - PHX 70 - COLO 5 BUILDING FIT OUT
B20-02912 | MICROSOFT PHX 70 DATACTR | CO or Final Inspection [...] B20-02913 | MICROSOFT PHX 70 DATACTR | CO or Final Inspection [...] B20-02914 | MICROSOFT PHX 70 DATACTR | CO or Final Inspection
The City of Goodyear's permit map layer lists the PHX 70 admin and COLO 1 permit at 264,000 square feet and each of the COLO 2 to COLO 5 fit-outs at about 45,000 square feet, all with the status Complete.
"PermitId":"B19-03815","ProjectName":"MICROSOFT PHX 70 DATACTR","JobDescription":"Tenant Improvement","JobSquareFeet":264000,"PermitValue":250000000,"StatusDescription":"Complete"
"PermitId":"B20-02351","ProjectName":"MICROSOFT PHX 70 DATACTR","JobDescription":"Tenant Improvement","JobSquareFeet":45077,"PermitValue":25000000,"StatusDescription":"Complete"
"PermitId":"B20-02912","ProjectName":"MICROSOFT PHX 70 DATACTR","JobDescription":"Tenant Improvement","JobSquareFeet":45194 [...] "StatusDescription":"Complete" [...] "PermitId":"B20-02913" [...] "JobSquareFeet":45077 [...] "StatusDescription":"Complete" [...] "PermitId":"B20-02914" [...] "JobSquareFeet":45353,"PermitValue":0,"StatusDescription":"Complete"
Maricopa County's air quality facility records list "Microsoft Corp - Citrus Rd" at 3785 N Citrus Rd, parcel 502-30-934, under synthetic minor permit P0012837, in the category "Data Centers (>100 MW)" with the description "538 MW generating capacity data center".
'facility_nm': 'Microsoft Corp - Citrus Rd', 'address1': '3785 N Citrus Rd', 'parcel_no': '502-30-934', 'facility_type_dsc': 'Data Centers (>100 MW)', 'facility_desc': '538 MW generating capacity data center.', 'permit_nbr': 'P0012837'
'permit_classification_dsc': 'Synthetic Minor', 'operating_status_dsc': 'Operating'
Microsoft says, for all of its Arizona data centers, that existing facilities use direct evaporative cooling that uses water for cooling less than 40 percent of the year, that future facilities will use air-cooled chillers, and that it buys water in Arizona from EPCOR and the City of Goodyear.
Our existing facilities are cooled using direct evaporative cooling (DEC). DEC uses water for cooling less than 40% of the year. Future facilities will use air-cooled chillers.
In Arizona, Microsoft purchases water from EPCOR and the City of Goodyear.
Microsoft says its data centers in El Mirage and Goodyear together employed about 430 people as of 2025, and that building its new Arizona data centers will take about 8.4 million work hours and more than 2,050 jobs at peak.
As of 2025, these facilities currently employ approximately 430 people.
We expect construction of the new datacenters to require approximately 8.4 million work hours and more than 2,050 jobs at peak activity.
Microsoft's 2026 environmental data fact sheet reports that all of its Phoenix-area data centers combined used 954,206 MWh of electricity and withdrew 981 megaliters of water in fiscal 2025, with 2,675 megaliters of water replenishment.
Electricity consumption (MWh) Water withdrawal2 (ML) [...] Water replenishment6 (ML) [...] Phoenix (AZ) United States of America 954,206 981 392 2,675
City of Goodyear permit records read November 12, 2026 show the other Microsoft buildings at 3785 N Citrus Rd at these stages: PHX71 at TCO (temporary certificate of occupancy) on its shell and six fit-out permits, PHX72 at TCO on its shell, admin area, COLO 1 and COLO 2 and at Permit Issued on COLO 3 to COLO 5, PHX73 at Permit Issued on its shell and six fit-out permits opened in April 2026, and PHX74 with its shell and six fit-out applications not issued.
Record B21-00671: Industrial Construction : Record Status: TCO
Detailed Scope of Work: PHX 71 DATA CENTER - SHELL Subtype: Other New Construction (Not listed above) Other New Construction: DATA CTR SHELL
02/09/2021 | B21-00671 | Industrial Construction | New - Other New Construction (Not listed above) - DATA CTR SHELL | PHX71 DATACTR | 3785 N CITRUS RD, BLDG PHX71, Goodyear AZ 85395, 1 PHX71 | TCO
02/24/2021 | B21-01013 | Commercial Construction | Tenant Improvement | PHX71 DATACTR - ADMIN | 3785 N CITRUS RD, BLDG PHX71, Goodyear AZ 85395, 1 PHX71 | TCO
12/12/2022 | B22-06148 | Commercial Construction | Tenant Improvement - PHX71 - COLO 5 | PHX71 DATACTR - COLO 5 | 3785 N CITRUS RD, BLDG PHX71, Goodyear AZ 85395, 1 PHX71 | TCO
06/21/2023 | B23-02617 | Industrial Construction | New - Warehouse | PHX72 SHELL | 3785 N CITRUS RD, BLDG PHX 72, Goodyear AZ 85395, 1 PHX72 | TCO
08/09/2023 | B23-03361 | Commercial Construction | Tenant Improvement | PHX72 COLO 5 | 3785 N CITRUS RD, BLDG PHX 72, Goodyear AZ 85395, 1 PHX72 | Permit Issued
04/22/2026 | B26-01057 | Industrial Construction | New - Warehouse - Data Center | PHX73 - SHELL - WH - IND (E26-00599) | 3785 N CITRUS RD, BLDG PHX73, GOODYEAR AZ 85395, 1 PHX73 | Permit Issued
04/23/2026 | B26-01076 | Industrial Construction | Tenant Improvement | PHX73 - COLO 5 - TI | 3785 N CITRUS RD, BLDG PHX73, GOODYEAR AZ 85395, 1 PHX73 | Permit Issued
02/05/2024 | B24-00456 | Industrial Construction | New - Warehouse | PHX74 SHELL | 3785 N CITRUS RD, BLDG PHX74, Goodyear AZ 85395, 1 PHX74 | Respond and Resubmit
B21-01015 | PHX71 DATACTR - COLO 2 - TI | TCO [...] B21-01016 | PHX71 DATACTR - COLO 3 | TCO [...] B23-03360 | PHX72 COLO 4 | Permit Issued [...] B26-01072 | PHX73 - COLO 1 - TI | Permit Issued [...] B26-01073 | PHX73 - COLO 2 - TI | Permit Issued [...] B26-01074 | PHX73 - COLO 3 - TI | Permit Issued [...] B26-01075 | PHX73 - COLO 4 - TI | Permit Issued
B24-03746 | PHX74 COLO 1 | Department Review Cycle 1 [...] B24-03747 | PHX74 COLO 2 | Department Review Cycle 1 [...] B24-03748 | PHX74 COLO 3 | Department Review Cycle 1 [...] B24-03749 | PHX74 COLO 4 | Department Review Cycle 1 [...] B24-03750 | PHX74 COLO 5 | Department Review Cycle 1
Record B21-01014: Commercial Construction : Record Status: TCO
Record B21-01017: Commercial Construction : Record Status: TCO
Record B22-06148: Commercial Construction : Record Status: TCO
Record B23-02617: Industrial Construction : Record Status: TCO
Detailed Scope of Work: PHX72 DATACENTER SHELL Subtype: Warehouse
Record B23-03356: Commercial Construction : Record Status: TCO
Record B23-03357: Commercial Construction : Record Status: TCO
Record B23-03358: Commercial Construction : Record Status: TCO
Record B23-03359: Commercial Construction : Record Status: Permit Issued
connected to the existing onsite substation operated by Arizona Public Service.
PHX73 will use air-cooled chillers (ACCs) which do not require water to operate. No offsite construction is proposed for the PHX73 Project.
Record B26-01071: Industrial Construction : Record Status: Permit Issued
Detailed Scope of Work: PHX73 COLO 1, reviewed and approved under B26-01057
Record B24-00456: Industrial Construction : Record Status: Respond and Resubmit
Record B24-03745: Industrial Construction : Record Status: Department Review Cycle 1