The live tracker for Arizona's AI economy

QTS Data Centers in Arizona

By Arizona AI · Profile reviewed · 41 sourced facts

At a glance

QTS Data Centers, a Blackstone-owned builder and operator of large data centers, lists three Arizona campuses as in development: Phoenix 2 in Phoenix, Phoenix 3 in Glendale and Phoenix 4 in Avondale. QTS Data Centers was operating a 42MW building at its Phoenix 2 campus by 2023 and broke ground on a fifth building there on March 21, 2023. QTS Data Centers paid $246.8 million in July 2024 for 206 acres in Avondale. QTS Data Centers says its closed-loop cooling needs a one-time water fill of typically around 615,000 gallons per building.

Key facts

Arizona locations (4)
Headquarters
Sterling, Virginia
Ownership
Owned by Blackstone
Website
q.com

Sources: Google Maps, QTS Data Centers: Phoenix 2 - QTS Data Centers, Maricopa County Assessor, QTS Data Centers: Phoenix 4 - QTS Data Centers, QTS Data Centers: US Locations - QTS Data Centers, U.S. Securities and Exchange Commission · Addresses open Google Maps in a new tab

Jobs listed on Arizona AI

17 open Arizona positions See QTS Data Centers jobs

From QTS Data Centers’ own careers site, refreshed twice a day.

How does QTS Data Centers fit into AI?

Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where QTS Data Centers sits on it. Stages not marked below are shown for context and are not claims about QTS Data Centers.

  1. Chip design: Companies like Nvidia, Apple and AMD design the chips. Chip designers decide what a chip does and hand the blueprint to a factory. The three companies whose designs matter most to AI - Nvidia, Apple and AMD - do that work elsewhere, then send the designs to fabs. None of them owns a fab of its own.
  2. Wafer fabrication: Fabs print billions of transistors onto silicon wafers. A fab prints a design onto a polished disc of silicon called a wafer, layer by layer, until billions of transistors exist where there was blank material. It is the hardest and most expensive step in the chain, and the reason a single factory can cost tens of billions of dollars.
  3. Advanced packaging: Wafers are cut and assembled into finished chips. Packaging cuts a finished wafer into individual chips and assembles them, often stacking several pieces of silicon and memory into one component. For AI chips this step is nearly as demanding as fabrication, and a wafer is not a usable product until it is done.
  4. Servers and devices: Chips are built into AI servers, phones and PCs. Finished chips are assembled into the things people actually buy and deploy: data-center servers, phones, laptops. This is where a chip stops being a component and starts being a product.
  5. AI in use (here today): Data centers and devices run AI models on that silicon. Operates a data center campus in Phoenix (40th Street). The end of the chain: models answering questions, generating images and driving software, running on the silicon every earlier step produced. Every AI service anyone uses is running on physical hardware somewhere, and that hardware started as a wafer.

QTS Data Centers: AI in use (here today)

  • 750MW campus planned in Glendale (announced): QTS has filed plans with Glendale for a 16-building, roughly 3 million sq ft campus with 750MW of planned critical capacity. Source: DCD (Data Center Dynamics)
  • Liquid cooling offered for AI workloads (company-wide) (company-reported): QTS markets liquid cooling designs for cooling-intensive workloads such as AI across its hyperscale campuses; it does not say which Arizona buildings use them. Source: QTS Data Centers

About QTS Data Centers

What QTS Data Centers does

QTS Realty Trust, known as QTS Data Centers, is a Blackstone-owned builder and operator of large data centers. In its 2020 annual report, QTS described itself as a provider of data center solutions to:

  • the world's largest hyperscale technology companies
  • enterprises
  • government agencies

QTS's executive headquarters were in Overland Park, Kansas, according to that report, and its website now lists its U.S. headquarters in Sterling, Virginia.

Ownership: Blackstone funds completed their acquisition of QTS on August 31, 2021, in a deal valued at approximately $10 billion including debt, and QTS stock is no longer listed on any public market. At that time QTS said it owned more than 7 million square feet of data center space in North America and Europe.

Land portfolio: Today QTS markets a land portfolio of more than 3,000 acres for hyperscale development; that is a company-wide figure, not an Arizona one.

In Arizona

Downtown Phoenix: QTS's Google Maps listing shows QTS Phoenix-Van Buren at 120 E. Van Buren St., Digital Realty's PHX10 colocation building in downtown Phoenix. City of Phoenix permit records show the building under annual facilities permit I-0393, titled Digital Van Buren, name Digital Phoenix Van Buren LLC as owner on a permit issued in August 2026, and list work in Digital Realty suites, including work for QTS in Suites 200 and C130B as recently as December 2025. QTS's own published information conflicts on this site: its list of U.S. locations does not include it.

As of October 2026, QTS lists three Arizona campuses as In Development:

  • Phoenix 2: Phoenix 2 on North 40th Street in Phoenix, where a 42MW building was reported operating in 2023.
  • Phoenix 3: Phoenix 3 in Glendale, reported under construction in February 2025.
  • Phoenix 4: Phoenix 4 in Avondale.

Phoenix history: QTS's Arizona history begins in Phoenix. Its 2020 annual report says a leased Phoenix data center came with its June 16, 2015 acquisition of Carpathia Hosting and was still leased at the end of 2020, though the filing gives no address. In July 2017 QTS bought approximately 84 acres of land in Phoenix for future development.

Phoenix 2 construction: By 2023 QTS was operating a 337,330 square foot, 42MW building at 1200 N. 40th Street, described as the first in a planned 280MW+ campus on 85 acres, and it broke ground on a fifth building there, PHX2 DC5, on March 21, 2023. QTS's campus page listed an address for DC5 as of May 2026 but does not state which buildings are operating.

Phoenix 2 figures: QTS's current page for the 40th Street campus, which it calls Phoenix 2, describes an 80-acre campus with 210 MW+ of critical campus capacity across buildings DC1 through DC5. These acreage and capacity figures differ by source and year and should not be combined.

West Valley land: QTS then moved into the West Valley. On July 5, 2022 it bought nearly 400 acres west of the Loop 303 from First Industrial Realty Trust and Merit Partners for about $255 million, a price later reported as $255.3 million.

Phoenix 3 plans: QTS submitted initial plans for this campus, called Phoenix 3, to the City of Glendale in early 2023. The plans reported in 2024 call for 16 buildings of around 180,000 square feet each, about 3 million square feet in total, north of Camelback Road along Cotton Lane. QTS's website then said the 375-acre campus would offer 750MW of critical capacity; that is planned capacity, not operating capacity.

Phoenix 3 progress: In February 2025 the Phoenix Business Journal, republished by the Arizona Technology Council, reported the Glendale campus as under construction. City of Glendale development records updated in 2026 list several Phoenix 3 buildings as approved and in construction, the furthest along about 90% complete; as of October 2026 QTS lists Phoenix 3 as In Development, and its current Phoenix 3 page gives no megawatt figure. QTS lists building addresses on West Camelback Road with a Litchfield Park postal address.

Phoenix 4 planning: A third Arizona campus, Phoenix 4, is in Avondale. Before QTS bought the land, the seller, TGV Investments, secured a rezoning and general plan amendment for the Hermosa Ranch site in May 2024, and the Avondale City Council approved a final plat in June. Data Center Dynamics reported that the council approved the general plan amendment unanimously despite concerns from city staff.

Phoenix 4 land: In July 2024 QTS paid $246.8 million in an all-cash deal for 206 acres there. AZBEX reported that the data center would occupy 212 acres of the 234-acre Hermosa Ranch Technology Campus North area.

Phoenix 4 listing: QTS lists the campus at 11753 W. Lower Buckeye Rd. with a Tolleson postal address, and no megawatt figure for it was found. As of October 2026 QTS lists Phoenix 4 as In Development. The Glendale and Avondale amounts are land prices only, not total project investment.

Workforce training: QTS has also put money and effort into training Arizona data center workers. QTS says an alliance it leads built the Maricopa Community Colleges Data Center Operations certificate, which QTS calls the second program of its kind in the nation.

On July 23, 2025, QTS, EdgeCore Digital Infrastructure and the Phoenix chapter of AFCOM launched a scholarship fund for that program, with initial gifts of:

The July 2025 announcement said the gifts would support up to 50 students at Mesa Community College and Estrella Mountain Community College in the Fall 2025 and Spring 2026 semesters. No report on the fund's results after July 2025 was found.

Role in AI and chips

In the AI and chip supply chain, QTS supplies the buildings, power and cooling that hold other companies' computers. QTS says its liquid cooling is designed for cooling-intensive workloads such as AI, a company-wide product claim.

Water use: On water, QTS says its closed-loop cooling design needs a one-time fill of typically around 615,000 gallons per building rather than ongoing water use for cooling, and its Glendale campus page lists a water-free cooling system among its goals. QTS also says buildings still use water during construction and for domestic needs.

QTS Data Centers in Arizona: By the Numbers

Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.

  • Arizona data center campuses QTS lists, all marked In Development: 3 (Phoenix 2, Phoenix 3 in Glendale, Phoenix 4 in Avondale) (company-reported)
  • Phoenix 2 campus critical capacity (whole campus, as QTS states it): 210 MW+ (company-reported)
  • Phoenix 3 (Glendale) planned critical capacity: 750MW (planned) (announced)
  • Owned by Blackstone funds since August 31, 2021 (take-private of QTS Realty Trust): Approximately $10 billion, including debt
  • Phoenix 4 (Avondale) land purchase, 206 acres: $246.8 million for 206 acres
  • QTS gift to the Maricopa Community Colleges data center operations scholarship fund: $33,350

The Arizona build-out, 2015 to 2025

  • 2015: Leased Phoenix data center acquired with Carpathia Hosting (still leased as of December 31, 2020)
  • 2017: Phoenix 2 campus, 40th Street, Phoenix: land acquired in Phoenix for future development
  • 2021: Blackstone funds complete take-private of QTS Realty Trust
  • 2022: QTS buys nearly 400 acres west of Loop 303 for its Glendale campus
  • 2023: Phoenix 2 campus, 40th Street, Phoenix: groundbreaking for PHX2 DC5, fifth building on the campus
  • 2023: QTS submits initial Phoenix 3 campus plans to the City of Glendale
  • 2024: QTS buys 206 acres in Avondale for a fourth metro Phoenix campus
  • 2025: QTS, EdgeCore and AFCOM Phoenix launch a Data Center Operations Scholarship Fund with Maricopa Community Colleges

QTS Phoenix-Van Buren, downtown Phoenix, Arizona

MeasureValueAs ofBasisSource
Address120 E. Van Buren St., Phoenix, AZ 850042026-10-28verifiedGoogle Maps
What it isSpace inside Digital Realty's PHX10 colocation building2026-10-31verifiedCity of Phoenix Planning and Development Department

QTS Data Centers Phoenix 2 campus, 40th Street, Phoenix, Arizona

MeasureValueAs ofBasisSource
Address1200 N. 40th St., Phoenix, AZ 850082026-10-28company-reported From the company's own published information.QTS Data Centers
Campus land80-acre campus2026-05-13company-reported From the company's own published information.QTS Data Centers
Land acquired in Phoenix for future developmentJuly 20172017-07-01verifiedU.S. Securities and Exchange Commission
First building operating at 1200 N. 40th St. (size and power as reported in 2023)42MW, 337,330 sq ft2023-05-18verifiedDCD (Data Center Dynamics)
Groundbreaking for PHX2 DC5, fifth building on the campusMarch 21, 20232023-03-21verifiedDCD (Data Center Dynamics)
Status on QTS location listIn Development2026-10-03company-reported From the company's own published information.QTS Data Centers

QTS Data Centers Phoenix 3 campus, Glendale (Camelback Rd and Cotton Lane), Arizona

MeasureValueAs ofBasisSource
Address17408 W. Camelback Rd., Glendale, AZ 853402026-11-04verifiedMaricopa County Assessor
Campus land as reported in 2024375 acres2024-05-28company-reported From the company's own published information.DCD (Data Center Dynamics)
Land purchase price, July 2022$255.3 million2022-07-01verifiedDCD (Data Center Dynamics)
Planned buildout: 16 buildings totaling about 3 million sq ftAbout 3 million sq ft in 16 buildings (planned)2024-05-28announced From a public announcement. Plans can change.DCD (Data Center Dynamics)
Status on QTS location listIn Development2026-10-03company-reported From the company's own published information.QTS Data Centers
Construction status reported in February 2025Under construction2025-02-28verifiedArizona Technology Council (republishing Phoenix Business Journal)

QTS Data Centers Phoenix 4 campus, Avondale (Hermosa Ranch), Arizona

MeasureValueAs ofBasisSource
Address11753 W. Lower Buckeye Rd., Tolleson, AZ 853532026-10-28company-reported From the company's own published information.QTS Data Centers
Land acquired for the campus206 acres2024-07-01verifiedAZBEX (Arizona Builder's Exchange)
Avondale City Council rezoning before QTS bought the landThe seller, TGV Investments, secured a rezoning and general plan amendment in May 2024 and a final plat in June 20242024-05-01verifiedAZBEX (Arizona Builder's Exchange)
Status on QTS location listIn Development2026-10-03company-reported From the company's own published information.QTS Data Centers

Facilities

MeasureValueAs ofBasisSource
Leased Phoenix data center acquired with Carpathia Hosting (still leased as of December 31, 2020)June 16, 20152015-06-16verifiedU.S. Securities and Exchange Commission
QTS buys nearly 400 acres west of Loop 303 for its Glendale campusJuly 20222022-07-05verifiedDCD (Data Center Dynamics)
QTS submits initial Phoenix 3 campus plans to the City of GlendaleEarly 20232023-01-01verifiedDCD (Data Center Dynamics)
QTS buys 206 acres in Avondale for a fourth metro Phoenix campusJuly 20242024-07-01verifiedDCD (Data Center Dynamics)
Land portfolio for hyperscale development, worldwide3,000+ acres2026-10-03company-reported From the company's own published information.QTS Data Centers
Owned data center space worldwide at time of Blackstone dealMore than 7 million sq ft (North America and Europe)2021-08-31company-reported From the company's own published information.U.S. Securities and Exchange Commission

Workforce

MeasureValueAs ofBasisSource
QTS, EdgeCore and AFCOM Phoenix launch a Data Center Operations Scholarship Fund with Maricopa Community CollegesJuly 23, 20252025-07-23verifiedMaricopa Community Colleges Foundation
QTS-led data center alliance built the Maricopa Community Colleges Data Center Operations certificateQTS led more than 10 Phoenix-area organizations in building a data center operations certificate with Maricopa Community Colleges; QTS calls it the second of its kind in the nation2025-07-07company-reported From the company's own published information.QTS Data Centers
U.S. jobs QTS says it supports this year (not employees; includes contractors and suppliers)40,000 supported U.S. jobs (projected)2026-10-03projected A forward-looking estimate, not a measured result.QTS Data Centers

Production

MeasureValueAs ofBasisSource
What QTS doesBuilds and operates large data centers leased to hyperscale technology companies, enterprises and government agencies2020-12-31company-reported From the company's own published information.U.S. Securities and Exchange Commission

Water and environment

MeasureValueAs ofBasisSource
Closed-loop cooling: typical one-time water fill per building (company-wide design)Typically around 615,000 gallons, one time2026-08-27company-reported From the company's own published information.QTS Data Centers
Water-free cooling system stated on the Glendale campus pageQTS states a goal of using a water-free cooling system on its Phoenix 3 (Glendale) campus page2026-05-13company-reported From the company's own published information.QTS Data Centers

Other

MeasureValueAs ofBasisSource
Blackstone funds complete take-private of QTS Realty TrustAugust 31, 20212021-08-31verifiedBlackstone
Corporate headquarters (as of the last annual report, FY2020)Overland Park, Kansas2020-12-31verifiedU.S. Securities and Exchange Commission
QTS policy on disclosing site power capacityQTS says it does not disclose specific power capacity for security and confidentiality reasons2026-10-03company-reported From the company's own published information.QTS Data Centers

Sources

QTS Data Centers Jobs in Arizona (17 open)

Arizona AI currently tracks 17 open QTS Data Centers roles in Arizona, the largest named category being internships & early career (3). Counts come from the Arizona AI job index, aggregated from the employer's own careers system and refreshed twice daily; they reflect published listings, not total employment.

QTS Data Centers Internships & Early Career Jobs in Arizona (3)

QTS Data Centers Business & Corporate Jobs in Arizona (2)

QTS Data Centers Facilities, Construction & Utilities Jobs in Arizona (2)

QTS Data Centers Hardware & Design Engineering Jobs in Arizona (2)

QTS Data Centers Manufacturing & Equipment Technicians Jobs in Arizona (2)

QTS Data Centers Other Roles Jobs in Arizona (6)

QTS Data Centers in Arizona: Key Developments

No coverage of QTS Data Centers in Arizona has been picked up yet. Browse all Arizona AI news.

QTS Data Centers in Arizona: Common Questions

How many jobs does QTS Data Centers have open in Arizona right now?

Arizona AI is currently tracking 17 open QTS Data Centers roles in Arizona, across Phoenix and Glendale. The count updates automatically as QTS Data Centers adds and removes postings, and duplicate listings for the same role are merged.

What kinds of roles does QTS Data Centers hire for in Arizona?

The largest categories among current listings at QTS Data Centers in Arizona are internships & early career (3), business & corporate (2), facilities, construction & utilities (2), hardware & design engineering (2). Categories are derived from job titles by Arizona AI.

Where in Arizona are QTS Data Centers jobs located?

QTS Data Centers lists Arizona roles in Phoenix and Glendale. Locations are shown exactly as QTS Data Centers publishes them. Employers sometimes label roles with the metropolitan area rather than the specific campus city.

How do I apply for a job at QTS Data Centers in Arizona?

Each listing on this page links through to QTS Data Centers' own application page. Arizona AI does not collect applications or charge job seekers, and roles are aggregated from the employer's official careers system rather than from third-party recruiters.

What does QTS Data Centers do?

QTS builds and operates large data centers. In its 2020 annual report it described itself as a provider of data center solutions to hyperscale technology companies, enterprises and government agencies. It has been owned by Blackstone funds since August 31, 2021.

Where are QTS data centers in Arizona?

QTS's Google Maps listing shows QTS Phoenix-Van Buren at 120 E. Van Buren St. in downtown Phoenix, inside Digital Realty's PHX10 building; QTS's own list of U.S. locations does not include it. QTS lists three Arizona campuses, all In Development: Phoenix 2 on North 40th Street in Phoenix, Phoenix 3 in Glendale on West Camelback Road, and Phoenix 4 in Avondale at 11753 W. Lower Buckeye Rd..

When did QTS come to Arizona?

QTS gained a leased Phoenix data center through its June 16, 2015 acquisition of Carpathia Hosting, and in July 2017 it bought approximately 84 acres in Phoenix for future development. It bought its Glendale land in July 2022 and its Avondale land in July 2024.

How big is the QTS Glendale data center campus?

Plans reported in 2024 call for 16 buildings totaling around 3 million square feet, and QTS's website then said the 375-acre campus would offer 750MW of critical capacity. These are planned figures. The campus was reported under construction in February 2025. City of Glendale development records updated in 2026 list several of its buildings as approved and in construction, the furthest along about 90% complete, and as of October 2026 QTS lists the campus as In Development.

How much power does the QTS Phoenix campus have?

QTS's Phoenix 2 page states 210 MW+ of critical campus capacity, without separating operating from planned capacity. In 2023 the first building at 1200 N. 40th Street was reported as a 42MW facility. QTS says it does not disclose specific power capacity for security and confidentiality reasons.

How much did QTS pay for land in Arizona?

QTS paid $255.3 million for its Glendale site in July 2022 and $246.8 million for 206 acres in Avondale in July 2024. These are land prices only; no total Arizona investment figure has been published.

Is QTS involved in AI?

QTS says its liquid cooling is designed for cooling-intensive workloads such as AI, a company-wide claim. City of Phoenix permits to fit out data halls at its Phoenix campus and City of Glendale tenant improvement permits at its Glendale campus list QTS companies as owners.

How many people does QTS employ in Arizona?

QTS has not published an Arizona employee count. Its figure of 40,000 supported U.S. jobs is a projection that includes contractors and suppliers, not a QTS headcount.

Do QTS data centers use water for cooling?

QTS says its closed-loop cooling design needs a one-time fill of typically around 615,000 gallons per building rather than ongoing water use for cooling. Its Glendale campus page lists a water-free cooling system among its goals. No Arizona-specific water figure has been published.