NXP Semiconductors, a Dutch maker of chips used in cars, industrial and connected devices, phones and telecom networks, runs two wafer fabs in Chandler, Arizona: an 8-inch fab and the 6-inch ECHO gallium nitride fab for 5G radio chips. NXP plans to close the ECHO fab, with the last wafer expected in the first quarter of 2027. Nokia agreed in July 2026 to acquire NXP's Chandler fab campus, which Nokia plans to convert to indium phosphide production for optical components; the deal is expected to close in the first quarter of 2029.

Key facts

Arizona location
Headquarters
Eindhoven, Netherlands
Ownership
Public company
Nasdaq: NXPI
Website
nxp.com

Sources: Google Maps, U.S. Securities and Exchange Commission · Addresses open Google Maps in a new tab

Jobs listed on Arizona AI

39 open Arizona positions See NXP Semiconductors jobs

From NXP Semiconductors’ own careers site, refreshed twice a day.

NXP Semiconductors in Arizona: Key Developments

  • Aug 31, 2026
    Nokia to Transform NXP’s Chandler Campus for AI-Era Optical Chips
    Nokia plans to give NXP Semiconductors’ Chandler manufacturing campus a new role in the buildout of artificial intelligence infrastructure. The telecommunications company has entered into a definitive agreement to acquire NXP’s Chandler Fab and Chandler Probe site. Subject to regulatory approval, Nokia will begin leasing part of the facility in early 2027 and acquire the … [More] The post Nokia to Transform NXP’s Chandler Campus for AI-Era Optical Chips appeared first on Greater Phoenix In Business Magazine.

How does NXP Semiconductors fit into AI?

Modern AI runs on physical silicon, and that silicon passes through several hands before it ever answers a question. Here is the path, and where NXP Semiconductors sits on it. Stages not marked below are shown for context and are not claims about NXP Semiconductors.

  1. Chip design: Companies like Nvidia, Apple and AMD design the chips. Chip designers decide what a chip does and hand the blueprint to a factory. The three companies whose designs matter most to AI - Nvidia, Apple and AMD - do that work elsewhere, then send the designs to fabs. None of them owns a fab of its own.
  2. Wafer fabrication (here today): Fabs print billions of transistors onto silicon wafers. Wafer fabrication in Chandler. A fab prints a design onto a polished disc of silicon called a wafer, layer by layer, until billions of transistors exist where there was blank material. It is the hardest and most expensive step in the chain, and the reason a single factory can cost tens of billions of dollars.
  3. Advanced packaging: Wafers are cut and assembled into finished chips. Packaging cuts a finished wafer into individual chips and assembles them, often stacking several pieces of silicon and memory into one component. For AI chips this step is nearly as demanding as fabrication, and a wafer is not a usable product until it is done.
  4. Servers and devices: Chips are built into AI servers, phones and PCs. Finished chips are assembled into the things people actually buy and deploy: data-center servers, phones, laptops. This is where a chip stops being a component and starts being a product.
  5. AI in use: Data centers and devices run AI models on that silicon. The end of the chain: models answering questions, generating images and driving software, running on the silicon every earlier step produced. Every AI service anyone uses is running on physical hardware somewhere, and that hardware started as a wafer.

NXP Semiconductors: Wafer fabrication (here today)

  • Two of NXP's five front-end fabs (company-reported): NXP said in 2024 that Chandler was home to two of its five front-end wafer fabs. Source: NXP Semiconductors
  • Nokia plans optical chip production on the campus (announced): Nokia plans to convert NXP's Chandler fab campus to indium phosphide chips for optical components, citing the AI build-out. Source: U.S. Securities and Exchange Commission

About NXP Semiconductors

What NXP Semiconductors does

NXP Semiconductors is a Dutch public company that makes semiconductors. It was incorporated in the Netherlands in 2006, its principal executive office is at High Tech Campus 60 in Eindhoven, and its common shares trade on the Nasdaq Global Select Market under the symbol NXPI. Its annual report says its products are used in automotive, industrial and Internet of Things (IoT), mobile, and communication infrastructure applications.

NXP reported worldwide revenue of $12,269 million for 2025, compared with $12,614 million for 2024, and employed approximately 32,169 people worldwide at the end of 2025, including approximately 1,439 in its SSMC joint venture. The filing gives no Arizona headcount.

Its Arizona operation, a campus in Chandler with two wholly owned wafer fabs, is in transition:

  • The gallium nitride (GaN) fab: NXP announced in December 2025 that it plans to close the Chandler GaN fab by 2027. Its annual report published Feb. 19, 2026, still listed the fab as of Dec. 31, 2025, and no later update on the closure was found.
  • The campus: Nokia disclosed on July 23, 2026, a definitive agreement to acquire the Chandler campus, with closing expected in the first quarter of 2029. In August 2026 NXP said the sale includes Chandler Fab and Chandler Probe, in phases.

In Arizona

What the fabs do: In Arizona, NXP works at the wafer fabrication stage of chipmaking, the front end where circuits are built on silicon wafers. Its 2025 annual report lists two wholly owned front-end fabs in Chandler:

  • The 8-inch fab: an 8-inch wafer fab making CMOS, eNVM and BCDMOS chips at line widths of 0.18 to 0.50 micron.
  • The GaN fab: a 6-inch gallium nitride (GaN) fab listed as Chandler RF, at 0.25 to 0.40 micron.

NXP said in 2024 that Chandler was home to two of its five front-end fabs.

A campus older than NXP: NXP's Chandler operation is older than NXP. The company says the Chandler Fab shipped its first silicon in 1994. Freescale, the semiconductor business that came out of Motorola, was separated from Motorola in 2004, and NXP acquired Freescale on December 7, 2015, for a total consideration of $11.6 billion; Light Reading reported in December 2025 that the Chandler site came to NXP through that takeover.

In 2024 NXP said the Chandler Fab occupied an 80-acre site with 200,000 square feet of manufacturing space and that some 750 employees kept it running. NXP's 2019 annual report listed 1,173,196 square feet of owned building space at Chandler, a broader measure than manufacturing space.

The GaN fab opens: On September 29, 2020, NXP announced the grand opening of a 150 mm (6-inch) RF gallium nitride fab in Chandler, which it described as the most advanced fab dedicated to 5G RF power amplifiers in the United States. NXP's release quoted Joakim Sorelius of Ericsson, which NXP called a longstanding customer.

A packaging partnership: In December 2023, Arizona State University announced that, with support from the Arizona Commerce Authority and in partnership with NXP, it had received a $17.5 million investment to expand fan-out wafer-level packaging research and workforce training. The money went to ASU, not to NXP. ASU said the expansion would also include internships, joint research and next-generation GaN research for 6G in partnership with NXP in Chandler.

No update on that partnership after December 2023 was found; the NXP comment in ASU's announcement came from its radio power business, which is the business NXP announced in December 2025 it is exiting.

The reversal: Five years after the GaN fab's opening, NXP reversed course. In December 2025 it announced plans to stop making its radio power product line and to close the GaN fab in Chandler, which Light Reading reported is expected to produce its last wafer in the first quarter of 2027. No NXP update to that schedule after December 2025 was found.

NXP said that given market realities with no outlook for recovery, the radio power business no longer fit its long-term strategy. At the time, NXP also said the Chandler facility producing other types of semiconductors would continue.

The Nokia deal: In a Form 6-K dated July 23, 2026, Nokia said it had a definitive agreement to acquire NXP's Chandler Semiconductor Fabrication campus. Subject to regulatory approvals, Nokia plans to lease manufacturing capacity in part of the facility starting in early 2027, convert the site to indium phosphide production for optical components, and then acquire the full site, with closing expected in the first quarter of 2029.

Nokia said the deal adds U.S. indium phosphide capacity as domestic supply grows more important for the AI build-out. The filing states no price. NXP's own product discontinuation notice of August 6, 2026 says the sale of the Chandler site includes Chandler Fab and Chandler Probe, in a phased approach over the next few years, and NXP is discontinuing the legacy products listed in the notice that will not move to another manufacturing site. Neither company's statements give wafer sizes.

An environmental legacy: NXP also carries an environmental legacy in the Phoenix area. Its 2025 annual report says soil and groundwater contamination has been identified at its property near Phoenix and that remediation is expected to continue for many years. As of December 31, 2025, NXP had recorded $95 million for environmental remediation costs company-wide, the same as a year earlier; the filing does not say how much of that is for Arizona.

Separately, an EPA fact sheet dated November 2018 names NXP USA, Inc., successor to Motorola Inc., and Honeywell International Inc. as two of the responsible parties for the M52 Site, conducting an investigation under EPA oversight. No later status of that investigation after November 2018 was found. The annual report does not name that site, so Arizona AI does not treat the two records as the same matter.

Role in AI and chips

The facts gathered show no AI role for the Arizona fabs themselves. NXP's AI move is company-wide: on October 27, 2025, it closed the acquisition of Kinara, Inc. for $284 million in cash, a maker of edge AI processors, and no Arizona link to that deal is stated.

NXP's documented ties to TSMC are outside Arizona, including a 10% stake in the TSMC-majority ESMC fab in Dresden, Germany, where initial production was targeted for 2028 as of NXP's 2025 annual report, with no later update found. Neither the 2025 annual report nor the second-quarter 2026 report mentions Intel or TSMC operations in Arizona.

Controversies and Issues

Motorola clean room lawsuits, resolved 2025 to 2026: Lawsuits against Motorola in the Circuit Court of Cook County, Illinois, alleged a connection between work in Motorola's semiconductor clean rooms and birth defects in children of former workers. NXP's 2025 annual report described suits over 21 people, with alleged exposures between 1980 and 2005, and an Illinois appeals court decision in 2018 in one of the cases describes work by a former employee at Motorola's chip plant in Mesa, Arizona. NXP helped Motorola defend the suits under indemnity obligations in the 2004 agreement that separated Freescale, which NXP later acquired, from Motorola. Status: NXP's quarterly report for the period ended September 27, 2026 says all pending cases were settled by the end of the first quarter of 2026 and paid in the second quarter, and none remain pending.

NXP Semiconductors in Arizona: By the Numbers

Each figure is dated and linked to its source. Figures that are company-reported, announced, or projected rather than measured are labeled.

  • Chandler Fab site area: 80 acres (company-reported)
  • ECHO GaN fab: last wafer expected: Last GaN wafer expected in the first quarter of 2027 (announced)
  • Nokia agreement to acquire NXP's Chandler fab campus: Definitive agreement; Nokia to lease capacity from early 2027 and acquire the full site, expected to close in Q1 2029 (announced)
  • Employees worldwide: Approximately 32,169
  • Revenue worldwide, 2025: $12.3 billion

The Arizona build-out, 1994 to 2026

  • 1994: Chandler Fab (8-inch wafer fab): first silicon shipped from Chandler Fab
  • 2004: Freescale separated from Motorola
  • 2015: NXP acquires Freescale
  • 2020: ECHO Fab, Chandler (6-inch RF GaN): ECHO GaN fab grand opening
  • 2023: ASU and NXP packaging and GaN partnership
  • 2025: NXP announces exit from radio power and ECHO fab closure
  • 2026: Nokia agrees to acquire NXP's Chandler fab campus

NXP Semiconductors Chandler Fab (8-inch wafer fab), Arizona

MeasureValueAs ofBasisSource
Address1300 N. Alma School Rd., Chandler, AZ 852242026-10-28verifiedGoogle Maps
Front-end wafer fab, 8-inch wafersWholly owned 8-inch front-end fab; 0.18 to 0.50 micron CMOS, eNVM and BCDMOS2025-12-31verifiedU.S. Securities and Exchange Commission
Chandler Fab manufacturing space200,000 sq ft2024-08-05company-reported From the company's own published information.NXP Semiconductors
Owned building space at Chandler, 20191,173,196 sq ft2019-12-31verifiedU.S. Securities and Exchange Commission
First silicon shipped from Chandler Fab19941994-01-01company-reported From the company's own published information.NXP Semiconductors
Chandler Fab statusOperating; included in the sale to Nokia, in phases; NXP is discontinuing legacy products listed in its notice that will not move to another site2026-08-06announced From a public announcement. Plans can change.NXP Semiconductors
Chandler Fab employeesSome 7502024-08-05company-reported From the company's own published information.NXP Semiconductors

NXP Semiconductors ECHO Fab, Chandler (6-inch RF GaN), Arizona

MeasureValueAs ofBasisSource
Address1300 N. Alma School Rd., Chandler, AZ 852242026-10-28verifiedGoogle Maps
RF gallium nitride fab for 5G power amplifiers150 mm (6-inch) RF GaN fab making 5G RF power amplifiers2020-09-29company-reported From the company's own published information.NXP Semiconductors
ECHO GaN fab grand openingSeptember 20202020-09-29verifiedNXP Semiconductors
ECHO GaN fab statusClosing by 2027 as NXP exits the radio power market2025-12-13announced From a public announcement. Plans can change.KTAR News (Phoenix Business Journal)
Chandler RF fab processWholly owned 6-inch GaN fab, 0.25 to 0.40 micron2025-12-31verifiedU.S. Securities and Exchange Commission
Named customer quoted at the GaN fab launchEricsson, described by NXP as a longstanding customer, commented in NXP's release on the fab opening2020-09-29company-reported From the company's own published information.NXP Semiconductors
Reason NXP gave for exiting radio powerNo outlook for recovery in the 5G radio power market2025-12-13company-reported From the company's own published information.KTAR News (Phoenix Business Journal)

Investment

MeasureValueAs ofBasisSource
Freescale acquisition total consideration$11.6 billion2015-12-07verifiedU.S. Securities and Exchange Commission
Arizona Commerce Authority investment in ASU tied to NXP partnership$17.5 million2023-12-21verifiedArizona State University (ASU News)
Acquisition of Kinara (edge AI NPUs)$284 million2025-10-27verifiedU.S. Securities and Exchange Commission

Workforce

MeasureValueAs ofBasisSource
ASU workforce and 6G GaN research with NXP ChandlerInternships, joint research and next-generation GaN research for 6G with NXP in Chandler2023-12-21announced From a public announcement. Plans can change.Arizona State University (ASU News)

Production

MeasureValueAs ofBasisSource
Planned use of the Chandler campus under NokiaConversion to indium phosphide production for optical components2026-07-23announced From a public announcement. Plans can change.U.S. Securities and Exchange Commission
Role in the chip supply chainSupplies semiconductors used in automotive, industrial and IoT, mobile and communication infrastructure applications2025-12-31verifiedU.S. Securities and Exchange Commission
Stake in TSMC-led ESMC fab, Dresden (not Arizona)10% stake in the TSMC-majority ESMC fab in Dresden, Germany, with rights to 10% of its capacity; production targeted for 20282025-12-31verifiedU.S. Securities and Exchange Commission

Water and environment

MeasureValueAs ofBasisSource
Soil and groundwater contamination at NXP property near PhoenixContamination identified; remediation expected to continue for many years2025-12-31verifiedU.S. Securities and Exchange Commission
Environmental remediation reserve (company-wide)$95 million2025-12-31verifiedU.S. Securities and Exchange Commission
Responsible party at Motorola 52nd Street Superfund site, PhoenixNXP USA, Inc. named by EPA as a responsible party, conducting vapor intrusion investigation2018-11-01verifiedU.S. Environmental Protection Agency

Other

MeasureValueAs ofBasisSource
Freescale separated from Motorola20042004-01-01verifiedU.S. Securities and Exchange Commission
NXP acquires FreescaleDecember 7, 20152015-12-07verifiedU.S. Securities and Exchange Commission
ASU and NXP packaging and GaN partnershipDecember 20232023-12-21announced From a public announcement. Plans can change.Arizona State University (ASU News)
NXP announces exit from radio power and ECHO fab closureDecember 20252025-12-10verifiedLight Reading
Nokia agrees to acquire NXP's Chandler fab campusJuly 20262026-07-23announced From a public announcement. Plans can change.U.S. Securities and Exchange Commission
HeadquartersHigh Tech Campus 60, Eindhoven, the Netherlands2025-12-31verifiedU.S. Securities and Exchange Commission
Stock listingNasdaq Global Select Market, ticker NXPI2025-12-31verifiedU.S. Securities and Exchange Commission

Sources

NXP Semiconductors Jobs in Arizona (39 open)

Arizona AI currently tracks 39 open NXP Semiconductors roles in Arizona, the largest named category being manufacturing technicians & skilled trades (13). Counts come from the Arizona AI job index, aggregated from the employer's own careers system and refreshed twice daily; they reflect published listings, not total employment.

NXP Semiconductors Manufacturing Technicians & Skilled Trades Jobs in Arizona (13)

NXP Semiconductors Hardware & Design Engineering Jobs in Arizona (6)

NXP Semiconductors Process & Equipment Engineering Jobs in Arizona (6)

NXP Semiconductors Internships & Early Career Jobs in Arizona (5)

NXP Semiconductors Business & Corporate Jobs in Arizona (2)

NXP Semiconductors Packaging, Assembly & Test Jobs in Arizona (2)

NXP Semiconductors Software, Data & AI Jobs in Arizona (2)

NXP Semiconductors Other Roles Jobs in Arizona (3)

  • Photolithography Equipment Engineer
    Chandler, AZ · Employer reference: photolithography-equipment-engineer_r-10066728 · Posted Sep 23, 2026
  • Principal Engineer
    Chandler, AZ · Employer reference: principal-engineer_r-10066118 · $174,070 per year · Posted Aug 7, 2026
  • ECHO EQUIPMENT ENGINEER
    Chandler, AZ · Full-time · Employer reference: echo-equipment-engineer_r-10064843 · Posted Jul 10, 2026

NXP Semiconductors in Arizona: Common Questions

How many jobs does NXP Semiconductors have open in Arizona right now?

Arizona AI is currently tracking 39 open NXP Semiconductors roles in Arizona, in Chandler. The count updates automatically as NXP Semiconductors adds and removes postings, and duplicate listings for the same role are merged.

What kinds of roles does NXP Semiconductors hire for in Arizona?

The largest categories among current listings at NXP Semiconductors in Arizona are manufacturing technicians & skilled trades (13), hardware & design engineering (6), process & equipment engineering (6), internships & early career (5). Categories are derived from job titles by Arizona AI.

Where in Arizona are NXP Semiconductors jobs located?

NXP Semiconductors lists Arizona roles in Chandler. Locations are shown exactly as NXP Semiconductors publishes them; the company's main Arizona site is Chandler, AZ. Employers sometimes label roles with the metropolitan area rather than the specific campus city.

How do I apply for a job at NXP Semiconductors in Arizona?

Each listing on this page links through to NXP Semiconductors' own application page. Arizona AI does not collect applications or charge job seekers, and roles are aggregated from the employer's official careers system rather than from third-party recruiters.

What does NXP Semiconductors do?

NXP is a Dutch public semiconductor company, incorporated in the Netherlands in 2006 and based in Eindhoven. Its annual report says its products are used in automotive, industrial and IoT, mobile, and communication infrastructure applications.

Does NXP make chips in Arizona?

Yes. NXP's 2025 annual report lists two wholly owned wafer fabs in Chandler: an 8-inch fab making CMOS, eNVM and BCDMOS chips and a 6-inch gallium nitride (GaN) fab. NXP said in 2024 that Chandler was home to two of its five front-end fabs. NXP announced in December 2025 that it plans to close the GaN fab by 2027, and Nokia agreed in July 2026 to acquire the Chandler campus.

When did NXP come to Arizona?

NXP says its Chandler Fab shipped its first silicon in 1994, before NXP existed. NXP acquired Freescale on December 7, 2015, for a total consideration of $11.6 billion, and Light Reading reported that the Chandler site came to NXP through that takeover.

Is NXP closing its Chandler GaN fab?

Yes. In December 2025 NXP announced it would exit the radio power business and close its GaN fab in Chandler by 2027, citing no outlook for recovery in that market. Light Reading reported the last GaN wafer is expected in the first quarter of 2027. NXP said at the time that its other Chandler fab would continue; in August 2026 it said that fab, Chandler Fab, is also part of the sale to Nokia. No NXP update to that schedule after December 2025 was found. Nokia, which agreed in July 2026 to acquire the Chandler campus, plans to lease part of the facility starting in early 2027.

Is Nokia buying NXP's Chandler fab?

Nokia disclosed on July 23, 2026, a definitive agreement to acquire NXP's Chandler Semiconductor Fabrication campus. Subject to regulatory approvals, Nokia plans to lease part of the facility from early 2027, convert the site to indium phosphide production for optical components, and acquire the full site, with closing expected in the first quarter of 2029. No price was stated. NXP said in an August 6, 2026 notice that the sale includes Chandler Fab and Chandler Probe in a phased approach over the next few years, and it is discontinuing the legacy products listed in that notice that will not move to another manufacturing site.

How many people does NXP employ in Arizona?

NXP said in August 2024 that some 750 employees kept its Chandler Fab running. Its annual report gives only a worldwide figure, approximately 32,169 employees at the end of 2025, with no Arizona breakdown.

Is NXP involved in AI?

Not through its Arizona fabs, based on the facts gathered. Company-wide, NXP closed its $284 million cash acquisition of Kinara, Inc. on October 27, 2025, with no Arizona link stated. Nokia, which agreed to buy the Chandler campus, cited the AI build-out as a reason to add indium phosphide capacity there.

Does NXP work with Intel or TSMC in Arizona?

No such tie is documented in NXP's 2025 annual report or its second-quarter 2026 report. NXP's TSMC ties are outside Arizona, including a 10% stake in the TSMC-majority ESMC fab in Dresden, Germany.

Does NXP partner with Arizona State University?

Yes. In December 2023 ASU announced a $17.5 million investment, supported by the Arizona Commerce Authority and in partnership with NXP, to expand fan-out wafer-level packaging research and workforce training, along with internships and GaN research for 6G with NXP in Chandler. The money went to ASU, not NXP. No update on the partnership after December 2023 was found.