Microsoft in Arizona

By Arizona AI · Profile reviewed · 87 sourced facts

At a glance

Microsoft, based in Redmond, Washington, runs West US 3, its Azure cloud region in Arizona, from data centers it owns in Goodyear and El Mirage. Microsoft's West US 3 region went live on June 15, 2021, and Microsoft says its Arizona data centers employ about 430 people and are still expanding. Microsoft has kept buying West Valley land, including $258 million for about 283 acres in El Mirage in May 2024 and $131 million for 100 acres beside its Citrus Road campus in Goodyear in 2026.

Key facts

Arizona locations (3)
Headquarters
Redmond, Washington
Ownership
Public company
Nasdaq: MSFT
Website
microsoft.com

Sources: City of Goodyear: City of Goodyear building permit B22-03104 (PHX12 shell), City of Goodyear: City of Goodyear building permit B19-03814 (PHX70 shell), City of El Mirage, U.S. Securities and Exchange Commission (EDGAR) · Addresses open Google Maps in a new tab

Jobs listed on Arizona AI

31 open Arizona positions See Microsoft jobs

From Microsoft’s own careers site, refreshed twice a day.

Microsoft in Arizona: Key Developments

How does Microsoft fit into AI?

Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where Microsoft sits on it. Stages not marked below are shown for context and are not claims about Microsoft.

  1. Chip design: Companies like Nvidia, Apple and AMD design the chips. Chip designers decide what a chip does and hand the blueprint to a factory. The three companies whose designs matter most to AI - Nvidia, Apple and AMD - do that work elsewhere, then send the designs to fabs. None of them owns a fab of its own.
  2. Wafer fabrication: Fabs print billions of transistors onto silicon wafers. A fab prints a design onto a polished disc of silicon called a wafer, layer by layer, until billions of transistors exist where there was blank material. It is the hardest and most expensive step in the chain, and the reason a single factory can cost tens of billions of dollars.
  3. Advanced packaging: Wafers are cut and assembled into finished chips. Packaging cuts a finished wafer into individual chips and assembles them, often stacking several pieces of silicon and memory into one component. For AI chips this step is nearly as demanding as fabrication, and a wafer is not a usable product until it is done.
  4. Servers and devices: Chips are built into AI servers, phones and PCs. Finished chips are assembled into the things people actually buy and deploy: data-center servers, phones, laptops. This is where a chip stops being a component and starts being a product.
  5. AI in use (here today): Data centers and devices run AI models on that silicon. Operates Azure West US 3 data centers in Goodyear and El Mirage. The end of the chain: models answering questions, generating images and driving software, running on the silicon every earlier step produced. Every AI service anyone uses is running on physical hardware somewhere, and that hardware started as a wafer.

Microsoft: AI in use (here today)

  • 16 buildings tracked; 11 listed as operating (listing sites) (company-reported): Arizona AI tracks 16 Microsoft buildings (an Arizona AI tally from listing sites and city filings) across two Goodyear sites and one El Mirage campus; listing sites show 11 as operating, but only PHX-80 is confirmed operating by a city filing. Microsoft also owns land at Northern Parkway in El Mirage and beside the Citrus Road site in Goodyear. Source: Cleanview
  • Cloud region with Availability Zones since June 2021 (company-reported): Microsoft says West US 3 is designed with Availability Zones that have independent power, network and cooling; it named Banner Health, the State of Arizona and Teradata as early customers that plan to use the region. Source: Microsoft Azure Blog
  • AI role unconfirmed; OpenAI link is a press report (company-reported): Reported by The Atlantic (anonymous source, unconfirmed): a source said the Goodyear campus was designed for Microsoft and OpenAI. Microsoft has not said which Arizona buildings run AI training or inference. Source: Futurism
  • Solar contract and efficiency, by Microsoft's account (company-reported): Microsoft plans to cover the region's energy use through a power purchase agreement with the 150 MW Sun Streams 2 solar plant (20-year term per IPP Journal) and reported a 2022 PUE of 1.223 and WUE of 2.24 L/kWh; renewable coverage was 47% through June 2022. Source: Microsoft
  • Wastewater capacity shaped the Goodyear build: Goodyear's limited sewer and wastewater treatment capacity led Microsoft to fund a $36 million expansion of the wastewater plant and air-cool its fourth and fifth Airpark buildings (March 2023). Source: Phoenix Business Journal via Arizona Technology Council
  • About 430 jobs and a community college pipeline (company-reported): Microsoft says its Arizona data centers employ about 430 people and that the West Valley Datacenter Academy at Estrella Mountain and Glendale community colleges had 364 students in 2024-2025. Source: Microsoft

About Microsoft

What Microsoft does

Microsoft runs West US 3, its Azure cloud region in Arizona, from company-owned data centers in Goodyear and El Mirage in the West Valley of metropolitan Phoenix.

For scale, Microsoft reported 228,000 employees company-wide and $64.6 billion in additions to property and equipment in fiscal 2025, with no Arizona breakout (Form 10-K).

In Arizona

The region went live on June 15, 2021, and Microsoft says the Arizona facilities now employ about 430 people and are still expanding (Microsoft, 2025). Arizona AI tracks 18 Microsoft data center records in Arizona, two campus overviews and 16 buildings, including the Goodyear Airpark campus, the El Mirage campus, PHX-10 and the planned PHX-83.

Microsoft publishes no building count, megawatt figures or per-building opening dates, so building-level detail here comes from city filings and listing sites.

The land came first.

  • Microsoft paid $48 million in August 2018 for 279 acres between Broadway Road and MC-85 south of Phoenix Goodyear Airport (West Valley View), and in February 2019 Goodyear's council voted unanimously to let it start PHX-10 and PHX-11 before a site plan was approved, under a self-certification process in which Microsoft waived claims against the city (KTAR; development agreement).
  • In April 2019 it paid $37 million for 147 acres at Citrus and Indian School roads, the PHX-70 campus, and in May 2019 $20 million for 151 acres at Olive Avenue and Dysart Road in El Mirage (West Valley View; Data Center Dynamics).
  • Microsoft announced data center campuses in El Mirage and Goodyear on July 30, 2019, along with solar power from the 150 MW Sun Streams 2 plant (Microsoft), under what IPP Journal reported as a 20-year agreement (IPP Journal).
  • It has kept buying: $258 million for about 283 acres at Northern Parkway and Dysart Road in May 2024, and $131 million for 100 acres beside the Citrus Road campus in a deal that closed May 29, 2026.

Connect CRE, in a story citing the Phoenix Business Journal, put Microsoft's West Valley data center land spending at roughly $473 million for about 800 acres; Data Center Dynamics counts more than 550 acres (ABC15; Data Center Dynamics; Connect CRE).

El Mirage campus: El Mirage is the best documented campus. Each building holds five data halls plus an administrative area, fed from an on-site Arizona Public Service substation, with water and sewer from EPCOR.

An October 2024 filing on the 150.52-acre site said PHX80 was operating and PHX81 and PHX82 were under construction; it lists 769,622 square feet for those three buildings and 245,539 square feet for the proposed PHX83, which is planned with 21 diesel emergency generators. The filing's stated campus total of 1,105,161 square feet does not match the sum of those figures, 1,015,161 (El Mirage).

The Planning Commission recommended PHX83 4-0 on November 12, 2024, and the City Council approved it 7-0 on December 3, 2024 (staff report). The site is inside Luke Air Force Base's Accident Potential Zone 2, and the base asked that cooling ponds not attract birds and that fuel storage stay outside the zone (Luke AFB letter).

Microsoft's own West US 3 disclosures are a 2022 power usage effectiveness of 1.223, a water usage effectiveness of 2.24 liters per kilowatt-hour, 47 percent renewable coverage through June 2022, and a LEED Gold certificate (Microsoft fact sheet).

Water and wastewater: Water and wastewater capacity became a public issue in Goodyear in 2023. The 2019 Goodyear agreement allowed up to 1 million gallons a day per building and 5 million at full build-out, and Microsoft said its buildings would use "zero water for cooling for more than half the year" (Microsoft, 2020).

By 2023 Goodyear could not accept more than 500,000 gallons a day of the campus's discharge, dissolved solids were near the agreed 1,400 mg/L limit, and Microsoft had abandoned a plan to reuse its treated discharge. The fix, approved unanimously on March 6, 2023, has Microsoft paying $36 million toward a $90 million expansion of the 157th Avenue Wastewater Treatment Plant, posting $5 million in assurance, paying $800,000 for a city coordinator, and air-cooling its fourth and fifth buildings in exchange for 1.2 million gallons a day of capacity (Phoenix Business Journal; Data Center Dynamics).

A 2024 amendment added $3.5 million for replacement water facilities (Goodyear). The Atlantic reported in March 2024 that Microsoft's own estimate for the three-building Airpark campus was about 56 million gallons a year and that it had redacted exact figures in city records as proprietary (Futurism summary).

Microsoft says it and Gila River Water Storage are recharging groundwater with long-term storage credits dedicated to Goodyear and El Mirage, an estimated additional 610,000 cubic meters, and that it funds Lake Mead and Verde River projects (Microsoft, 2020; Microsoft, 2021). In January 2026 it pledged, for the U.S. communities where it builds datacenters rather than for Arizona specifically, to replenish more of the water it uses and to publish water-use data for each datacenter region (Microsoft, 2026).

As of October 2026 Arizona AI has not found that data for West US 3.

Jobs and investment: The jobs and money figures are mostly Microsoft's own. The 2019 announcement projected more than 100 permanent and 1,000 construction jobs; the 2025 fact sheet reports about 430 employees and expects about 2,050 construction jobs at peak.

A Microsoft attorney told Goodyear's council in 2023 that each building represents more than $300 million (Rose Law Group). Microsoft says it has supported more than 100 community-based projects in Phoenix since 2019, runs the Datacenter Academy with Estrella Mountain and Glendale community colleges (364 students in 2024-2025), and gave $300,000 to the Maricopa Promise Program for El Mirage and Goodyear students in October 2025 (EMCC).

Current openings are in the jobs section of this page.

Role in AI and technology

AI workloads: The AI question is open. Microsoft's 10-K says it is investing in cloud and AI infrastructure, and The Atlantic's anonymous source said the Goodyear campus was designed for Microsoft and OpenAI, but Microsoft has not said which Arizona buildings run AI workloads, and Arizona AI treats the OpenAI link as reported, not confirmed.

Research

Papers from the past 12 months in Arizona AI's research catalog with an author affiliated with Microsoft, as indexed by OpenAlex. Company authors may work outside Arizona.

Browse research

Microsoft in Arizona: By the Numbers

Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.

  • Arizona data center records tracked by Arizona AI: 18 records: 2 campuses, 16 buildings
  • Buildings listed as operating (listing sites): 11 of 16 buildings (listing-site status, unverified) (company-reported)
  • Planned data halls in one building (city permit): PHX-16: five 9.6 MW data halls
  • Spent on West Valley data center land since 2018: About $473 million for about 800 acres (reported by Connect CRE, June 2026, citing the Phoenix Business Journal)
  • West US 3 region launched from Arizona: June 2021: West US 3 launched in El Mirage and Goodyear
  • People employed at Arizona data centers (Microsoft figure): About 430 (2025) (company-reported)

The Arizona build-out, 2018 to 2026

  • 2018: Bought 279 acres in Goodyear
  • 2019: Goodyear approved accelerated build agreement
  • 2019: Announced three Arizona campuses
  • 2020: West US 3 named and water pledge made
  • 2021: Goodyear Citrus Rd (PHX-70 to 74): first building online
  • 2021: West US 3 launched
  • 2021: El Mirage (PHX-80 to 83): first building online
  • 2021: Goodyear Airpark (PHX-10 to 16): first building online
  • 2021: West US 3 region launched from Arizona
  • 2023: Goodyear wastewater deal and air cooling
  • 2024: Bought 283 more acres in El Mirage
  • 2026: Bought 100 more acres in Goodyear

Microsoft Goodyear Airpark (PHX-10 to 16), Arizona

MeasureValueAs ofBasisSource
Power capacity (listing-site estimate)57 MW per building, listing-site estimate (Microsoft publishes none)2026-10-17company-reported From the company's own published information.Cleanview
Land and buildings279 acres (2018 purchase); up to five buildings planned. Site plan: PHX-10 244,666 sq ft and PHX-11 242,678 sq ft; Phoenix Business Journal (2023) reports a 290,000 sq ft building, a nearly complete 250,000 sq ft building and a planned 250,000 sq ft building2019-02-25verifiedCity of Goodyear (Legistar)
Address14250 W. Broadway Rd., Goodyear, AZ 853382026-10-28verifiedCity of Goodyear
First building onlineJune 2021 (region launch); land bought 2018 (August per West Valley View, September per KTAR)2021-06-15verifiedKTAR News
Status (listing sites)Operating and expanding, per Microsoft. Listing sites show PHX-10 to PHX-14 operating and PHX-15 and PHX-16 planned, and Arizona AI records follow them (listing-site data, unverified). PHX-13 and PHX-14 operating status unconfirmed; 2023-24 reports describe three buildings or fewer.2026-10-17company-reported From the company's own published information.Cleanview
PHX-16 data halls (city permit)Five data halls of 9.6 MW each, about 16,000 sq ft each (planned)2025-03-27verifiedCity of Goodyear
What happens hereOwner-occupied Microsoft Azure data centers forming part of the West US 3 cloud region with Availability Zones2021-06-15company-reported From the company's own published information.Microsoft Azure Blog
Utility and wastewaterCity of Goodyear water and sewer; interim limit of 500,000 gallons of wastewater per day to the 157th Avenue plant, rising to 1.2 million gallons per day after the Microsoft-funded expansion2023-03-06verifiedPhoenix Business Journal via Arizona Technology Council
Cooling and waterFirst three buildings use direct evaporative (water) cooling with water looped twice; buildings four and five must be air-cooled under the March 2023 amended development agreement2023-03-06verifiedPhoenix Business Journal via Arizona Technology Council

Microsoft Goodyear Citrus Rd (PHX-70 to 74), Arizona

MeasureValueAs ofBasisSource
Power capacity (listing-site estimate)57 MW per building, listing-site estimate (Microsoft publishes none)2026-10-17company-reported From the company's own published information.Cleanview
First building onlineDevelopment agreement approved May 6, 2019; Cleanview says operational 2021, Baxtel says built 2023 (listing sites disagree)2026-10-17company-reported From the company's own published information.Cleanview
Land and buildingsAbout 250 acres after the June 2026 purchase; six buildings existing, under construction or proposed (CoStar)2026-06-11verifiedData Center Dynamics
Address3785 N. Citrus Rd., Goodyear, AZ 853952026-10-28verifiedCity of Goodyear
Status (listing sites)Under development. Listing sites disagree: Cleanview shows PHX-70 to PHX-72 operating and PHX-73 and PHX-74 planned; Baxtel shows PHX-72 and PHX-73 under construction. Arizona AI records follow Cleanview (listing-site data, unverified).2026-10-17company-reported From the company's own published information.Baxtel
What happens hereOwner-occupied Microsoft Azure data centers on the Citrus Road site in Goodyear. Microsoft names the cities; City of Goodyear building permits file this campus as buildings PHX70 to PHX74 at 3785 N. Citrus Rd.2025-10-01company-reported From the company's own published information.Microsoft
Utility and approvalsArizona Public Service on-site substation, named in a 2026 City of Goodyear building permit for PHX73. Goodyear council passed a development agreement for the accelerated PHX 70 schedule on May 6, 2019 and a 2020 agreement allowing a delay in offsite roadway work on April 13, 2020; on May 11, 2020 it accepted three public utility, sidewalk and access easements from Microsoft for the PHX70-PV303 project, 7-0 on the consent agenda.2026-04-22verifiedCity of Goodyear
Cooling and waterMicrosoft says existing Arizona facilities use direct evaporative cooling and future facilities will use air-cooled chillers; no campus-specific water figure is published2025-10-01company-reported From the company's own published information.Microsoft

Microsoft El Mirage (PHX-80 to 83), Arizona

MeasureValueAs ofBasisSource
Power capacity (listing-site estimate)57 MW per building, listing-site estimate (Microsoft publishes none)2026-10-17company-reported From the company's own published information.Cleanview
Land and buildings150.52 acres; four buildings. City filing lists 769,622 sq ft for PHX80-82 and 245,539 sq ft for PHX83 (its stated total of 1,105,161 does not equal their sum of 1,015,161)2024-10-18verifiedCity of El Mirage
Address12901 W. Olive Avenue, El Mirage, AZ 853352026-10-28verifiedCity of El Mirage
First building online2021 (PHX80, per Data Center Dynamics and a listing site); land bought 20192024-11-25verifiedData Center Dynamics
StatusOperating and expanding. City filing (October 2024): PHX80 operational, PHX81 and PHX82 permitted and under construction. PHX83 recommended for approval 4-0 by the Planning Commission on Nov 12, 2024 and approved 7-0 by the City Council on Dec 3, 2024. Arizona AI records, based on listing sites: PHX-80, PHX-81, PHX-82 operating, PHX-83 planned.2024-10-18verifiedCity of El Mirage
What happens hereOwner-occupied Microsoft Azure data centers. Each building holds five data halls plus an administrative area (city filing). PHX83 is planned with 21 diesel emergency generators (20 data hall, 1 admin); the filing does not state generator counts for the other buildings.2024-10-18announced From a public announcement. Plans can change.City of El Mirage
Utility and approvalsArizona Public Service on-site substation; zoning case PZ19-04-05 approved May 2019; PHX82 amendment approved 6-0 by the El Mirage City Council on April 16, 2024; PHX83 amendment recommended 4-0 by the Planning Commission on November 12, 2024 and approved 7-0 by the City Council on December 3, 20242024-12-03verifiedCity of El Mirage
Cooling and waterWater and sewer from EPCOR; a clear water discharge line to the City of El Mirage outfall; Microsoft says existing buildings use direct evaporative cooling2024-10-18verifiedCity of El Mirage

Facilities

MeasureValueAs ofBasisSource
West US 3 launchedJune 2021: Azure West US 3 opened with Availability Zones2021-06-15verifiedMicrosoft Azure Blog

Investment

MeasureValueAs ofBasisSource
Bought 279 acres in GoodyearAugust 2018: paid $48 million for 279 acres south of Phoenix Goodyear Airport2019-05-02verifiedWest Valley View
Bought 283 more acres in El MirageMay 2024: paid $258 million cash for about 283 acres at Northern Parkway and Dysart Road2024-06-05verifiedPhoenix Business Journal via ABC15
Goodyear Airpark land purchase (279 acres)$48 million (August 2018)2018-08-31verifiedWest Valley View
Goodyear Citrus Road land purchase (147 acres)$37 million (April 2019); a 2026 report says $39 million2019-04-15verifiedWest Valley View
El Mirage land purchase (151 acres)$20 million (May 2019)2019-05-02verifiedData Center Dynamics
El Mirage Northern Parkway land purchase (283 acres)$258 million cash (May 31, 2024)2024-05-31verifiedPhoenix Business Journal via ABC15
Payment toward Goodyear 157th Avenue wastewater plant expansion$36 million of a $90 million expansion, plus $5 million assurance and $800,000 for a city coordinator2023-03-06verifiedPhoenix Business Journal via Arizona Technology Council
Reimbursement for Goodyear replacement water facilities (Fifth Amendment)$3.55 million (2024)2024-07-08verifiedCity of Goodyear
Investment per building (Microsoft attorney)More than $300 million per building2023-03-06company-reported From the company's own published information.Phoenix Business Journal via Rose Law Group
Announced Arizona investment"Hundreds of millions of dollars" (2019); no total published since2019-07-30announced From a public announcement. Plans can change.Microsoft On the Issues
Projected annual economic impact in ArizonaAbout $20 million a year (2019 projection)2019-07-30projected A forward-looking estimate, not a measured result.Microsoft On the Issues
Bought 100 more acres in GoodyearMay 2026: paid $131 million for 100 acres beside the Citrus Road campus2026-05-29verifiedData Center Dynamics
Goodyear Citrus Road expansion land (100 acres)$131 million (May 2026)2026-05-29verifiedData Center Dynamics
State and local incentivesThe Arizona Commerce Authority does not publish which companies hold certification under Arizona's Computer Data Center Program, and neither the 2019 Goodyear development agreement nor the El Mirage site plan filings mention a tax incentive. The Goodyear agreements are infrastructure and permitting agreements.2026-10-17verifiedArizona Commerce Authority

Workforce

MeasureValueAs ofBasisSource
Staff per building (Microsoft)About 50 employees per building, working in shifts2025-10-01company-reported From the company's own published information.Microsoft
Arizona data center employees (Microsoft figure)About 430 (2025)2025-10-01company-reported From the company's own published information.Microsoft
Permanent jobs projected at announcementMore than 100 permanent jobs (2019 projection)2019-07-30projected A forward-looking estimate, not a measured result.Microsoft On the Issues
Construction jobs for the new buildingsAbout 2,050 jobs at peak and 8.4 million work hours (2025 projection)2025-10-01projected A forward-looking estimate, not a measured result.Microsoft
Employees (company-wide)About 228,000 worldwide, 125,000 in the U.S. (June 2025, company-wide)2025-06-30verifiedU.S. Securities and Exchange Commission (EDGAR)
West Valley Microsoft Datacenter Academy364 students in 2024-2025; $375,000 in scholarships since 20212025-10-01company-reported From the company's own published information.Microsoft
Maricopa Promise Program grant for El Mirage and Goodyear students$300,000 (October 2025)2025-10-30verifiedEstrella Mountain Community College

Production

MeasureValueAs ofBasisSource
Azure region served from ArizonaWest US 3, with Availability Zones; early customers named by Microsoft were Banner Health, the State of Arizona and Teradata2021-06-15verifiedMicrosoft Azure Blog
Power usage effectiveness, West US 3 (2022)PUE 1.223 (calendar 2022); forecast 1.12 for new buildings2022-12-31company-reported From the company's own published information.Microsoft
Renewable energy for the Arizona region47% renewable coverage through June 2022, with agreements with Longroad Energy and AES. Microsoft says it will fulfill its 100% renewable coverage commitment in this region through a power purchase agreement with Sun Streams 2 (150 MW, Longroad Energy, per its 2021 blog; renewable energy certificates offset the campus use).2022-06-30company-reported From the company's own published information.Microsoft
Backup powerPHX83 is planned with 21 diesel emergency generators (20 data hall, 1 admin), each data hall generator with an approximately 10,000-gallon tank (administration generator 3,000 gallons); Microsoft says Arizona generators run on a renewable biofuel2024-10-18company-reported From the company's own published information.City of El Mirage
LEED certificationMicrosoft says the Arizona datacenter is LEED Gold certified and new facilities are built to LEED Gold standards2023-04-01company-reported From the company's own published information.Microsoft
Additions to property and equipment (company-wide)$64.6 billion in fiscal 2025, up from $44.5 billion in fiscal 2024 (company-wide, not Arizona)2025-06-30verifiedU.S. Securities and Exchange Commission (EDGAR)
AI workloads in Arizona (reported by The Atlantic)Microsoft has not said which Arizona buildings run AI workloads. Reported by The Atlantic (anonymous source, unconfirmed), March 2024: a source said the Goodyear campus was designed for Microsoft and OpenAI use; both companies declined to comment2024-03-02company-reported From the company's own published information.Futurism

Water and environment

MeasureValueAs ofBasisSource
Goodyear wastewater deal and air coolingMarch 2023: agreed to pay $36 million toward Goodyear wastewater plant and air-cool buildings four and five2023-03-06verifiedPhoenix Business Journal via Arizona Technology Council
Water usage effectiveness, West US 3 (2022)WUE 2.24 liters per kWh (calendar 2022)2022-12-31company-reported From the company's own published information.Microsoft
Cooling designExisting buildings: direct evaporative cooling, water used less than 40% of the year, water cycled 2 to 5 times then discharged to the wastewater plant; future buildings: air-cooled chillers2025-10-01company-reported From the company's own published information.Microsoft
Goodyear Airpark campus design water demandUp to 1 million gallons per day per building, 5 million per day at full build-out (2019 agreement)2019-02-25verifiedCity of Goodyear (Legistar)
Goodyear wastewater constraint and fixThe campus was limited to 500,000 gallons of industrial discharge per day until a dedicated discharge line (due August 2024) and the Microsoft-funded plant expansion; total dissolved solids were near the agreed 1,400 mg/L limit2023-03-16verifiedData Center Dynamics
Other Arizona water projects Microsoft fundsLake Mead conservation with the State of Arizona and the Colorado River Indian Tribes (matched one-to-one by the Water Funder Initiative); Verde River projects with The Nature Conservancy and the Yavapai-Apache Nation; leak-detection partnerships with Phoenix-area utilities (2026)2021-06-15company-reported From the company's own published information.Microsoft Azure Blog
Per-region water data pledgeMicrosoft said in January 2026 it will publish water-use and replenishment data for each U.S. datacenter region; as of October 2026 Arizona AI found no West US 3 water-use figure newer than the 2022 WUE2026-01-13announced From a public announcement. Plans can change.Microsoft On the Issues
Groundwater replenishment for Goodyear and El MirageMicrosoft says it and Gila River Water Storage are recharging groundwater with long-term storage credits dedicated to Goodyear and El Mirage, an estimated additional 610,000 cubic meters (about 494 acre-feet, Arizona AI conversion)2020-09-21company-reported From the company's own published information.Microsoft Azure Blog
Goodyear campus estimated annual water use (three buildings)About 56 million gallons a year once the third building is complete (Microsoft estimate reported by The Atlantic)2024-03-02company-reported From the company's own published information.Futurism

Other

MeasureValueAs ofBasisSource
Goodyear approved accelerated build agreementFebruary 2019: Goodyear council voted unanimously to let Microsoft build PHX 10-11 before site plan approval2019-02-25verifiedKTAR News
Announced three Arizona campusesJuly 2019: announced campuses in El Mirage and Goodyear powered by Sun Streams 2 solar2019-07-30verifiedMicrosoft On the Issues
West US 3 named and water pledge madeSeptember 2020: Arizona region named West US 3; Microsoft pledged to be water positive by 20302020-09-21verifiedMicrosoft Azure Blog
Headquarters and founding (company-wide)Redmond, Washington; founded 1975; publicly traded (Nasdaq: MSFT); fiscal 2025 revenue $281.7 billion (company-wide)2025-06-30verifiedU.S. Securities and Exchange Commission (EDGAR)
Ownership model in ArizonaMicrosoft owns the land and buildings itself (owner-occupied), not leased from a colocation developer2024-10-18verifiedCity of El Mirage
Self-certification construction process in GoodyearGoodyear let Microsoft start PHX 10-11 before site plan approval under a self-certification process, with Microsoft waiving claims and taking the risk of rework2019-02-25verifiedCity of Goodyear (Legistar)
Luke Air Force Base review of El Mirage campusThe El Mirage site is inside Luke AFB Accident Potential Zone 2 and the 70 to 75 Ldn high-noise zone; the base flagged bird-strike risk from cooling ponds and asked that fuel storage be kept outside APZ 22023-06-12verifiedU.S. Air Force, 56th Fighter Wing, via City of El Mirage
Goodyear wastewater capacity shortfall (2019 to 2023)Goodyear lacked sewer and treatment capacity for the campus; Microsoft abandoned its water-reuse plan, agreed to pay for a plant expansion and to air-cool future buildings2023-03-16verifiedData Center Dynamics
Building status rests on listing sitesListing-site data, unverified: Microsoft publishes no per-building opening dates or statuses, and listing sites disagree on PHX-72 and PHX-82 (one says operating, one says under construction)2026-10-17company-reported From the company's own published information.Baxtel
Community investment in the Phoenix areaMore than 100 community projects in Phoenix since 2019 (2025 fact sheet); $1.7 million across 60 partners in the Phoenix West Valley by April 2023; $1.1 million across 70 initiatives by June 20212025-10-01company-reported From the company's own published information.Microsoft
Community-First AI Infrastructure pledge (U.S. datacenter communities)Five pledges for the communities where Microsoft builds and operates datacenters, launched in the United States: keep its datacenters from raising local electricity prices, replenish more water than it uses, create local jobs, pay its full share of local property taxes, fund AI training and nonprofits. Not Arizona-specific.2026-01-13announced From a public announcement. Plans can change.Microsoft On the Issues
Water figures redacted (reported by The Atlantic)Reported by The Atlantic, March 2024 (press report, unconfirmed): Microsoft redacted exact water figures in Goodyear city records as proprietary information. Arizona AI has not seen the records.2024-03-02company-reported From the company's own published information.Futurism
City votes on the data centersThese city votes on the data centers were unanimous: Goodyear council votes of Feb 2019 and March 2023, a 4-0 El Mirage Planning Commission vote on PHX83, and El Mirage City Council approvals of PHX82 6-0 (April 2024) and PHX83 7-0 (December 2024).2026-10-17verifiedCity of El Mirage

Sources

Microsoft Jobs in Arizona (31 open)

Arizona AI currently tracks 31 open Microsoft roles in Arizona, the largest named category being business & corporate (6). Counts come from the Arizona AI job index, aggregated from the employer's own careers system and refreshed twice daily; they reflect published listings, not total employment.

Microsoft Business & Corporate Jobs in Arizona (6)

Microsoft Facilities, Construction & Utilities Jobs in Arizona (4)

Microsoft Hardware & Design Engineering Jobs in Arizona (2)

Microsoft IT, Security & Networking Jobs in Arizona (2)

Microsoft Manufacturing Technicians & Skilled Trades Jobs in Arizona (1)

Microsoft Process & Equipment Engineering Jobs in Arizona (1)

Microsoft Other Roles Jobs in Arizona (15)

Microsoft Events

Microsoft in Arizona: Common Questions

How many jobs does Microsoft have open in Arizona right now?

Arizona AI is currently tracking 31 open Microsoft roles in Arizona, in Phoenix. The count updates automatically as Microsoft adds and removes postings, and duplicate listings for the same role are merged.

What kinds of roles does Microsoft hire for in Arizona?

The largest categories among current listings at Microsoft in Arizona are business & corporate (6), facilities, construction & utilities (4), hardware & design engineering (2), it, security & networking (2). Categories are derived from job titles by Arizona AI.

Where in Arizona are Microsoft jobs located?

Microsoft lists Arizona roles in Phoenix. Locations are shown exactly as Microsoft publishes them. Employers sometimes label roles with the metropolitan area rather than the specific campus city.

How do I apply for a job at Microsoft in Arizona?

Each listing on this page links through to Microsoft's own application page. Arizona AI does not collect applications or charge job seekers, and roles are aggregated from the employer's official careers system rather than from third-party recruiters.

Where are Microsoft's data centers in Arizona?

Microsoft says it operates and is building data centers in Goodyear and El Mirage. City permits and zoning filings name the buildings at three campuses, two in Goodyear and one in El Mirage. In Goodyear, the Airpark site covers 279 acres between Broadway Road and MC-85 south of Phoenix Goodyear Airport, at 14250 W. Broadway Rd., the address the City of Goodyear uses on its permits for buildings PHX-09 to PHX-16, and the Citrus Road site is at 3785 N. Citrus Rd., at the southeast corner of Indian School Road and Citrus Road (PHX-70 to PHX-74). The El Mirage campus is at 12901 W Olive Avenue, at Olive Avenue and Dysart Road (PHX-80 to PHX-83). Microsoft also owns about 283 acres at Northern Parkway and Dysart Road in El Mirage, bought in 2024, with nothing built there yet as far as Arizona AI found.

How many Microsoft data centers are there in Arizona?

Microsoft does not publish a count. Arizona AI tracks 16 Microsoft buildings in Arizona. Listing sites show 11 as operating (PHX-10 to PHX-14, PHX-70 to PHX-72, PHX-80 to PHX-82) and 5 as planned (PHX-15, PHX-16, PHX-73, PHX-74, PHX-83), but only PHX-80 is confirmed operating by a city filing (El Mirage, October 2024). The five operating Goodyear Airpark buildings (PHX-10 to PHX-14) rest only on the listing site Cleanview and conflict with 2023 and 2024 press reports of two to three buildings there, and listing sites disagree on PHX-72 and PHX-82. The El Mirage City Council approved PHX-83 7-0 on December 3, 2024, after a 4-0 Planning Commission recommendation. Treat the count as approximate.

What is Azure West US 3?

West US 3 is the Microsoft Azure cloud region served from the Goodyear and El Mirage data centers. Microsoft launched it on June 15, 2021 with Availability Zones, which are separate physical sites with independent power, network and cooling. Microsoft named Banner Health, the State of Arizona and Teradata as early customers.

How much power do Microsoft's Arizona data centers use?

Microsoft has not published a megawatt figure, but a City of Goodyear building permit for PHX-16 describes five data halls of 9.6 MW each in that one building, a planned rating rather than an operating figure. The listing site Cleanview estimates 57 MW for every one of the 16 buildings, which is an estimate rather than a measurement, so Arizona AI does not add it up. Microsoft reported a power usage effectiveness of 1.223 for West US 3 in calendar 2022.

How much water do Microsoft's Arizona data centers use?

Microsoft publishes a water usage effectiveness of 2.24 liters per kilowatt-hour for West US 3 in 2022, but no gallons total. Its 2019 Goodyear agreement allowed up to 1 million gallons a day per building and 5 million a day at full build-out. The Atlantic reported in March 2024 that Microsoft's own estimate for the three-building Goodyear Airpark campus was about 56 million gallons a year, and that Microsoft had redacted exact figures in city records as proprietary. Microsoft says existing buildings use direct evaporative cooling with water needed less than 40 percent of the year, and that future buildings will be air-cooled.

What was the Goodyear wastewater dispute about?

Goodyear did not have enough sewer line or treatment capacity for the Airpark campus, and Microsoft dropped a plan to reuse its treated discharge. Under an amended development agreement approved unanimously on March 6, 2023, Microsoft agreed to pay $36 million toward the roughly $90 million expansion of the 157th Avenue Wastewater Treatment Plant, deposit $5 million in assurance for a new sewer line, pay $800,000 for a city coordinator, and make buildings four and five air-cooled. In return it gets 1.2 million gallons a day of plant capacity at full build-out.

How is Microsoft replenishing water in Arizona?

Microsoft says it and Gila River Water Storage are recharging groundwater with long-term storage credits dedicated to Goodyear and El Mirage, an estimated additional 610,000 cubic meters. It also funds Lake Mead conservation with the State of Arizona and the Colorado River Indian Tribes, Verde River projects with The Nature Conservancy, and leak-detection work with Phoenix-area utilities. In January 2026 it pledged, for the U.S. communities where it builds datacenters, to replenish more of the water it uses and to publish water-use data for each datacenter region; Arizona AI has not yet found that data for West US 3.

How many people does Microsoft employ in Arizona?

Microsoft says its Arizona data centers employed about 430 people as of 2025, up from a 2019 projection of more than 100 permanent jobs. It expects about 2,050 construction jobs at peak for the new buildings. Microsoft does not publish a total Arizona headcount including its other offices; company-wide it had about 228,000 employees in June 2025.

How much has Microsoft invested in Arizona?

Microsoft said in 2019 it was investing "hundreds of millions of dollars" and has not updated that total. Connect CRE reported in June 2026 that Microsoft has spent roughly $473 million on about 800 acres of West Valley data center land; Arizona AI's sum of the individual reported purchases is $494 million for about 960 acres: $48 million (2018) and $37 million (2019) in Goodyear, $20 million (2019) and $258 million (2024) in El Mirage, and $131 million (2026) in Goodyear. A Microsoft attorney told Goodyear in 2023 that each building represents more than $300 million.

Does Microsoft hire in Arizona?

Yes. Arizona AI tracks Microsoft job postings in Arizona on this page. Microsoft says each data center building supports about 50 employees in shifts, and it runs the West Valley Datacenter Academy with Estrella Mountain and Glendale community colleges, which had 364 students in 2024-2025 and offers CompTIA certifications.