The live tracker for Arizona's AI economy

Applied Materials in Arizona

By Arizona AI · Profile reviewed · 51 sourced facts

At a glance

Applied Materials supplies chipmaking equipment, with assembly, integration and testing operations in Tempe, Arizona, and offices in Chandler and north Phoenix. Applied Materials and Arizona State University opened the Materials-to-Fab Center in Tempe in October 2025 for semiconductor research and prototyping. In August 2025, Applied Materials announced plans to invest more than $200 million in a Chandler facility to produce semiconductor equipment components and parts. City of Chandler permits show Applied Materials completed a parts-repair cleanroom at that facility in September 2026 and was building an expansion in October 2026.

Key facts

Arizona locations (6)
Headquarters
Santa Clara, California
Ownership
Public company
Nasdaq: AMAT
Website
appliedmaterials.com

Sources: Google Maps business listing: Applied Materials (ACE) - Google Maps, Google Maps business listing: Macro Technology Works Building - Google Maps, Applied Materials, U.S. Securities and Exchange Commission: Applied Materials, Inc. Fiscal 2025 Form 10-K, U.S. Securities and Exchange Commission: Applied Materials, Inc. Form 8-K dated August 27, 2026 · Addresses open Google Maps in a new tab

Jobs listed on Arizona AI

77 open Arizona positions See Applied Materials jobs

From Applied Materials’ own careers site, refreshed twice a day.

Applied Materials in Arizona: Key Developments

How does Applied Materials fit into AI?

Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where Applied Materials sits on it. Stages not marked below are shown for context and are not claims about Applied Materials.

  1. Chip design: Companies like Nvidia, Apple and AMD design the chips. Chip designers decide what a chip does and hand the blueprint to a factory. The three companies whose designs matter most to AI - Nvidia, Apple and AMD - do that work elsewhere, then send the designs to fabs. None of them owns a fab of its own.
  2. Wafer fabrication (here today): Fabs print billions of transistors onto silicon wafers. Chipmaking equipment in a shared Tempe R&D fab. A fab prints a design onto a polished disc of silicon called a wafer, layer by layer, until billions of transistors exist where there was blank material. It is the hardest and most expensive step in the chain, and the reason a single factory can cost tens of billions of dollars.
  3. Advanced packaging: Wafers are cut and assembled into finished chips. Packaging cuts a finished wafer into individual chips and assembles them, often stacking several pieces of silicon and memory into one component. For AI chips this step is nearly as demanding as fabrication, and a wafer is not a usable product until it is done.
  4. Servers and devices: Chips are built into AI servers, phones and PCs. Finished chips are assembled into the things people actually buy and deploy: data-center servers, phones, laptops. This is where a chip stops being a component and starts being a product.
  5. AI in use: Data centers and devices run AI models on that silicon. The end of the chain: models answering questions, generating images and driving software, running on the silicon every earlier step produced. Every AI service anyone uses is running on physical hardware somewhere, and that hardware started as a wafer.

Applied Materials: Wafer fabrication (here today)

  • Industry-grade fab tools in a university lab: The Tempe Materials-to-Fab Center puts Applied Materials' semiconductor manufacturing equipment in a shared space where ASU, startups and industry partners prototype new chip processes. Source: Arizona State University (ASU News)
  • Chandler plant to make parts for chipmaking tools (announced): Applied Materials announced plans in 2025 to invest more than $200 million in a Chandler facility to produce semiconductor equipment components and parts. Source: Applied Materials

About Applied Materials

What Applied Materials does

Chipmaking equipment: Applied Materials designs, builds and services equipment used to manufacture semiconductors. Its business also includes services and software for chip factories. Its headquarters is in Santa Clara, California, and its common stock trades on Nasdaq as AMAT.

Worldwide scale: Applied Materials reported $28.37 billion in net revenue for fiscal 2025 and approximately 36,500 regular full-time employees worldwide as of October 26, 2025.

In Arizona

Tempe operations: The company's ISO 9001 certificate, reissued August 31, 2026, lists Applied Materials ACE at 8175 S. Hardy Dr., Tempe for assembly, integration, testing, logistics and support functions. Its Arizona site map names this location ACE B500.

Research with ASU: Applied Materials and Arizona State University opened the Materials-to-Fab Center on October 9, 2025.

Shared facility: ASU describes the research, development and prototyping center as a $270 million project inside MacroTechnology Works at 7700 South River Parkway, Tempe. The center brings semiconductor manufacturing equipment into a setting shared by university researchers, industry partners, startups and government organizations. Applied Materials' Arizona map also identifies its ARC office and lab at this address.

Other offices: Applied Materials' Arizona site map lists three additional office locations:

Watkins Street listing: Google Maps also lists "Applied Materials" at 3925 E. Watkins St., Phoenix. Applied's own list of locations does not include that address. City of Phoenix records file the building's annual facilities permit under "ULTRACLEAN-UCT", and a December 2023 fire alarm permit there is titled "APPLIED MATERIALS UCT FA TI".

Chandler manufacturing plan: Applied Materials announced on August 6, 2025 that it plans to invest more than $200 million in a Chandler facility to produce semiconductor equipment components and parts.

Chandler construction: City of Chandler permits show Applied Materials' cleanroom for semiconductor parts repair at 2377 S. Arizona Ave. passed final inspection on September 21, 2026, and an expansion with manufacturing space, cleanrooms and CVD tools was under construction in October 2026.

Chandler building: Applied Materials bought the building at 2377 South Arizona Avenue, Chandler, according to the broker's sale announcement. In May 2025 the Chandler City Council unanimously approved a water service agreement for an Applied Materials semiconductor equipment manufacturing facility at that address. The company's Arizona map labels the address ACE B501.

Role in AI and chips

Research and prototyping: At the Tempe Materials-to-Fab Center, Applied Materials' equipment supports work on semiconductor materials and processes. ASU describes the center's role in moving research toward fab prototypes, including work on two-dimensional semiconductor materials relevant to future AI processors and quantum devices.

Equipment supply: Applied Materials' Tempe ACE operations include the assembly, integration and testing activities listed in its quality certificate. Applied Materials' Chandler facility includes a cleanroom for semiconductor parts repair, completed in September 2026, and an expansion with manufacturing space and cleanrooms under construction. These activities support the machinery used to make chips.

Controversies and Issues

Global workforce reduction: Applied Materials approved a program in October 2025 expected to affect approximately 4% of its global workforce. Its fiscal 2025 annual report recorded $181 million in restructuring charges in that year's fourth quarter.

Export-control settlement: In February 2026, Applied Materials agreed to pay $252.5 million to the U.S. Commerce Department's Bureau of Industry and Security and to conduct internal export-compliance audits. Its quarterly report for the period ended July 26, 2026 says the settlement was paid in full.

Applied Materials in Arizona: By the Numbers

Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.

  • Planned investment in new Chandler manufacturing facility: $200 million (announced)
  • Jobs the planned Chandler facility could support over five years: Potentially 200 additional jobs (projected)
  • Materials-to-Fab Center in Tempe, stated project value (shared with ASU): $270 million (company-reported)
  • Purchase price of Chandler industrial building, June 2025: $41.15 million
  • Regular full-time employees worldwide: Approximately 36,500
  • Net revenue worldwide, fiscal 2025: $28.37 billion

The Arizona build-out, 2020 to 2026

  • 2020: Leased lab space at ASU MacroTechnology Works and began funded ASU research
  • 2023: Materials-to-Fab Center, Tempe (shared with ASU): announced
  • 2025: Applied Materials manufacturing site, Chandler: announced
  • 2025: Materials-to-Fab Center, Tempe (shared with ASU): opened
  • 2025: Applied Materials manufacturing site, Chandler: acquired
  • 2026: ASU named inaugural university research partner at Applied Materials' EPIC Center in California

Applied Materials ACE manufacturing site, Tempe, Arizona

MeasureValueAs ofBasisSource
Address8175 S. Hardy Dr., Tempe, AZ 852842026-11-01verifiedGoogle Maps business listing
What it doesAssembly, integration, testing and logistics (listed as "Semiconductor Manufacturing" on the certificate), plus support functions2026-10-31company-reported From the company's own published information.Applied Materials

Applied Materials Materials-to-Fab Center, Tempe (shared with ASU), Arizona

MeasureValueAs ofBasisSource
Address7700 South River Parkway, Tempe, AZ 852842026-11-01verifiedGoogle Maps business listing
RoleShared research, development and prototyping facility that puts Applied Materials semiconductor manufacturing equipment in a university setting open to industry partners, startups, government and other universities2025-10-09verifiedArizona State University (ASU News)
Cleanroom space50,000 sq ft2025-10-09verifiedKTAR News (story by Phoenix Business Journal)
OpenedOctober 20252025-10-09verifiedArizona State University (ASU News)
StatusOperating; opened October 20252026-05-15verifiedArizona State University (ASU News)
AnnouncedJuly 20232023-07-11verifiedArizona State University (ASU News)

Applied Materials manufacturing site, Chandler, Arizona

MeasureValueAs ofBasisSource
Address2377 South Arizona Avenue, Chandler, AZ 852862026-11-01company-reported From the company's own published information.Applied Materials
Planned roleAdvanced manufacturing facility to produce semiconductor equipment components and parts2025-12-16announced From a public announcement. Plans can change.City of Chandler
Planned facility size182,000 sq ft (planned)2026-08-27announced From a public announcement. Plans can change.City of Chandler
StatusParts-repair cleanroom completed September 2026; expansion under construction2026-10-30verifiedCity of Chandler
Purchased building size181,655 sq ft2025-06-17verifiedKTAR News (story by Phoenix Business Journal)
Parts-repair cleanroom (permit BLD26-0313)Final inspection approved September 21, 2026; certificate of occupancy issued2026-11-02verifiedCity of Chandler
Expansion with manufacturing space and cleanrooms (permit BLD26-1950)Permit issued; construction inspections October 1 to 30, 20262026-11-02verifiedCity of Chandler
Site size10 acres2025-06-17verifiedKTAR News (story by Phoenix Business Journal)
AnnouncedAugust 20252025-08-06verifiedKTAR News
AcquiredJune 20252025-06-17verifiedKTAR News (story by Phoenix Business Journal)

Applied Materials ARC Catalyst office, Tempe, Arizona

MeasureValueAs ofBasisSource
Address2030 E. ASU Circle, Tempe, AZ 852842026-11-01company-reported From the company's own published information.Applied Materials
RoleOffice2026-11-01company-reported From the company's own published information.Applied Materials

Applied Materials Frye office, Chandler, Arizona

MeasureValueAs ofBasisSource
Address2525 W. Frye Road, Suite 230, Chandler, AZ 852242026-11-01company-reported From the company's own published information.Applied Materials
RoleSales and service office2026-11-01company-reported From the company's own published information.Applied Materials

Applied Materials Norterra office, Phoenix, Arizona

MeasureValueAs ofBasisSource
Address25800 N. Norterra Parkway, Suites 120 and 128, Phoenix, AZ 850852026-11-01company-reported From the company's own published information.Applied Materials
RoleSales and service office2026-11-01company-reported From the company's own published information.Applied Materials

Investment

MeasureValueAs ofBasisSource
Applied Materials' anticipated contributions to the Materials-to-Fab CenterMore than $200 million2023-07-11announced From a public announcement. Plans can change.Arizona State University (ASU News)
Arizona Commerce Authority investment in the Materials-to-Fab Center project$30 million2023-07-11announced From a public announcement. Plans can change.Arizona State University (ASU News)
ASU investment in the Materials-to-Fab Center project$17 million2023-07-11announced From a public announcement. Plans can change.Arizona State University (ASU News)

Workforce

MeasureValueAs ofBasisSource
Worldwide workforce by regionAbout 46% Asia-Pacific, 42% North America, 12% Europe and Middle East2025-10-26verifiedU.S. Securities and Exchange Commission
Global workforce reduction approved October 2025Approximately four percent of the global workforce expected to be affected2025-10-23announced From a public announcement. Plans can change.U.S. Securities and Exchange Commission
Scholarship endowment and Momentum Fund for ASU engineering studentsApplied Materials said it intends to launch an endowment for scholarships to first-generation and underrepresented minority students in ASU's engineering schools and to make its Momentum Fund available to ASU students2023-07-11announced From a public announcement. Plans can change.Arizona State University (ASU News)

Production

MeasureValueAs ofBasisSource
What the company does (company-wide)Provides equipment, services and software to the semiconductor and related industries2025-10-26verifiedU.S. Securities and Exchange Commission
Role in the chip supply chain (company-wide)Designs, builds and services the wafer fabrication tools chipmakers use to manufacture semiconductors2025-10-26verifiedU.S. Securities and Exchange Commission
Materials deposition Center of Excellence at the Tempe centerASU said the Materials-to-Fab Center would be home to Applied Materials' Center of Excellence in materials deposition technology2023-07-11announced From a public announcement. Plans can change.Arizona State University (ASU News)
Advanced packaging systems (company-wide product line)Company-wide, Applied Materials sells advanced packaging systems that let chipmakers connect multiple chips through heterogeneous integration.2025-10-26verifiedU.S. Securities and Exchange Commission
CHIPS Act research supported at the Tempe centerASU says the Materials-to-Fab Center supports ASU research projects tied to the CHIPS and Science Act, including the Southwest Advanced Prototyping Hub and the SHIELD USA advanced packaging initiative2026-05-15company-reported From the company's own published information.Arizona State University (ASU News)
AI as a demand driver (company-wide)The annual report calls AI and related technologies a significant demand driver for the industries the company serves2025-10-26company-reported From the company's own published information.U.S. Securities and Exchange Commission
ASU named inaugural university research partner at Applied Materials' EPIC Center in CaliforniaMay 20262026-05-15verifiedArizona State University (ASU News)

Other

MeasureValueAs ofBasisSource
Incorporation of the Delaware company1967 (company-wide)2025-10-26verifiedU.S. Securities and Exchange Commission
Corporate headquartersSanta Clara, California2025-10-26verifiedU.S. Securities and Exchange Commission
OwnershipPublicly traded; common stock listed on the Nasdaq Stock Market under the symbol AMAT2026-08-27verifiedU.S. Securities and Exchange Commission
Export-control settlement with U.S. Commerce Department (company-wide)$252.5 million2026-02-11verifiedU.S. Securities and Exchange Commission
Justice Department subpoenas on federal award applications (company-wide)The fiscal 2025 annual report disclosed Justice Department subpoenas seeking information related to certain federal award applications2025-12-12verifiedU.S. Securities and Exchange Commission
Leased lab space at ASU MacroTechnology Works and began funded ASU researchOctober 20202020-10-29verifiedArizona State University (ASU News)

Sources

Applied Materials Jobs in Arizona (77 open)

Arizona AI currently tracks 77 open Applied Materials roles in Arizona, the largest named category being process & equipment engineering (18). Counts come from the Arizona AI job index, aggregated from the employer's own careers system and refreshed twice daily; they reflect published listings, not total employment.

Most current listings at Applied Materials in Arizona advertise $108,000 to $148,500 a year, with a midpoint of $128,250. Across every listing the full span runs $60,000 to $224,000. Medians across 24 of 77 listings with employer-published pay.

Applied Materials Process & Equipment Engineering Jobs in Arizona (18)

Applied Materials Internships & Early Career Jobs in Arizona (9)

Applied Materials Manufacturing & Equipment Technicians Jobs in Arizona (9)

Applied Materials Business & Corporate Jobs in Arizona (6)

Applied Materials Hardware & Design Engineering Jobs in Arizona (5)

Applied Materials Software, Data & AI Jobs in Arizona (3)

Applied Materials IT, Security & Networking Jobs in Arizona (1)

Applied Materials Supply Chain & Procurement Jobs in Arizona (1)

Applied Materials Other Roles Jobs in Arizona (25)

Applied Materials in Arizona: Common Questions

How many jobs does Applied Materials have open in Arizona right now?

Arizona AI is currently tracking 77 open Applied Materials roles in Arizona, across Phoenix, Chandler, Tempe and 1 other location. The count updates automatically as Applied Materials adds and removes postings, and duplicate listings for the same role are merged.

What does Applied Materials pay in Arizona?

Most current postings at Applied Materials in Arizona advertise $108,000 to $148,500 a year, with a midpoint of $128,250; across all listings the full span runs $60,000 to $224,000. These are ranges Applied Materials publishes on its own job postings, not estimates or self-reported figures, drawn from 24 of 77 current listings. An individual posting's range may span several job levels.

What kinds of roles does Applied Materials hire for in Arizona?

The largest categories among current listings at Applied Materials in Arizona are process & equipment engineering (18), internships & early career (9), manufacturing & equipment technicians (9), business & corporate (6). Categories are derived from job titles by Arizona AI.

Where in Arizona are Applied Materials jobs located?

Applied Materials lists Arizona roles in Phoenix, Chandler, Tempe and Arizona (Home-Based). Locations are shown exactly as Applied Materials publishes them. Employers sometimes label roles with the metropolitan area rather than the specific campus city.

How do I apply for a job at Applied Materials in Arizona?

Each listing on this page links through to Applied Materials' own application page. Arizona AI does not collect applications or charge job seekers, and roles are aggregated from the employer's official careers system rather than from third-party recruiters.

What does Applied Materials do?

Applied Materials provides equipment, services and software to the semiconductor and related industries. It says it designs, develops, produces and services the wafer fabrication tools chipmakers need to manufacture semiconductors. It is headquartered in Santa Clara, California.

Is Applied Materials involved in AI or chipmaking?

Applied Materials supplies the tools used to make chips. Its fiscal 2025 annual report calls AI and AI-related technologies a significant demand driver for the industries it serves. In Tempe, its semiconductor manufacturing equipment sits in a shared research and prototyping center with ASU.

What are some milestones in Applied Materials' Arizona operations?

ASU announced a lab-space collaboration with Applied Materials in 2020. Applied Materials and ASU announced the Materials-to-Fab Center in 2023 and celebrated its opening on October 9, 2025. Applied Materials also bought a Chandler industrial building in 2025 and announced plans that year to invest more than $200 million in a Chandler parts facility, where City of Chandler permits show a parts-repair cleanroom completed in September 2026.

Where is Applied Materials located in Arizona?

Applied Materials' Arizona site map lists ACE B500 at 8175 S. Hardy Dr., Tempe, its ARC office and lab at 7700 South River Parkway, Tempe, the ARC Catalyst office at 2030 E. ASU Circle, Tempe, ACE B501 at 2377 South Arizona Avenue, Chandler, the Frye office at 2525 W. Frye Road, Suite 230, Chandler, and the Norterra office at 25800 N. Norterra Parkway, Phoenix. The Materials-to-Fab Center is inside ASU's MacroTechnology Works building at the River Parkway address.

What workforce figures has Applied Materials reported?

Applied Materials reported approximately 36,500 regular full-time employees worldwide as of October 26, 2025. Separately, the City of Chandler described the announced manufacturing project as potentially supporting 200 additional jobs over five years. The first figure is global employment; the second is a project forecast.

What is the Materials-to-Fab Center at ASU?

It is a shared research, development and prototyping facility that ASU describes as a $270 million project, inside MacroTechnology Works at the ASU Research Park in Tempe. It brings Applied Materials semiconductor manufacturing equipment into a setting open to the university, industry partners, startups and government. Applied Materials' contributions were anticipated to exceed $200 million. It officially opened on October 9, 2025, and ASU described it as operating in May 2026.

What is Applied Materials building in Chandler?

Applied Materials announced in August 2025 that it plans to invest more than $200 million in a Chandler facility to produce semiconductor equipment components and parts. City of Chandler permits show a parts-repair cleanroom there passed final inspection on September 21, 2026, and an expansion was under construction in October 2026. It purchased the building at 2377 South Arizona Avenue; its Arizona site map labels that address ACE B501.

What global workforce reduction did Applied Materials announce in 2025?

Applied Materials approved a workforce reduction in October 2025 expected to affect approximately 4% of its global workforce. Its fiscal 2025 annual report recorded $181 million in restructuring charges in that year's fourth quarter.